Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML19323D58310 April 1980Statement of Position on Intervenor Proposed 40 Contentions. Asserts Reasonable Specificity of Submitted Contentions Warranting Admissibility Due to Concerns Raised in Public Interest.Certificate of Svc Encl
ML20055E4873 July 1990Expresses Appreciation for Volunteering to Participate in Emergency Response Data Sys (Erds).Implementation of ERDS Will Prove to Be Beneficial to Both NRC & Util.Survey Designed to Provide Hardware & Communications Info Encl
ML20094G78428 February 1992Proposed Tech Specs 3.3.1,Table 3.3-1,Functional Unit 6.b, Boron Dilution Flux Doubling
ML20147D9006 January 1988Forwards First Draft Tech Specs,Description of SER Items Requiring Util to Propose Tech Specs & Current Schedule for Tech Spec Review Showing Major Util Milestones
ML20147E6162 March 1988Forwards Draft Tech Spec Prepared from 871203 Draft & Supplemented by Info from NRC 880110 Meeting W/Util. Preparation of Proof & Review Scheduled to Begin on 880321 & Issuance of Proof & Review Expected by 880404
ML20151Z51223 February 1988Forwards Typed Version of Second Draft of Facility Tech Specs
ML20154C13930 September 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-445/98-03 & 50-446/98-03 Issued on 980702.Reply Reviewed & Found Responsive to Concerns Raised in NOV
ML20154M62215 October 1998Requests Review & Approval of Certain Proposed Changes to CPSES Emergency Plan,Per 10CFR50.54(q).Description of Proposed Plan Changes & justifications,marked-up Copy of Current Plan Affected Pages & New Plan Pages,Encl
ML20195H91115 January 1988Discusses Amend 66 to FSAR Including Updates,Clarifications, Revs,Corrections,Additions & Editorial Changes as Well as Revised Effective Page Listing for Affected Portions of Rept.Summary of Changes Encl
ML20205K8197 April 1999Submits Response to RAI Re Util 981015 Submittal for NRC Review & Approval of Changes to Emergency Plan,Per NRC 990324 & 0401 Requests
ML20206J9379 February 1987Forwards Quarterly Status Rept for Fourth Quarter of Calendar Year 1986,in Response to Direction Given in House Rept 97-850.NRC Licensing Activity During Period of Rept Includes Issuance of full-power License for Perry Unit 1
ML20210J9201 February 1999CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201
ML20210L9565 February 1987Forwards NRR Monthly Status Rept,Including Info Available as of 870131.Rept Identifies Potential or Actual Licensing Delay for Shoreham,Comanche Peak Unit 1,Braidwood Unit 1 & Seabrook Unit 1
ML20226A4293 August 2020Technical Specifications Bases, Revision 78
ML20249B01217 June 1998Forwards RAI Re Proposed Conversion to Improved Std TSs for Plant,Units 1 & 2.Response Requested within 30 Days of Receipt of Ltr
ML21299A01523 September 2021CP-2021-08-DRAFT Make Up Op Test Outlines
ML21299A01623 September 2021CP-2021-08-DRAFT Make Up Op Test
ML21299A02323 September 2021CP-2021-08-FINAL Make Up Op Test Outlines
ML21299A02423 September 2021CP-2021-08-FINAL Make Up Op Test
ML22038A1641 February 2022Technical Specification Bases, Revision 83
NRC Generic Letter 1985-0217 April 1985NRC Generic Letter 1985-002: Staff Recommended Actions Stemming from NRC Integrated Program for the Resolution of Unresolved Safety Issues Regarding Steam Generator Tube Integrity
NRC Generic Letter 1985-0531 January 1985NRC Generic Letter 1985-005: Inadvertent Boron Dilution Events
NRC Generic Letter 1985-072 May 1985NRC Generic Letter 1985-007: Implementation of Integrated Schedules for Plant Modifications
NRC Generic Letter 1985-0823 May 1985NRC Generic Letter 1985-008: 10 CFR 20.408 Termination Reports - Format
NRC Generic Letter 1985-0923 May 1985NRC Generic Letter 1985-009: Technical Specifications for Generic Letter 1983-028, Item 4.3
NRC Generic Letter 1992-0419 August 1992NRC Generic Letter 1992-004 - Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs Pursuant to 10 CFR 50.54(F)
NRC Generic Letter 1998-0228 May 1998NRC Generic Letter 1998-002: Loss of Reactor Coolant Inventory and Associated Potential for Loss of Emergency Mitigation Functions While in a Shutdown Condition
TXX-3534, Forwards Description of Plant Conformance W/Reg Guide 1.97, Revision 2.Documentation Will Be Reflected in Next Revision to FSAR30 June 1982Forwards Description of Plant Conformance W/Reg Guide 1.97, Revision 2.Documentation Will Be Reflected in Next Revision to FSAR
TXX-4205, Forwards Revised Schedules for Installation of Accident Monitoring Instrumentation for Reactor Vessel Water Level. Installation Scheduled Prior to End of First Refueling Outage.Amend 50 to FSAR Will Reflect Changes26 June 1984Forwards Revised Schedules for Installation of Accident Monitoring Instrumentation for Reactor Vessel Water Level. Installation Scheduled Prior to End of First Refueling Outage.Amend 50 to FSAR Will Reflect Changes
TXX-8924, Affirms & Certifies That Tech Specs Accurately Reflect as-built Plant & FSAR Per .Exceptions Listed, Including Accident Monitoring Instrumentation15 May 1989Affirms & Certifies That Tech Specs Accurately Reflect as-built Plant & FSAR Per .Exceptions Listed, Including Accident Monitoring Instrumentation