Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
DCL-84-195, Forwards Response to 146 Allegations in . Safeguards Info Withheld (Ref 10CFR73.21)29 May 1984Forwards Response to 146 Allegations in . Safeguards Info Withheld (Ref 10CFR73.21)Liquid penetrant
DCL-84-199, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including EP OP-20 Re Excessive RCS Leakage & Er R-1 Re Personnel Injury or Illness &/Or Overexposure1 June 1984Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including EP OP-20 Re Excessive RCS Leakage & Er R-1 Re Personnel Injury or Illness &/Or Overexposure
DCL-84-209, Requests Commission Grant Util Authority to Operate Above 5% Power by 840619 Based on Successful Completion of Fuel Load & Low Power Testing Up to 5% Power8 June 1984Requests Commission Grant Util Authority to Operate Above 5% Power by 840619 Based on Successful Completion of Fuel Load & Low Power Testing Up to 5% Power
DCL-84-221, Forwards Description of Contractor Record Turnover Program & Results.Partially Withheld Related Documents Encl11 June 1984Forwards Description of Contractor Record Turnover Program & Results.Partially Withheld Related Documents EnclSafe Shutdown
Earthquake
Reverse polarity
DCL-84-224, Forwards Addl Info Re Pipe Support Design Guides Per NRC Request as Result of Recent Audits Connected W/License Condition 2.C.(11)11 June 1984Forwards Addl Info Re Pipe Support Design Guides Per NRC Request as Result of Recent Audits Connected W/License Condition 2.C.(11)
DCL-84-228, Responds to NRC Re Violations & Proposed Imposition of Civil Penalty Noted in IE Insp Rept 50-275/84-42.Corrective Actions:Administrative Procedure E-4 Revised on 840611 to Require Technical Review.Fee Encl15 June 1984Responds to NRC Re Violations & Proposed Imposition of Civil Penalty Noted in IE Insp Rept 50-275/84-42.Corrective Actions:Administrative Procedure E-4 Revised on 840611 to Require Technical Review.Fee EnclBoric Acid
DCL-84-231, Responds to NRC Re Violations Noted in IE Insp Repts 50-275/83-37 & 50-323/83-25.Corrective Actions:Reinsp Program Implemented for Welds Originally Accepted by Unqualified Inspectors18 June 1984Responds to NRC Re Violations Noted in IE Insp Repts 50-275/83-37 & 50-323/83-25.Corrective Actions:Reinsp Program Implemented for Welds Originally Accepted by Unqualified Inspectors
DCL-84-243, Forwards Response to Govt Accountability Project Allegations Contained in 840323,0412,0503 & 31 Ltrs.All Responses Verified & Prof Resumes of Verifiers Either Previously Submitted or Encl29 June 1984Forwards Response to Govt Accountability Project Allegations Contained in 840323,0412,0503 & 31 Ltrs.All Responses Verified & Prof Resumes of Verifiers Either Previously Submitted or EnclNon-Destructive Examination
Nondestructive Examination
Earthquake
Liquid penetrant
Scaffolding
DCL-84-248, Notifies of Completion of Fixes for safety-related Masonry Walls,Per IE Bulletin 80-11.Existing as-built Condition Would Not Preclude Addl Mod.No Addl Fixes Necessary Based on Analysis for Line Break & Jet Impingement2 July 1984Notifies of Completion of Fixes for safety-related Masonry Walls,Per IE Bulletin 80-11.Existing as-built Condition Would Not Preclude Addl Mod.No Addl Fixes Necessary Based on Analysis for Line Break & Jet Impingement
DCL-84-262, Requests Exam & Test Requirements for All Presently Licensed Personnel for Unit 1 Be Waived for Unit 2 & Combined OLs for Units 1 & 2 Be Issued.Supporting Documentation Encl.Related Correspondence17 July 1984Requests Exam & Test Requirements for All Presently Licensed Personnel for Unit 1 Be Waived for Unit 2 & Combined OLs for Units 1 & 2 Be Issued.Supporting Documentation Encl.Related Correspondence
DCL-84-277, Responds to NRC Re Violations Noted in IE Insp Rept 50-275/84-10.Corrective Actions:Procedure C-4S1, Mechanical Bypass,Jumper & Lifted Circuit Log, Revised to Include Jumpers in Clearance Package30 July 1984Responds to NRC Re Violations Noted in IE Insp Rept 50-275/84-10.Corrective Actions:Procedure C-4S1, Mechanical Bypass,Jumper & Lifted Circuit Log, Revised to Include Jumpers in Clearance PackageHydrostatic
Backfit
DCL-84-294, Forwards Changes to Rev 11 to Security Plan,Rev 2 to Safeguards Contingency Plan & Rev 2 to Training & Qualification Plan.Revs Withheld (Ref 10CFR73.21)29 August 1984Forwards Changes to Rev 11 to Security Plan,Rev 2 to Safeguards Contingency Plan & Rev 2 to Training & Qualification Plan.Revs Withheld (Ref 10CFR73.21)
DCL-84-297, Forwards Replacement Page to Rev 11 to Security Plan.Page Withheld (Ref 10CFR73.21)30 August 1984Forwards Replacement Page to Rev 11 to Security Plan.Page Withheld (Ref 10CFR73.21)
DCL-84-321, Responds to NRC Re Violations Noted in Insp Rept 50-275/84-21.Corrective Actions:High Voltage to Nuclear Source Instrumentation Restored Approx 1 Minute After Deenergizing2 October 1984Responds to NRC Re Violations Noted in Insp Rept 50-275/84-21.Corrective Actions:High Voltage to Nuclear Source Instrumentation Restored Approx 1 Minute After Deenergizing
DCL-84-322, Responds to NRC Re Violations Noted in Insp Rept 50-275/84-23.Corrective Actions:Employees Assigned to Onsite or Corporate Emergency Organization Will Be Trained or Retrained5 October 1984Responds to NRC Re Violations Noted in Insp Rept 50-275/84-23.Corrective Actions:Employees Assigned to Onsite or Corporate Emergency Organization Will Be Trained or Retrained
DCL-84-328, Forwards 65 Allegations & Previous Responses.Util Will Respond to Remaining Issues by 84103018 October 1984Forwards 65 Allegations & Previous Responses.Util Will Respond to Remaining Issues by 841030Nondestructive Examination
DCL-84-343, Forwards Response to Remaining Allegations Identified in NRC 840828 & 1022 Ltrs.Evaluations & Investigations Resolve Allegations.Ack of Receipt of Matl Requested30 October 1984Forwards Response to Remaining Allegations Identified in NRC 840828 & 1022 Ltrs.Evaluations & Investigations Resolve Allegations.Ack of Receipt of Matl RequestedNon-Destructive Examination
Hydrostatic
Nondestructive Examination
Liquid penetrant
Backfit
DCL-84-349, Responds to NRC Re Violations Noted in Insp Repts 50-275/84-31 & 50-323/84-31.Corrective Actions:Fire Door Frames Corrected to Comply W/Design & Installation Requirements13 November 1984Responds to NRC Re Violations Noted in Insp Repts 50-275/84-31 & 50-323/84-31.Corrective Actions:Fire Door Frames Corrected to Comply W/Design & Installation Requirements
DCL-84-364, Advises That Util Response to Item 4.5.3 of Generic Ltr 83-28, Reactor Trip Sys Functional Testing Interval, Contained Entirely in Westinghouse WCAP-10271 Re Reactor Protection Instrumentation Sys,Currently Under NRC Review30 November 1984Advises That Util Response to Item 4.5.3 of Generic Ltr 83-28, Reactor Trip Sys Functional Testing Interval, Contained Entirely in Westinghouse WCAP-10271 Re Reactor Protection Instrumentation Sys,Currently Under NRC Review
DCL-84-366, Informs That Potentially Reportable Condition Re Chloride Contamination of Rcs,Initially Reported on 841024 Does Not Meet Reportability Criteria of 10CFR50.55(e).No RCS Damage Sustained30 November 1984Informs That Potentially Reportable Condition Re Chloride Contamination of Rcs,Initially Reported on 841024 Does Not Meet Reportability Criteria of 10CFR50.55(e).No RCS Damage Sustained
