EPID:L-2016-LRC-0002 | 27 October 2017 | 27 October 2017 | |
EPID:L-2017-FPR-0002 | Package: Environmental Assessment and Finding of No Significant Impact for the Virginia Electric and Power Company, Dominion Energy Kewaunee, Inc., and Dominion Nuclear Connecticut, Inc.'S (Collectively, Dominion) Decommissioning Funding Pl | 6 March 2019 | 8 August 2019 |
EPID:L-2017-LLA-0316 | Proposed License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals | 4 October 2017 | 25 September 2018 |
EPID:L-2017-LRO-0076 | 12 February 2018 | 12 February 2018 | |
EPID:L-2018-LLA-0099 | License Amendment Request to Revise Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels | 4 April 2018 | 21 March 2019 |
EPID:L-2018-LLA-0126 | License Amendment Request Regarding Proposed Technical Specifications Changes for Spent Fuel Storage and New Fuel Storage | 3 May 2018 | 6 June 2019 |
EPID:L-2018-LLR-0011 | Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | 29 June 2017 | 17 September 2018 |
EPID:L-2018-LLR-0012 | In-service Testing Program for Pumps, Valves, & Snubbers Fifth & Fourth 10-Year Interval Updates for Units 2 & 3 | 1 March 2018 | 13 November 2018 |
EPID:L-2018-LLR-0078 | Proposed Alternative Request P-06 for 'C' Charging Pump Test | 29 May 2018 | 4 October 2018 |
EPID:L-2018-LRM-0021 | 04/10/2018 Public Teleconference Meeting Slides MPS3 C Charging Pump | 25 April 2018 | |
EPID:L-2018-LRM-0077 | 8 November 2018 | 7 December 2018 | |
EPID:L-2018-LRM-0086 | ISFSIs - License Amendment Request to Adopt Emergency Action Level (EAL) Schemes Pursuant to NEI 99-01, Rev. 6 | 4 January 2019 | 30 May 2019 |
EPID:L-2018-LRO-0005 | ISFSI, North Anna, Units 1, 2 and 3, ISFSI, Surry, Units 1 and 2, ISFSI, Kewaunee, and ISFSI - Request for Threshold Determination Under 10 C.F.R. 50.80 | 31 January 2018 | 29 August 2018 |
EPID:L-2019-LLA-0003 | Independent Spent Fuel Storage Installation (Isfsi); North Anna, Units 1 and 2 and ISFSI; and Surry, Units 1 and 2 and ISFSI - License Amendment Request to Adopt Emergency Action Level Schemes Pursuant to NEI 99-01, Rev. 6. | 5 February 2019 | 31 December 2019 |
EPID:L-2019-LLA-0008 | 12/17/2019 E-mail from S. Sinha to R. Guzman - Proposed License Conditions for License Amendment Request 10 CFR 50.69 | 27 February 2019 | 30 January 2020 |
EPID:L-2019-LLA-0077 | TSTF-522 | 11 April 2019 | 2 May 2019 |
EPID:L-2019-LLA-0164 | 6 September 2019 | 7 August 2020 | |
EPID:L-2019-LLA-0165 | 6 September 2019 | 15 July 2020 | |
EPID:L-2019-LLA-0177 | TSTF-425, TSTF-425 | 17 January 2019 | 24 June 2020 |
EPID:L-2019-LLA-0186 | TSTF-569 | 1 March 2022 | |
EPID:L-2019-LLA-0288 | License Amendment Request to Revise TS 6.25, Pre-Stressed Concrete Containment Tendon Surveillance Program | 17 December 2019 | 29 September 2020 |
EPID:L-2019-LLR-0012 | 6 March 2019 | 30 April 2019 | |
EPID:L-2019-LLR-0014 | Proposed Alternative Request IR-3-39, Alternative to ASME Code, Section XI, IWA-4221(C), to Permit Two Fillet Welds Not in Compliance with the Construction Code to Remain in Service | 28 February 2019 | 13 December 2019 |
EPID:L-2019-LLR-0031 | Proposed Alternative Requests RR-05-01 and RR-05-02 for the Fifth 10-Year Inservice Inspection Interval | 29 March 2019 | 18 December 2019 |
EPID:L-2019-LLR-0033 | Proposed Alternative Request IR-4-01 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography | 29 March 2019 | 18 December 2019 |
EPID:L-2019-LLR-0095 | 24 September 2019 | 24 March 2020 | |
EPID:L-2019-LLR-0120 | Proposed Alternative Request RR-05-05, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements | 17 December 2019 | 20 October 2020 |
EPID:L-2019-LRM-0004 | Presentation Material for 1/22/19 Pre-Submittal Meeting Fillet Weld Preheat Alternative Request | 22 January 2019 | 15 February 2019 |
EPID:L-2019-LRM-0020 | 9 May 2019 | 7 June 2019 | |
EPID:L-2019-LRM-0026 | 3 June 2019 | 12 July 2019 | |
EPID:L-2019-LRO-0106 | 16 December 2020 | 16 December 2020 | |
EPID:L-2019-OLL-0017 | |||
EPID:L-2020-JLD-0000 | Response to March 12, Request for Information Enclosure 2, Recommendation 2.1, Flooding Focused Evaluation/Integrated Assessment Submittal | 10 February 2020 | 13 August 2020 |
EPID:L-2020-LLA-0027 | TSTF-510 TSTF-577, TSTF-425 TSTF-52 | 19 February 2020 | 18 March 2021 |
EPID:L-2020-LLA-0039 | License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation | 3 March 2020 | 23 February 2021 |
EPID:L-2020-LLA-0094 | Notice of Category 3 Public Meeting - Annual Assessment Meeting for Millstone Power Station | 8 April 2020 | 25 March 2021 |
EPID:L-2020-LLA-0178 | Connecticut. Inc. Millstone Power Station Unit 3, Proposed License Amendment Request for a One-Time Extension of the Millstone Unit 3 Steam Generator Inspections | 11 August 2020 | 14 October 2020 |
EPID:L-2020-LLA-0227 | TSTF-510 TSTF-577, TSTF-510 TSTF-577 | 24 February 2020 | 9 September 2021 |
EPID:L-2020-LLA-0242 | Proposed License Amendment Request, Addition of Analytical Methodology to the Core Opera Ting Limits Report for a Full Spectrum Loss of Coolant Accident (Fsloca) Gamma Energy Redistribution Information | 28 February 2020 | 19 October 2021 |
EPID:L-2020-LLA-0266 | 11 January 2021 | 7 January 2022 | |
EPID:L-2020-LLD-0000 | EA-22-008 | 27 January 2022 | 3 February 2022 |
EPID:L-2020-LLE-0092 | Annual Assessment Meeting for Millstone Power Station - NRC Presentation Slides | 20 April 2020 | 12 June 2020 |
EPID:L-2020-LLE-0145 | 24 November 2020 | 24 November 2020 | |
EPID:L-2020-LLE-0227 | 16 December 2020 | 16 December 2020 | |
EPID:L-2020-LLR-0024 | ASME Section XI Inservice Inspection Program: Relief Request for Limited Coverage Examinations Performed in the Second Period of the Fourth 10-Year Inspection Interval | 11 February 2020 | 10 December 2020 |
EPID:L-2020-LLR-0028 | ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Second Period of the Third 10-Year Inspection Interval | 17 February 2020 | 10 December 2020 |
EPID:L-2020-LLR-0038 | Alternative Request IR-4-03 for Use of an Alternative Non-Code Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping | 14 March 2020 | 16 July 2020 |
EPID:L-2020-LLR-0081 | 16 July 2020 | 30 June 2021 | |
EPID:L-2020-LLR-0097 | Alternate Request RR-05-06 - Inspection Interval Extension for Steam Generator Pressure Retaining Welds and Full-Penetration Welded Nozzles | 15 July 2020 | 16 July 2021 |
EPID:L-2020-LLR-0115 | ASME Code Case N-885 | 1 February 2021 | 26 March 2021 |