DCL-84-023, Forwards Summary of Former Bostrom-Bergen/Meddco Metals Employees Allegations (Sser 21,Allegation 99) Per 840116 Request.Util Currently Confirming Each Allegation W/Respective Alleger | 20 January 1984 | Forwards Summary of Former Bostrom-Bergen/Meddco Metals Employees Allegations (Sser 21,Allegation 99) Per 840116 Request.Util Currently Confirming Each Allegation W/Respective Alleger | |
DCL-84-029, Forwards Info Re Testing of Carboline Protective Coatings Used in Containment Bldgs,In Response to NRC 831205 Request at Meeting Concerning QC Program for Painting (Sser 21,Allegation 100) | 24 January 1984 | Forwards Info Re Testing of Carboline Protective Coatings Used in Containment Bldgs,In Response to NRC 831205 Request at Meeting Concerning QC Program for Painting (Sser 21,Allegation 100) | Fire Barrier Hydrostatic Coatings |
DCL-84-030, Forwards Bostrom-Bergen/Meddco Metals Allegations Investigations Interim Rept, Per 840116 Commitment.Rept Provides Status of Investigation of Sser 21,Allegation 99 | 26 January 1984 | Forwards Bostrom-Bergen/Meddco Metals Allegations Investigations Interim Rept, Per 840116 Commitment.Rept Provides Status of Investigation of Sser 21,Allegation 99 | |
DCL-84-031, Forwards Util Response to Allegations 25,58 & 96 Described in Sser 21 Re Expansion Anchors.Util Responses Re HP Foley Procedure for Installation of Anchor Bolts Will Be Submitted Next Wk | 27 January 1984 | Forwards Util Response to Allegations 25,58 & 96 Described in Sser 21 Re Expansion Anchors.Util Responses Re HP Foley Procedure for Installation of Anchor Bolts Will Be Submitted Next Wk | |
DCL-84-043, Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) | 6 February 1984 | Forwards Rev 11 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) | |
DCL-84-045, Submits Design & Const Status of Design Change Notice DCO-EE-446 Re Control Room Ventilation & Pressurization Sys. Design & Const Complete.Repair,Testing Activities & Resolution Scheduled to Be Completed by 840215 | 7 February 1984 | Submits Design & Const Status of Design Change Notice DCO-EE-446 Re Control Room Ventilation & Pressurization Sys. Design & Const Complete.Repair,Testing Activities & Resolution Scheduled to Be Completed by 840215 | |
DCL-84-059, Forwards Results of Review of Electrical Contractor Insp Records Re Use of Concrete Expansion Anchors in Electrical Raceway Supports.Ack of Receipt of Matl Requested.Supporting Documentation Encl | 16 February 1984 | Forwards Results of Review of Electrical Contractor Insp Records Re Use of Concrete Expansion Anchors in Electrical Raceway Supports.Ack of Receipt of Matl Requested.Supporting Documentation Encl | Scaffolding |
DCL-84-065, Forwards Util Response to Sser Item 57 Re NRC Questions About Qualification & Certification of HP Foley Co QC Inspectors.Info Re Qualification of Pullman Power Products QC Inspectors Will Be Provided in Near Future | 17 February 1984 | Forwards Util Response to Sser Item 57 Re NRC Questions About Qualification & Certification of HP Foley Co QC Inspectors.Info Re Qualification of Pullman Power Products QC Inspectors Will Be Provided in Near Future | Earthquake |
DCL-84-068, Forwards Partial Response to Questions on Sser 21,Items 61 & 102 Re Design Control Process for Plant.Encls 2 & 3 Describe Method for Closure of Completed Work & Responds to Questions Raised at 840119 Exit Interview,Respectively | 17 February 1984 | Forwards Partial Response to Questions on Sser 21,Items 61 & 102 Re Design Control Process for Plant.Encls 2 & 3 Describe Method for Closure of Completed Work & Responds to Questions Raised at 840119 Exit Interview,Respectively | Hydrostatic |
DCL-84-074, Forwards Suppl to 840215 Response to SECY-84-61,Items 71,73 & 183 Re Sale & Use of Drugs at Plant | 24 February 1984 | Forwards Suppl to 840215 Response to SECY-84-61,Items 71,73 & 183 Re Sale & Use of Drugs at Plant | |
DCL-84-080, Forwards Program Description for HP Foley Co Quality Records Review & Turnover,In Response to Questions Raised by NRC at 840119 Exit Interview | 29 February 1984 | Forwards Program Description for HP Foley Co Quality Records Review & Turnover,In Response to Questions Raised by NRC at 840119 Exit Interview | Fire Watch |
DCL-84-081, Forwards Interim Rept of Bostrom-Bergen/Meddco Metal Matls Sampling Program,Per Sser 21-Allegation 99.Rept Provides Status of Util Investigation & Sampling Program Results to Date Re Allegations by Former Employees | 29 February 1984 | Forwards Interim Rept of Bostrom-Bergen/Meddco Metal Matls Sampling Program,Per Sser 21-Allegation 99.Rept Provides Status of Util Investigation & Sampling Program Results to Date Re Allegations by Former Employees | |
DCL-84-082, Forwards Util Response to Sser 21,Item 23 Re Qualification of Pullman Power Products QC Welding Inspectors | 29 February 1984 | Forwards Util Response to Sser 21,Item 23 Re Qualification of Pullman Power Products QC Welding Inspectors | |
DCL-84-084, Forwards Response to 840222 Request for Addl Info Re Bostrom-Bergen Welding Procedures.Response Details Procedure Spec Qualifications | 29 February 1984 | Forwards Response to 840222 Request for Addl Info Re Bostrom-Bergen Welding Procedures.Response Details Procedure Spec Qualifications | |
DCL-84-085, Forwards Response to Issues Identified in Board Notification 84-014 Re Valve Min Wall Thickness Measurements Originally Performed in 1973 & 1974.From Review of allegation,22 Issues Addressed,Including Issue Raised in Ho Hudson | 29 February 1984 | Forwards Response to Issues Identified in Board Notification 84-014 Re Valve Min Wall Thickness Measurements Originally Performed in 1973 & 1974.From Review of allegation,22 Issues Addressed,Including Issue Raised in Ho Hudson | Liquid penetrant |
DCL-84-088, Responds to NRC Re Violations Noted in IE Insp Rept 50-275/83-40.Corrective actions:831227 Interofc Memo Issued to All Engineering Disciplines Covering Procedures to Revise Existing Files & Prepare New Files | 1 March 1984 | Responds to NRC Re Violations Noted in IE Insp Rept 50-275/83-40.Corrective actions:831227 Interofc Memo Issued to All Engineering Disciplines Covering Procedures to Revise Existing Files & Prepare New Files | |
DCL-84-091, Responds to NRC Re Violations Noted in IE Insp Rept 50-275/83-39.Corrective Actions:Area Permits for Welding Posted to Identify Generic Requirements on Area Basis & Util Inspector Assigned to Assist Fire Marshall | 5 March 1984 | Responds to NRC Re Violations Noted in IE Insp Rept 50-275/83-39.Corrective Actions:Area Permits for Welding Posted to Identify Generic Requirements on Area Basis & Util Inspector Assigned to Assist Fire Marshall | Fire Protection Program Fire Watch |
DCL-84-092, Forwards Response to Request for Addl Info Re Class IE Electrical Raceway Supports.Design Supports Have Sufficient Margin to Assure That Loss of Single Support Will Not Cause Loss of Safety Function | 7 March 1984 | Forwards Response to Request for Addl Info Re Class IE Electrical Raceway Supports.Design Supports Have Sufficient Margin to Assure That Loss of Single Support Will Not Cause Loss of Safety Function | |
DCL-84-093, Forwards Description of Program Implemented to Verify Clearance Between Piping & Penetrations,In Response to IE Bulletin 79-14 | 6 March 1984 | Forwards Description of Program Implemented to Verify Clearance Between Piping & Penetrations,In Response to IE Bulletin 79-14 | |
