Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML16305A094 | 20 October 2016 | Renewed Facility Operating License |
ML16305A141 | 20 October 2016 | Document Transmittal Regarding Issue MNS FOL U-2, Rev. 3 |
ML17087A272 | 22 March 2017 | Renewed Facility Operating License - Amendment 293 |
ML17171A278 | 12 June 2017 | Revision 163 to Issue MNS-SLC-16.7.12 Leading Edge Flow Meter |
ML17237A045 | 17 August 2017 | FOL Revisions and Loep |
ML17356A178 | 13 December 2017 | Attachment 1: WCAP-18265-NP, Rev. 0, Aging Management Program and Inspection Plan for the McGuire Nuclear Station Units 1 & 2 Reactor Vessel Internals. |
ML20093D926 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 5 |
ML20093G903 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 10 |
ML20095H470 | 11 April 2019 | Updated Final Safety Analysis Report, Chapter 15 |
ML20309A728 | 8 October 2020 | 2 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System |
ML20309A752 | 8 October 2020 | 2 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis |
ML20309A773 | 8 October 2020 | 2 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System |
ML22290A101 | 29 November 2022 | Issuance of Amendment Nos. 326 and 305, Regarding Changes to Technical Specification 3.4.3, Reactor Coolant System Pressure Temperature Limits |
MNS-14-102, Emergency Response Data System Changes | 16 December 2014 | Emergency Response Data System Changes |
MNS-15-013, Submits a License Amendment Request for the Renewed Facility Operating Licenses and Technical Specifications to Remove a Superseded TS Requirement | 23 March 2015 | Submits a License Amendment Request for the Renewed Facility Operating Licenses and Technical Specifications to Remove a Superseded TS Requirement |
MNS-15-016, Summary Report of Evaluations Performed Pursuant to 10 CFR 50.59 Changes, Tests, and Experiments | 19 March 2015 | Summary Report of Evaluations Performed Pursuant to 10 CFR 50.59 Changes, Tests, and Experiments |
MNS-17-038, Startup Ascension Summary Report Measurement Uncertainty Recapture Power Uprate | 25 September 2017 | Startup Ascension Summary Report Measurement Uncertainty Recapture Power Uprate |
RA-15-0005, Duke Energy - Response to Regulatory Issue Summary (RIS) 2014-13, Planned Licensing Action Submittals for All Power Reactor Licensees | 5 February 2015 | Duke Energy - Response to Regulatory Issue Summary (RIS) 2014-13, Planned Licensing Action Submittals for All Power Reactor Licensees |
RA-15-001, Catawba, McGuire, and Oconee - License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Foot | 15 July 2015 | Catawba, McGuire, and Oconee - License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footn |
RA-15-0013, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 | 15 July 2015 | License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 |
RA-21-0320, License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits | 20 December 2021 | License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits |