Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20063N7544 October 1982Responses to Applicant & NRC 820903 & NRC 820910 Responses to M Sinclair Revised Contentions.Limiting Contention 31 to Litigation of Util Compliance W/Existing Requirements.Contention 32 Amended
ML20065C11820 September 1982Resubmission of Contention 56 on Station Blackout.Related Correspondence
ML20065C12222 September 1982Revised Contentions (II) Based on Remainder of Discovery from NRC Per ASLB 820525 Order.Related Correspondence
ML20065H66930 September 1982Response to M Sinclair 820920 Revised Contentions,Set Ii. Objects to Contentions 34(a),37 & 43 & Portions of Contentions 6 & 57.Util Nonconformance Rept & Certificate of Svc EnclAffidavit
ML20065H68828 September 1982Response to M Sinclair Resubmitted Contention on Table S-3. Contention Should Be Deferred Until Commission Issues Policy Statement.Certificates of Svc Encl
ML20065H72028 September 1982Responses Opposing B Stamiris 820913 Addendum to 820824 Cost Benefit Contention.Good Cause for Late Filing Not Demonstrated.Certificate of Svc Encl
ML20065J75030 September 1982Response Opposing M Sinclair Resubmitted Contention 56 on Station Blackout.Contention Lacks Requisite Basis & Specificity to Stand Alone.Certificate of Svc EnclTurbine Missile
ML20065M71615 October 1982Response to Util 820923 & NRC 820928 Response to B Stamiris New Contention Based on Fes.Gross Misrepresentation of Overall Costs & Benefits to Public Represented by Cost/ Benefit Analysis Demands Redress
ML20069F94523 September 1982Response Opposing B Stamiris 820824 New Contention Challenging cost-benefit Analysis of Fes.Production Cost Estimates Unrepresentative,Inconsistent & Untimely & Provide Inadequate Basis for Contention.Certificate of Svc Encl
ML20071K78328 July 1982Response Opposing M Sinclair 820618 New Contentions. Contentions Untimely.Good Cause for Late Filing Not Shown. Contentions Lack Basis & Specificity &/Or Raise Issues Being Resolved in Another Forum
ML20071K79028 July 1982Further Answer Opposing B Stamiris Petition to Intervene as Supplemented by 820709 Amended Contentions.Petitioner Fails to Meet Requirements for Late InterventionSafe Shutdown
Ultimate heat sink
Hydrostatic
ML20081C5094 March 1984Contention on Transamerica Delaval Diesel Generators Re Model Dsrv 12.Model Cannot Be Relied Upon to Perform Requisite Safety Function
ML20081C93626 October 1983Motion to Stay ASLB 830831 & 1006 Orders Denying Deponent Motion for Reconsideration of Motion to Quash Subpoenas Pending Aslab Decision on Deponent 831021 Appeal.Certificate of Svc Encl.Related Correspondence
ML20081F87128 October 1983Motion to Reopen & Suppl Record on Sinclair Contention 14,to Submit DA Sommers,Jp Bradley & CR Nefe Affidavits.Affidavits Provide Results of Postulated Evergreen Fog Sweep or Planted Barrier Analysis
ML20084K87711 May 1984Intervenor B Stamiris Second Supplemental Proposed Findings of Fact & Conclusions of Law Re QA & Mgt Attitude Issues. Determination of Whether 791206 Order of Mod Should Be Sustained Is Only Outstanding Issue to Be DecidedUltimate heat sink
ML20087G79215 March 1984Addendum to Stamiris Contention on Transamerica Delaval,Inc Diesel Generators Addressing Late Filing Factors of 10CFR2.714