DCL-84-103, Forwards Safeguards Info Re Changes to Rev 11 to Security Plan.Info Withheld (Ref 10CFR73.21) | 19 March 1984 | Forwards Safeguards Info Re Changes to Rev 11 to Security Plan.Info Withheld (Ref 10CFR73.21) | |
DCL-84-110, Forwards Nekton,Inc Paper, Post-Miocene Compressional Tectonics Along Central State of CA Margin. Conclusion of Paper Will Reviewed | 22 March 1984 | Forwards Nekton,Inc Paper, Post-Miocene Compressional Tectonics Along Central State of CA Margin. Conclusion of Paper Will Reviewed | Earthquake |
DCL-84-124, Forwards Response to 840229 Notice of Severity Level IV Violation Noted in IE Insp Repts 50-275/83-37 & 50-323/83-25.Weldments Examined for Acceptability by Qualified Inspectors & Necessary Repairs Will Be Made | 29 March 1984 | Forwards Response to 840229 Notice of Severity Level IV Violation Noted in IE Insp Repts 50-275/83-37 & 50-323/83-25.Weldments Examined for Acceptability by Qualified Inspectors & Necessary Repairs Will Be Made | |
DCL-84-129, Responds to IE Bulletin 83-08, Electrical Circuit Breakers W/Undervoltage Trip Feature in Use in Safety-Related Applications Other than Reactor Trip Sys. Subj Circuit Breakers Not Used at Facilities | 4 April 1984 | Responds to IE Bulletin 83-08, Electrical Circuit Breakers W/Undervoltage Trip Feature in Use in Safety-Related Applications Other than Reactor Trip Sys. Subj Circuit Breakers Not Used at Facilities | |
DCL-84-130, Responds to NRC Re Violations Noted in IE Insp Rept 50-275/83-41.Corrective Actions:Plant Staff Review Committee Approved Bypass Consisting of Jumper on Pressurizer Pressure Instrument on 831219 | 4 April 1984 | Responds to NRC Re Violations Noted in IE Insp Rept 50-275/83-41.Corrective Actions:Plant Staff Review Committee Approved Bypass Consisting of Jumper on Pressurizer Pressure Instrument on 831219 | Fire Protection Program Fire Watch |
DCL-84-136, Forwards Corrections to Responding to Issues Discussed in 840328 & 0402 Meetings W/Nrc Re Board Notification 84-071.Related Correspondence | 5 April 1984 | Forwards Corrections to Responding to Issues Discussed in 840328 & 0402 Meetings W/Nrc Re Board Notification 84-071.Related Correspondence | |
DCL-84-140, Responds to NRC Re Violations Noted in IE Insp Repts 50-275/83-37 & 50-323/83-25.Corrective actions:20% or More of Accessible Welds Reinspected Prior to Compliance w/ESD-237 Procedure | 11 April 1984 | Responds to NRC Re Violations Noted in IE Insp Repts 50-275/83-37 & 50-323/83-25.Corrective actions:20% or More of Accessible Welds Reinspected Prior to Compliance w/ESD-237 Procedure | |
DCL-84-144, Requests That NRC Ack Receipt of Submitting Status Rept on Actions Required for Operational Readiness. All Actions Re Containment Integrity Prior to Plant Heatup Complete.W/O Encl.Related Correspondence | 12 April 1984 | Requests That NRC Ack Receipt of Submitting Status Rept on Actions Required for Operational Readiness. All Actions Re Containment Integrity Prior to Plant Heatup Complete.W/O Encl.Related Correspondence | |
DCL-84-149, Forwards Rev 11 to Security Plan.Rev Withheld (Ref 10CFR73.21) | 19 April 1984 | Forwards Rev 11 to Security Plan.Rev Withheld (Ref 10CFR73.21) | |
DCL-84-151, Submits Updated Response to IE Bulletin 83-08, Electrical Circuit Breakers W/Undervoltage Trip Feature in Use in Safety-Related Application.... No Subj Breakers in Use. Revised Emergency Implementing Procedures Encl | 24 April 1984 | Submits Updated Response to IE Bulletin 83-08, Electrical Circuit Breakers W/Undervoltage Trip Feature in Use in Safety-Related Application.... No Subj Breakers in Use. Revised Emergency Implementing Procedures Encl | |