DCL-84-367, Responds to IE Bulletin 84-03 Re Potential for & Consequences of Refueling Cavity Water Seal Failure.Plant Seal Assembly Limits Large Leak Via metal-to-metal Contact. Gross Failures of Cavity Water Seal Unlikely30 November 1984Responds to IE Bulletin 84-03 Re Potential for & Consequences of Refueling Cavity Water Seal Failure.Plant Seal Assembly Limits Large Leak Via metal-to-metal Contact. Gross Failures of Cavity Water Seal Unlikely
DCL-84-385, Forwards Updated Unit 1 Plant Drawings & Aperture Cards. W/O Drawings & Aperture Cards.Related Correspondence21 December 1984Forwards Updated Unit 1 Plant Drawings & Aperture Cards. W/O Drawings & Aperture Cards.Related Correspondence
DCL-85-020, Requests Issuance of Dual Operating Licenses to All Unit 1 Licensed Personnel Upon Successful Completion of Unit Differences Exam & Recognition as multi-unit Licensed Plant.Related Correspondence21 January 1985Requests Issuance of Dual Operating Licenses to All Unit 1 Licensed Personnel Upon Successful Completion of Unit Differences Exam & Recognition as multi-unit Licensed Plant.Related Correspondence
DCL-85-050, Provides Final Responses to IE Bulletins 79-02, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts & 79-14, Seismic Analysis for As-Built Safety- Related Piping Sys4 February 1985Provides Final Responses to IE Bulletins 79-02, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts & 79-14, Seismic Analysis for As-Built Safety- Related Piping Sys
DCL-85-051, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 1 to EP OP-0.1, Reactor Trip Response & Rev 5 to EP G-3, Notification of Offsite Organizations4 February 1985Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 1 to EP OP-0.1, Reactor Trip Response & Rev 5 to EP G-3, Notification of Offsite Organizations
DCL-85-071, Forwards Addl Info Re Internal Review Program,Per NRC Request.Summary of Resolution Categories of Items Reviewed by Internal Review Program Encl.Related Correspondence21 February 1985Forwards Addl Info Re Internal Review Program,Per NRC Request.Summary of Resolution Categories of Items Reviewed by Internal Review Program Encl.Related Correspondence
DCL-85-095, Forwards Diablo Canyon Newsletter, Feb 1985,supplied to Facilitate Awareness of Util Public Educ Program Re Emergency Response Plan.Newsletter Will Be Sent as Part of Routine Distribution Sys6 March 1985Forwards Diablo Canyon Newsletter, Feb 1985,supplied to Facilitate Awareness of Util Public Educ Program Re Emergency Response Plan.Newsletter Will Be Sent as Part of Routine Distribution SysEarthquake
DCL-85-107, Forwards Schedule for Conducting Operator Exams for Remainder of Fy Through 880930,per Generic Ltr 85-04.Related Correspondence13 March 1985Forwards Schedule for Conducting Operator Exams for Remainder of Fy Through 880930,per Generic Ltr 85-04.Related Correspondence
DCL-85-126, Forwards Public Version of Revised Emergency Response Plan Sops,Including III.10, SOP Dept of General Svcs & III.24, Disaster Preparedness Plan for Peacetime Emergencies. Related Correspondence26 March 1985Forwards Public Version of Revised Emergency Response Plan Sops,Including III.10, SOP Dept of General Svcs & III.24, Disaster Preparedness Plan for Peacetime Emergencies. Related Correspondence
DCL-85-130, Forwards Request to Change NPDES Permit,Revising Discharge Point of Nonradiological Portion of Chemical Lab Wastes from Liquid Radwaste Treatment Sys Effluent to Turbine Bldg Sump27 March 1985Forwards Request to Change NPDES Permit,Revising Discharge Point of Nonradiological Portion of Chemical Lab Wastes from Liquid Radwaste Treatment Sys Effluent to Turbine Bldg Sump
