Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20246C9093 May 1989Special Rept SR-89-001-01:on 890206 & 0403,emergency Diesel Generator a Declared Inoperable.Caused by Fuse Not Being Secured in Fuse Holder & Oxidation of Speed Control Circuit Relay Contacts.Contacts Cleaned & Fuses & Holders Checked
W3P85-1476, Special Rept 85-001-00:on 850905,while in Mode 5,two Triazial Peak Accelerographs in Reactor Bldg Discovered Damaged by Heat & Vibration.Engineers Studying Possibility of Relocating Instruments16 September 1985Special Rept 85-001-00:on 850905,while in Mode 5,two Triazial Peak Accelerographs in Reactor Bldg Discovered Damaged by Heat & Vibration.Engineers Studying Possibility of Relocating Instruments
W3P86-0015, Special Rept SR-85-002-00:on 851230,discovered That on 851213,emergency Diesel Generator a Did Not Satisfactorily Complete Surveillance Run,Per Procedure OP-903-068 & Tech Spec 4.8.1.1.20.5.Cause Unknown29 January 1986Special Rept SR-85-002-00:on 851230,discovered That on 851213,emergency Diesel Generator a Did Not Satisfactorily Complete Surveillance Run,Per Procedure OP-903-068 & Tech Spec 4.8.1.1.20.5.Cause Unknown
W3P86-0043, Special Rept SR-86-001:on 860209,containment High Range Effluent Monitor Declared Inoperable for Greater than 7 Days.Cause Cannot Be Determined Due to Location of Monitor. Alternate Monitoring Method Initiated4 March 1986Special Rept SR-86-001:on 860209,containment High Range Effluent Monitor Declared Inoperable for Greater than 7 Days.Cause Cannot Be Determined Due to Location of Monitor. Alternate Monitoring Method Initiated
W3P87-0237, Suppl 1 to Special Rept SR-85-001:on 850916,seismic Monitor Mounted on Pressurizer Found Damaged & Inoperable.Relocation of Seismic Monitor Completed,But Tech Spec Not Yet Approved19 January 1987Suppl 1 to Special Rept SR-85-001:on 850916,seismic Monitor Mounted on Pressurizer Found Damaged & Inoperable.Relocation of Seismic Monitor Completed,But Tech Spec Not Yet Approved