DCL-84-161, Advises That Util Revised Pipe Support Design to Require Base Plates to Be Welded to Fan Cooler Structure in Lieu of Using A-325 Bolted Connection.Design Issued & Mods Ready for NRC Insp.Related FOIA Documents Encl | 27 April 1984 | Advises That Util Revised Pipe Support Design to Require Base Plates to Be Welded to Fan Cooler Structure in Lieu of Using A-325 Bolted Connection.Design Issued & Mods Ready for NRC Insp.Related FOIA Documents Encl | Hydrostatic Liquid penetrant |
DCL-84-176, Responds to IE Bulletin 84-02, Failures of GE Type Hfa Relays in Class IE Safety Sys. Nylon or Lexan-type GE Hfa Relays Not Used in safety-related Sys | 8 May 1984 | Responds to IE Bulletin 84-02, Failures of GE Type Hfa Relays in Class IE Safety Sys. Nylon or Lexan-type GE Hfa Relays Not Used in safety-related Sys | |
DCL-84-186, Forwards Responses to 31 Allegations Identified in Sser 22, Per 840419 Request.Receipt Ack Requested | 17 May 1984 | Forwards Responses to 31 Allegations Identified in Sser 22, Per 840419 Request.Receipt Ack Requested | Hydrostatic Nondestructive Examination Condition Adverse to Quality Earthquake Liquid penetrant |
DCL-84-195, Forwards Response to 146 Allegations in . Safeguards Info Withheld (Ref 10CFR73.21) | 29 May 1984 | Forwards Response to 146 Allegations in . Safeguards Info Withheld (Ref 10CFR73.21) | Liquid penetrant |
DCL-84-199, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including EP OP-20 Re Excessive RCS Leakage & Er R-1 Re Personnel Injury or Illness &/Or Overexposure | 1 June 1984 | Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including EP OP-20 Re Excessive RCS Leakage & Er R-1 Re Personnel Injury or Illness &/Or Overexposure | |
DCL-84-209, Requests Commission Grant Util Authority to Operate Above 5% Power by 840619 Based on Successful Completion of Fuel Load & Low Power Testing Up to 5% Power | 8 June 1984 | Requests Commission Grant Util Authority to Operate Above 5% Power by 840619 Based on Successful Completion of Fuel Load & Low Power Testing Up to 5% Power | |
DCL-84-221, Forwards Description of Contractor Record Turnover Program & Results.Partially Withheld Related Documents Encl | 11 June 1984 | Forwards Description of Contractor Record Turnover Program & Results.Partially Withheld Related Documents Encl | Safe Shutdown Earthquake Reverse polarity |
DCL-84-224, Forwards Addl Info Re Pipe Support Design Guides Per NRC Request as Result of Recent Audits Connected W/License Condition 2.C.(11) | 11 June 1984 | Forwards Addl Info Re Pipe Support Design Guides Per NRC Request as Result of Recent Audits Connected W/License Condition 2.C.(11) | |
DCL-84-228, Responds to NRC Re Violations & Proposed Imposition of Civil Penalty Noted in IE Insp Rept 50-275/84-42.Corrective Actions:Administrative Procedure E-4 Revised on 840611 to Require Technical Review.Fee Encl | 15 June 1984 | Responds to NRC Re Violations & Proposed Imposition of Civil Penalty Noted in IE Insp Rept 50-275/84-42.Corrective Actions:Administrative Procedure E-4 Revised on 840611 to Require Technical Review.Fee Encl | Boric Acid |
DCL-84-231, Responds to NRC Re Violations Noted in IE Insp Repts 50-275/83-37 & 50-323/83-25.Corrective Actions:Reinsp Program Implemented for Welds Originally Accepted by Unqualified Inspectors | 18 June 1984 | Responds to NRC Re Violations Noted in IE Insp Repts 50-275/83-37 & 50-323/83-25.Corrective Actions:Reinsp Program Implemented for Welds Originally Accepted by Unqualified Inspectors | |
DCL-84-243, Forwards Response to Govt Accountability Project Allegations Contained in 840323,0412,0503 & 31 Ltrs.All Responses Verified & Prof Resumes of Verifiers Either Previously Submitted or Encl | 29 June 1984 | Forwards Response to Govt Accountability Project Allegations Contained in 840323,0412,0503 & 31 Ltrs.All Responses Verified & Prof Resumes of Verifiers Either Previously Submitted or Encl | Non-Destructive Examination Nondestructive Examination Earthquake Liquid penetrant Scaffolding |