DCL-85-135, Discusses Util Indicating That LER Would Be Forwarded Re Late Submittal of Info on 1984 Personnel Exposure.Detailed Review of NUREG-1022,Suppl 1,Section II, Item 2.9 Indicates LER Submittal Not Required29 March 1985Discusses Util Indicating That LER Would Be Forwarded Re Late Submittal of Info on 1984 Personnel Exposure.Detailed Review of NUREG-1022,Suppl 1,Section II, Item 2.9 Indicates LER Submittal Not Required
DCL-85-141, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Table of Contents & Rev 0 to EP E-0, Reactor Trip or Safety Injection. Privacy/ Proprietary Info Identified in Encl.Related Correspondence8 April 1985Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Table of Contents & Rev 0 to EP E-0, Reactor Trip or Safety Injection. Privacy/ Proprietary Info Identified in Encl.Related Correspondence
DCL-85-146, Forwards Rev 12 to Security Plan.Changes Provide Clarification Requested by NRC During Unit 2 850304-09 Preoperational Insp.Rev Withheld (Ref 10CFR73.21)10 April 1985Forwards Rev 12 to Security Plan.Changes Provide Clarification Requested by NRC During Unit 2 850304-09 Preoperational Insp.Rev Withheld (Ref 10CFR73.21)
DCL-85-152, Forwards Responses to Allegations Re Cardinal Industrial Products,Contained in Affidavits Attached as Exhibits 4 & 10 to Gap 850314 Petition.Responses to Other Petition Allegations Will Be Forwarded Later17 April 1985Forwards Responses to Allegations Re Cardinal Industrial Products,Contained in Affidavits Attached as Exhibits 4 & 10 to Gap 850314 Petition.Responses to Other Petition Allegations Will Be Forwarded LaterNondestructive Examination
Condition Adverse to Quality
DCL-85-162, Forwards Rev 1 to seismically-induced Sys Interaction Program Final Rept Documenting Unit 2 Results.Unit 2 Interaction Data Sheets Will Be Submitted within 90 Days.W/O Encl.Related Correspondence22 April 1985Forwards Rev 1 to seismically-induced Sys Interaction Program Final Rept Documenting Unit 2 Results.Unit 2 Interaction Data Sheets Will Be Submitted within 90 Days.W/O Encl.Related Correspondence
DCL-85-195, Responds to Rev 1 to IE Bulletin 81-01 Re Insps of safety-related Snubbers.Insps Completed on 850426,per Temporary Procedure TD-8402, Visual Insp of Mechanical Snubbers, Included Stroking of All safety-related Snubbers28 May 1985Responds to Rev 1 to IE Bulletin 81-01 Re Insps of safety-related Snubbers.Insps Completed on 850426,per Temporary Procedure TD-8402, Visual Insp of Mechanical Snubbers, Included Stroking of All safety-related Snubbers
DCL-85-211, Forwards Personal Qualification Statement for Renewal of Reactor Operator License for CE Newman,Per 10CFR55.10 & 55.33.Related Correspondence12 June 1985Forwards Personal Qualification Statement for Renewal of Reactor Operator License for CE Newman,Per 10CFR55.10 & 55.33.Related Correspondence
DCL-85-222, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP G-2 Re Onsite Emergency Organization & EP G-251 Re Notification of Onsite Emergency organization.W/850708 Release Memo21 June 1985Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 7 to EP G-2 Re Onsite Emergency Organization & EP G-251 Re Notification of Onsite Emergency organization.W/850708 Release Memo
DCL-85-223, Informs That Tw Bishop 840419 Original Ltr & Attachments to Jd Schuyler Re Allegations Returned Under Separate Cover, Per Request.Return of Document Following Review Requested. Related Correspondence21 June 1985Informs That Tw Bishop 840419 Original Ltr & Attachments to Jd Schuyler Re Allegations Returned Under Separate Cover, Per Request.Return of Document Following Review Requested. Related Correspondence
