Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML021070319 | 2 April 2002 | Changes to Technical Specifications Bases Sections 3/4.1.3, 3/4.3.1, 3/4.3.2, 3/4.3.3.6, 3/4.4.1, 3/4.4.4, 3/4.4.6.1, 3/4.4.6.2, 3/4.5.2, 3/4.5.3, 3/4.6.2.1, 3/4.6.2.2, 3/4.6.3, 3/4.6.6.1, 3/4.7.1.2, 3/4.7.8 |
ML021570531 | 3 June 2002 | Technical Specification Bases Changes for Millstone, Unit 3 |
ML031150585 | 29 January 1985 | Withdrawn NRC Generic Letter 1985-004: Operator Licensing Examinations |
ML032250048 | 31 July 2003 | Changes to Technical Specifications Bases |
ML040610977 | 26 February 2004 | Correction to Technical Specifications |
ML040770050 | 10 March 2004 | Transmittal of Technical Specifications Pages, Selective Implementation of the Alternative Source Term (AST) Fuel Handling Accident Analyses |
ML040820671 | 17 March 2004 | Tech Spec Pages for Amendment 219, Selective Implementation of Alternate Source Term |
ML042650363 | 8 September 2004 | Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process |
ML051540259 | 31 May 2005 | Connecticut, Inc, Millstone Power Station Unit 3, Changes to Technical Specifications Bases |
ML051820139 | 29 June 2005 | Limiting Condition for Operation and Surveillance Requirements |
ML052270073 | 18 April 2005 | Event Notification Report for April 18, 2005 |
ML052410281 | 25 August 2005 | TS Bases Pages Regarding Limiting Safety System Settings |
ML052720310 | 28 November 2005 | Current Facility Operating License NPF-49, Tech Specs, Revised 05/31/2019 |
ML053250215 | 28 November 2005 | Technical Specifications for Millstone Nuclear Power Station - Unit 3 |
ML060650507 | 3 March 2006 | Changes to Technical Specifications Bases |
ML060760208 | 16 March 2006 | Tech Spec Pages for Amendments 291 and 229 Regarding Administrative Changes to Technical Specifications |
ML061030234 | 12 April 2006 | Changes to the Technical Specifications Bases - 3/4.7.4 Service Water System (Continued) - 3/4.9 Refueling Operations |
ML071040017 | 28 April 1994 | 59 FRN 12990, Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations |
ML082610449 | 8 September 2008 | Transmittal of Changes to Technical Specification Bases |
ML091120075 | 31 March 2009 | Post Exam Comment SRO Question #77 References (Folder 1) |
ML092580659 | 9 September 2009 | Changes to Technical Specification Bases |
ML102390403 | 19 August 2010 | Changes to Technical Specification Bases |
ML11193A223 | 5 July 2011 | License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3, Attachment 1 Through Attachment 3, Marked-up TS Page Changes 3/4 6-22 |
ML11262A003 | 12 September 2011 | Supplement to License Amendment Request to Relocate Technical Specification Surveillance Frequencies to Licensee Controlled Program |
ML12081A129 | 9 March 2012 | Changes to Technical Specification Bases |
ML12284A213 | 4 October 2012 | License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3 |
ML13079A226 | 6 March 2013 | Submittal of Changes to Technical Specification Bases |
ML14023A748 | 25 February 2014 | Issuance of Amendment Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (Adoption of TSTF-425, Revision 3) |
ML14070A346 | 6 March 2014 | Changes to Technical Specification Bases |
ML15065A334 | 26 February 2015 | Changes to Technical Specification Bases |
ML17212A073 | 29 June 2017 | Final Safety Analysis Report, Rev. 30, Chapter 4, Reactor |
ML18247A265 | 18 June 2018 | Revision 36 to Final Safety Analysis Report, Chapter 4, Reactor |
ML19011A171 | 4 January 2019 | Enclosures 1 to 3 - EAL Scheme Revisions Enclosure Summary, Discussion of Change and Mps EAL Scheme Revisions-Supporting Documents |
ML19011A172 | 4 January 2019 | Enclosure 3, Attachments 2C-3C - MPS3 EAL Technical Bases Document (Marked-Up) |
ML19011A173 | 4 January 2019 | Enclosure 4 - North Anna Power Station Units 1 & 2, EAL Scheme Revisions-Supporting Documents |
ML19011A174 | 4 January 2019 | Enclosure 5 - Surry Power Station, EAL Scheme Revisions-Supporting Documents |
ML19052A161 | 14 February 2019 | Changes to Technical Specification Bases |
ML19249B768 | 29 August 2019 | Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) |
ML19249B772 | 29 August 2019 | Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) |
ML19249B774 | 29 August 2019 | Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) |
ML20039D165 | 31 December 1981 | Proposed Tech Spec Section 3/4.9.8 Re Shutdown Cooling & Coolant Circulation During Refueling Operations |
ML20063L287 | 26 February 2020 | Technical Specification Bases Pages |
ML20070M639 | 25 April 1994 | Proposed Tech Specs,Reflecting Consistency W/Proposed Changes in GL 90-06 Re Resolution of Generic Issues 70 & 94 |
ML20071M868 | 30 June 1994 | Proposed Rev to Ts,Gl 93-05 & Various Administrative Changes,Marked Up Pages,940630 |
ML20071M873 | 30 June 1994 | Proposed Rev to Ts,Gl 93-05 & Various Administrative Changes,Retyped Pages,940630 |
ML20072L319 | 25 August 1994 | Proposed Tech Specs Incorporating Changes Suggested by Section 7.1 of GL 93-05 |
ML20099C098 | 27 July 1992 | Application for Amend to License NPF-49,revising TS Section 3.3.3.6 for Reactor Vessel Water Level by Incorporating Generic Requirements for Rvlm Sys |
ML20128F246 | 24 November 1969 | Provides Rept W/Annotations Re Facility.Concludes That Facility Can Be Operated W/O Endangering Health & Safety of Public Flooding Potential at Site Due to Probable Max Hurricane & Inservice Insp Program |
ML20128L036 | 31 July 1985 | Probablistic Safety Study, Vols 1-4.W/78 Oversize Drawings.Aperture Cards Available in PDR |
ML20134A653 | 31 October 1985 | Safety Evaluation Report Related to the FULL-TERM Operating License for Millstone Nuclear Power Station,Unit No. 1.Docket No. 50-245.(Northeast Nuclear Energy Company) |