Semantic search

Jump to navigation Jump to search
Condition
Printout selection
Options
Parameters [
limit:

The maximum number of results to return
offset:

The offset of the first result
link:

Show values as links
headers:

Display the headers/property names
mainlabel:

The label to give to the main page name
intro:

The text to display before the query results, if there are any
outro:

The text to display after the query results, if there are any
searchlabel:

Text for continuing the search
default:

The text to display if there are no query results
class:

An additional CSS class to set for the table
transpose:

Display table headers vertically and results horizontally
sep:

The separator between results
prefix:

Control display of namespace in printouts
Sort options
Delete
Add sorting condition
 Issue dateFromTitleProject stage
ML18109A11619 April 2018Exelon
James Barstow
Relief Requests Associated with the Fifth Inservice Inspection IntervalRequest
ML18128A3077 May 2018Jennifer Tobin
Plant Licensing Branch I
Acceptance Review for Peach Bottom - Relief Requests from ASME Section XI Code - 5th ISI IntervalAcceptance Review
ML18226A20114 August 2018Jennifer Tobin
Plant Licensing Branch I
Request for Additional Information - Relief Request I5R-05RAI
ML18262A04125 September 2018April Pulvirenti
Plant Licensing Branch IV
Request for Additional Information Regarding License Amendment Request to Revise Section 15.4.3.1 of the Waterford 3 Updated Final Safety Analysis Report to Account for Fuel MisloadRAI
ML18331A21621 December 2018James Danna
Plant Licensing Branch I
Issuance of Alternative Requests Related to the Fifth Inservice Inspection IntervalApproval
ML18337A19629 November 2018Exelon
David Helker
Submittal of the Fifth Ten-Year Interval Inservice Testing Program PlanRequest
ML19022A33713 February 2019April Pulvirenti
Plant Licensing Branch IV
Issuance of Amendment No. 253 to Revise Section 15.4.3.1 of the Updated Final Safety Analysis Report to Account for Fuel MisloadApproval
W3F1-2018-0059, (Waterford 3) - Response to NRC Request for Additional Information Regarding License Amendment Request to Update the Results for the Inadvertent Loading of a Fuel Assembly Into the Improper Position ...18 October 2018Entergy
Dinelli J
(Waterford 3) - Response to NRC Request for Additional Information Regarding License Amendment Request to Update the Results for the Inadvertent Loading of a Fuel Assembly Into the Improper Position ...Response to RAI