DCL-85-249, Forwards Description of Util Comprehensive Drug & Alcohol Prevention Program & Component Parts.Program Includes Policy & Procedures Re Drug & Alcohol Prevention Concerning Nuclear Facilities.Related Correspondence25 July 1985Forwards Description of Util Comprehensive Drug & Alcohol Prevention Program & Component Parts.Program Includes Policy & Procedures Re Drug & Alcohol Prevention Concerning Nuclear Facilities.Related CorrespondenceFitness for Duty
DCL-85-270, Forwards Rev 2 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)16 August 1985Forwards Rev 2 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)
DCL-85-271, Forwards Rev 13 to Security Plan,In Response to NRC 850719 Comments.Rev Withheld (Ref 10CFR73.21)16 August 1985Forwards Rev 13 to Security Plan,In Response to NRC 850719 Comments.Rev Withheld (Ref 10CFR73.21)
DCL-85-275, Provides Supplemental Response to IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Full Load Test of 24 H Duration Performed on Generators 2-1 & 2-221 August 1985Provides Supplemental Response to IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Full Load Test of 24 H Duration Performed on Generators 2-1 & 2-2
DCL-85-280, Forwards Semiannual Radioactive Effluent Release Rept,Jan- June 1985. Rept Describes Quantities of Radioactive Gaseous & Liquid Effluents Released & Solid Radwaste Shipments29 August 1985Forwards Semiannual Radioactive Effluent Release Rept,Jan- June 1985. Rept Describes Quantities of Radioactive Gaseous & Liquid Effluents Released & Solid Radwaste Shipments
DCL-85-328, Forwards Diablo Canyon Power Plant Semiannual Radioactive Effluent Release Rept,Supplemental Info Jan-June 1985 in Response to NRC 850930 Request for Dose Assessment Info24 October 1985Forwards Diablo Canyon Power Plant Semiannual Radioactive Effluent Release Rept,Supplemental Info Jan-June 1985 in Response to NRC 850930 Request for Dose Assessment Info
DCL-85-336, Lists New Address for Util Washington,Dc Ofc.Telephone Number Remains Unchanged31 October 1985Lists New Address for Util Washington,Dc Ofc.Telephone Number Remains Unchanged
DCL-85-344, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 3 to EP G-251 Re Notification of Onsite Emergency organization.W/851206 Release Memo15 November 1985Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 3 to EP G-251 Re Notification of Onsite Emergency organization.W/851206 Release Memo
DCL-85-345, Forwards Public Version of San Luis Obispo County Emergency Response Plan Sops,Including III.01, Emergency Svcs Director, III.08, Public Info Officer & III.20, California Highway Patrol.... W/851206 Release Memo18 November 1985Forwards Public Version of San Luis Obispo County Emergency Response Plan Sops,Including III.01, Emergency Svcs Director, III.08, Public Info Officer & III.20, California Highway Patrol.... W/851206 Release Memo
DCL-85-357, Submits Organizational Changes & Appointments Re Nuclear Related Activities within Facilities & Electric Resources Development Dept.Purpose of Reorganization Is to Consolidate Under Vice President Resources to Support Operations3 December 1985Submits Organizational Changes & Appointments Re Nuclear Related Activities within Facilities & Electric Resources Development Dept.Purpose of Reorganization Is to Consolidate Under Vice President Resources to Support Operations
DCL-85-365, Forwards Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 10 to EP R-6, Radiological Fire & Rev 4 to EP M-9, Hazardous Waste Mgt Contingency Plan13 December 1985Forwards Public Version of Updated Emergency Plan Implementing Procedures,Including Rev 10 to EP R-6, Radiological Fire & Rev 4 to EP M-9, Hazardous Waste Mgt Contingency Plan