 Issue dateTitle
ML02266048023 September 2002Technical Specification Page for Peach Bottom Atomic Power Station, Unit 2 Amendment 246 Revision to Technical Specifications Safety Limit Minimum Critical Power Ratio for Cycle 15 Operation
ML03094027526 March 2003Submittal of EP-AA-1007, Revision 5, Exelon Nuclear Radiological Emergency Plan Annex, for Peach Bottom Atomic Power Station, Units 2 & 3
ML0311504487 May 2003Stations Unit 3 Appendix a, Technical Specifications - Part 1
ML0311504907 May 2003Appendix a, Technical Specifications - Part 1
ML03115058529 January 1985Withdrawn NRC Generic Letter 1985-004: Operator Licensing Examinations
ML03125030924 April 2003Submittal of Changes to TS Bases, Table of Contents Through Bases 3.3.2.1
ML03125032524 April 2003Submittal of Changes to TS Bases, Sections B 3.3.2.2 - B 3.3.8.2
ML03125040124 April 2003Submittal of Changes to TS Bases, Table of Contents Through Section B 3.6
ML03125043124 April 2003Submittal of Changes to TS Bases, Table of Contents Through Bases B 3.6
ML03125050724 April 2003Submittal of Changes to TS Bases, Table of Contents Through Bases B 3.3
ML03125051624 April 2003Submittal of Changes to TS Bases, B 3.3 Through 3.3.8.2
ML03184046223 June 2003License Amendment Request: AR A1418692, Safety Limit Minimum Critical Power Ratio (SLMCPR) Change
ML03203047214 July 2003Request for License Amendments Related to Application of Alternative Source Term
ML0327905303 October 2003Tech Spec Pages for Amendment 252 Revision to Technical Specifications Safety Limit Minimum Critical Power Ratio for Cycle 15 Operation
ML0335603029 December 2003Exelon/Amergen 180-Day Response to NRC Generic Letter 2003-01, Control Room Habitability.
ML04048049812 February 2004License Amendment Request Regarding Main Steam Tunnel Temperature - High
ML0514004362 May 2005Improved Technical Specifications (Unit 2 Bases)
ML0514004382 May 2005Improved Technical Specifications (Unit 3 Bases)
ML05206010410 June 2005Final - Lsro Written Examination with Answer Key (Folder 3)
ML0520602101 May 2005Draft - Lsro Written Exam (Folder 2)
ML05224017211 August 2005Tech Spec Pages for Amendments 256 and 259 Elimination of Requirements for Hydrogen and Oxygen Monitors
ML0527202667 May 2003Current Facility Operating License DPR-44, Tech Specs, Revised 01/24/2020
ML05356018521 December 2005License Amendment Request, Incorporation of Previously NRC-Approved Generic Technical Specification Changes - Submittal of Camera Ready Technical Specification Pages
ML06107029210 May 2006Issuance of Amendment Incorporation of Previously NRC-Approved Generic Technical Specification Changes
ML06128053824 April 2006PBAPS Unit 2 - Technical Specifications Bases Page Revision Listing
ML06131006210 May 2006Tech Spec Pages for Amendments 259 and 262, Incorporation of Previously NRC-Approved Generic Technical Specification Changes
ML07038029222 November 2006Draft - RO & SRO Written Exam (Folder 2)
ML07061049129 January 2007Final - RO & SRO Written Examination with Answer Key (401-5 Format) (Folder 3)
ML07104001728 April 199459 FRN 12990, Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations
ML0806704197 March 2008CDBI Findings
ML08135036328 April 2008Changes to Technical Specifications Bases
ML08135036628 April 2008Changes to Technical Specifications Bases
ML08150037323 May 2008Response to Request for Additional Information Concerning License Amendment Request - Application of Alternative Source Term
ML0822405207 August 2008License Amendment Request to Incorporate Previously NRC-Approved TSTFs and Other Administrative Technical Specifications Changes
ML08323005613 November 2008Submittal of Program for the Fourth Ten-Year Interval Inservice Testing Program
ML09128060817 April 2009Changes to Technical Specifications Bases, Including Changes Through 04/08/2009
ML0936200127 December 2009Final Written Examination with Answer Key (401 - 5 Format)
ML10084075224 March 2010Request for Amendment to Technical Specification 3.1.7, Standby Liquid Control (SLC) System.
ML10148055527 May 2010License Amendment Request - Safety Limit Minimum Critical Power Ratio Change
ML1021501106 June 2010and Peach Bottom Lsro - Draft Written Exam (Folder 2)
ML1024202489 July 2010and Peach Bottom Lsro - Final Written Examination with Answer Key (401-5 Format)
ML10250049522 April 2010Changes to Technical Specifications Bases
ML10250049722 April 2010Changes to Technical Specifications Bases
ML11126A31015 April 2011Unit Unit 3 Technical Specifications Bases, Page B 3.3-66, Through Page B 3.10-36
ML1116001808 June 2011License Amendment Request - Safety Limit Minimum Critical Power Ratio Change
ML11192A30028 October 2010Preliminary Draft NUREG-1935, Rev. 3, State-of-the-Art Reactor Consequence Analyses (Soarca) Project. Appendix a (Draft), Peach Bottom Integrated Analysis. Part 1 of 3
ML11256A02330 September 2011NUREG-1953 Confirmatory Thermal-Hydraulic Analysis to Support Specific Success Criteria in the Standardized Plant Analysis Risk Models - Surry and Peach Bottom.
ML12124A07617 December 2009Draft NUREG State-Of-The-Art Reactor Consequence Analyses (Soarca) Project Appendix a Peach Bottom Integrated Analysis, W/Handwritten Notes
ML12124A09112 April 2012PBAPS Unit 2 - License No. DPR-44 Technical Specifications Bases
ML12124A09212 April 2012PBAPS Unit 3 - License No. DPR-56 Technical Specifications Bases