DCL-84-248, Notifies of Completion of Fixes for safety-related Masonry Walls,Per IE Bulletin 80-11.Existing as-built Condition Would Not Preclude Addl Mod.No Addl Fixes Necessary Based on Analysis for Line Break & Jet Impingement | 2 July 1984 | Notifies of Completion of Fixes for safety-related Masonry Walls,Per IE Bulletin 80-11.Existing as-built Condition Would Not Preclude Addl Mod.No Addl Fixes Necessary Based on Analysis for Line Break & Jet Impingement | |
DCL-84-262, Requests Exam & Test Requirements for All Presently Licensed Personnel for Unit 1 Be Waived for Unit 2 & Combined OLs for Units 1 & 2 Be Issued.Supporting Documentation Encl.Related Correspondence | 17 July 1984 | Requests Exam & Test Requirements for All Presently Licensed Personnel for Unit 1 Be Waived for Unit 2 & Combined OLs for Units 1 & 2 Be Issued.Supporting Documentation Encl.Related Correspondence | |
DCL-84-277, Responds to NRC Re Violations Noted in IE Insp Rept 50-275/84-10.Corrective Actions:Procedure C-4S1, Mechanical Bypass,Jumper & Lifted Circuit Log, Revised to Include Jumpers in Clearance Package | 30 July 1984 | Responds to NRC Re Violations Noted in IE Insp Rept 50-275/84-10.Corrective Actions:Procedure C-4S1, Mechanical Bypass,Jumper & Lifted Circuit Log, Revised to Include Jumpers in Clearance Package | Hydrostatic Backfit |
DCL-84-294, Forwards Changes to Rev 11 to Security Plan,Rev 2 to Safeguards Contingency Plan & Rev 2 to Training & Qualification Plan.Revs Withheld (Ref 10CFR73.21) | 29 August 1984 | Forwards Changes to Rev 11 to Security Plan,Rev 2 to Safeguards Contingency Plan & Rev 2 to Training & Qualification Plan.Revs Withheld (Ref 10CFR73.21) | |
DCL-84-297, Forwards Replacement Page to Rev 11 to Security Plan.Page Withheld (Ref 10CFR73.21) | 30 August 1984 | Forwards Replacement Page to Rev 11 to Security Plan.Page Withheld (Ref 10CFR73.21) | |
DCL-84-321, Responds to NRC Re Violations Noted in Insp Rept 50-275/84-21.Corrective Actions:High Voltage to Nuclear Source Instrumentation Restored Approx 1 Minute After Deenergizing | 2 October 1984 | Responds to NRC Re Violations Noted in Insp Rept 50-275/84-21.Corrective Actions:High Voltage to Nuclear Source Instrumentation Restored Approx 1 Minute After Deenergizing | |
DCL-84-322, Responds to NRC Re Violations Noted in Insp Rept 50-275/84-23.Corrective Actions:Employees Assigned to Onsite or Corporate Emergency Organization Will Be Trained or Retrained | 5 October 1984 | Responds to NRC Re Violations Noted in Insp Rept 50-275/84-23.Corrective Actions:Employees Assigned to Onsite or Corporate Emergency Organization Will Be Trained or Retrained | |
DCL-84-328, Forwards 65 Allegations & Previous Responses.Util Will Respond to Remaining Issues by 841030 | 18 October 1984 | Forwards 65 Allegations & Previous Responses.Util Will Respond to Remaining Issues by 841030 | Nondestructive Examination |
DCL-84-343, Forwards Response to Remaining Allegations Identified in NRC 840828 & 1022 Ltrs.Evaluations & Investigations Resolve Allegations.Ack of Receipt of Matl Requested | 30 October 1984 | Forwards Response to Remaining Allegations Identified in NRC 840828 & 1022 Ltrs.Evaluations & Investigations Resolve Allegations.Ack of Receipt of Matl Requested | Non-Destructive Examination Hydrostatic Nondestructive Examination Liquid penetrant Backfit |
DCL-84-349, Responds to NRC Re Violations Noted in Insp Repts 50-275/84-31 & 50-323/84-31.Corrective Actions:Fire Door Frames Corrected to Comply W/Design & Installation Requirements | 13 November 1984 | Responds to NRC Re Violations Noted in Insp Repts 50-275/84-31 & 50-323/84-31.Corrective Actions:Fire Door Frames Corrected to Comply W/Design & Installation Requirements | |