Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
05000387/FIN-2008004-02 | HPCI and RCIC Made Inoperable Due to Operator Actions During Shutdown | |
05000387/FIN-2010004-04 | Failure to Accurately Model the Simulator for RPV Level Control Using the Integrated Control System | |
05000387/FIN-2013003-04 | Implementation of Enforcement Guidance Memorandum (EGM) 11-003, Revision 1 | |
05000387/LER-1983-013, Forwards LER 83-013/03L-0 | 11 February 1983 | Forwards LER 83-013/03L-0 |
05000387/LER-1983-092, Forwards Transient Analysis & Damage Repts for Startup Transformer T-10 Failure on 830624 (Ref LER 83-092/03L-0), Fulfilling Util 830630 Commitment | 2 November 1983 | Forwards Transient Analysis & Damage Repts for Startup Transformer T-10 Failure on 830624 (Ref LER 83-092/03L-0), Fulfilling Util 830630 Commitment |
05000387/LER-2015-006 | 30 March 2016 | Loss of Safety Function due to Inoperability of Both Trains of the Standby Gas Treatment System and a Loss of Safety Function of the Control Room Emergency Outside Air Supply System due to Air Flow Controller found in Manual LER 15-006-01 for Susquehanna, Unit 1, Regarding Loss of Safety Function due to Inoperability of Both Trains of the Standby Gas Treatment System and a Loss of Safety Function of the Control Room Emergency Outside Air Supply System due to Air Flow... |
05000388/FIN-2014008-01 | Inadequately Maintained Procedures for Plant Shutdown to Hot Standby led to Reactor Water Level and Power Transients | |
05000388/LER-2012-002 | Unit 2 Manual Scram Due to Loss of the Integrated Control System | |
ENS 45866 | Reactor Scram on Low Reactor Vessel Water Level During Feedwater Integrated Control System Testing | |
IR 05000387/1982020 | 14 July 1982 | IE Insp Rept 50-387/82-20 on 820614-18.No Noncompliance Noted.Major Areas Inspected:Emergency,Abnormal Alarm Response & Instrument Surveillance Procedures |
IR 05000387/1986002 | 27 March 1986 | Insp Repts 50-387/86-02 & 50-388/86-01 on 860203-0314. Violation Noted:Rhr Pump Operated W/O Cooling Water Due to Valve Misalignment & Installation of Expired Squib Valve in Standby Liquid Control Sys |
IR 05000387/1987005 | 7 May 1987 | Exam Repts 50-387/87-05OL & 50-388/87-05OL on 870316-19. Exam Results:Three Out of Five Senior Reactor Operators & Two Out of Four Reactor Operators Issued Licenses.Exam & Answer Key Encl |
IR 05000387/1997001 | 14 March 1997 | Insp Repts 50-387/97-01 & 50-388/97-01 on 970114-0224. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support |
IR 05000387/2001012 | 28 February 2002 | IR 05000387/2001-012, IR 05000388/2001-012, on 12/01-02/09-2002; PPL Susquehanna, LLC; Susquehanna Steam Electric Station, Units 1 & 2. Permanent Plant Modifications. Non-cited Violation Noted |
IR 05000387/2003004 | 7 November 2003 | IR 05000387-03-004, 05000388-03-004; 06/29/2003 - 09/27/2003; Susquehanna Steam Electric Station, Units 1 and 2. Personnel Performance During Non-Routine Plant Evolutions and Identification and Resolution of Problems |
IR 05000387/2004002 | 29 April 2004 | IR 05000387-04-002 & 05000388-04-002, on 01/01/2004 - 03/31/2004, Susquehanna Steam Electric Station, Units 1 and 2; Personnel Performance During Non-Routine Plant Evolutions |
IR 05000387/2006003 | 28 July 2006 | IR 05000387-06-003, 05000388-06-003 on 04/01/2006 - 06/30/2006 for Susquehanna Steam Electric Station, Units 1 and 2; Operability Evaluations, Permanent Plant Modifications, Outage Activities, Identification & Resolution of Problems |
IR 05000387/2008004 | 13 November 2008 | IR 05000387-08-004, 05000388-08-004; on 07/01/2008 - 09/30/2008; Susquehanna Steam Electric Station, Units 1 and 2; Operability Evaluations and Adverse Weather Protection |
IR 05000387/2008006 | 17 March 2008 | IR 05000387-08-006, 05000388-08-006, on 01/14/2008 - 02/01/2008, Susquehanna Steam Electric Station; Biennial Baseline Inspection of He Identification and Resolution of Problems; Corrective Action Program, Simulator Fidelity, and Procedure |
IR 05000387/2010004 | 12 November 2010 | IR 05000387-10-004, 05000388-10-004, on 07/01/2010 - 09/30/2010, Susquehanna Steam Electric Station - NRC Integrated Inspection Report and Preliminary White Finding (EA-10-207) Dated 11/12/2010 |
IR 05000387/2010005 | 9 February 2011 | IR 05000387-10-005 and 05000388-10-005; on 10-01-10 - 12-31-10; Susquehanna Steam Electric Station - NRC Integrated Inspection Report |
IR 05000387/2011004 | 8 November 2011 | IR 05000387-11-004, 05000388-11-004; on 07-01-11 - 9-30-11; Susquehanna Steam Electric Station - NRC Integrated Inspection Report and Notice of Violation |
IR 05000387/2011005 | 14 February 2012 | IR 05000387-11-005, 05000388-11-005; Susquehanna Steam Electric Station - NRC Integrated Inspection Report |
IR 05000387/2012008 | 7 May 2012 | IR 05000387-12-008, on 02/13/2012 - 03/02/2012, Susquehanna Steam Electric Station, Unit 1, Supplemental Inspection - Inspection Procedure (IP) 95002. Follow-up of Events and Notices of Enforcement Discretion |
IR 05000387/2013003 | 14 August 2013 | IR 05000387-13-003 & 05000388-13-003, 04/01/2013; 06/30/2013; Susquehanna Steam Electric Station, Units 1 and 2; Operability Determinations and Functionality Assessments, Surveillance Testing |
IR 05000387/2013011 | 18 November 2013 | IR 05000388-13-011; 09/16/2013 - 09/19/2013; Susquehanna Steam Electric Station (SSES), Unit 2; Supplemental Inspection - Inspection Procedure (IP) 95001; Follow-up of Events and Notices of Enforcement Discretion |
IR 05000387/2014003 | 13 August 2014 | NRC Integrated Inspection Report 05000387-14-003 and 05000388-14-003 and Exercise of Enforcement Discretion (April 1, 2014 - June 30, 2014) |
IR 05000387/2014008 | 12 September 2014 | IR 05000388/2014008; 07/14/2014 - 07/31/2014; Susquehanna Steam Electric Station, Unit 2; Supplemental Inspection - Inspection Procedure (IP) 95002 and Follow-Up Assessment Letter |
IR 05000387/2015003 | 5 November 2015 | IR 05000387/2015003 and 05000388/2015003, Integrated Inspection Report and Notice of Enforcement Discretion - Susquehanna Steam Electric Station |
IR 05000387/2016002 | 11 August 2016 | Integrated Inspection Report 05000387/2016002 and 05000388/2016002 |
IR 05000387/2016004 | 10 February 2017 | |
IR 05000387/2016007 | 23 November 2016 | |
IR 05000387/2017002 | 31 July 2017 | Integrated Inspection Report 05000387/2017002 and 05000388/2017002 and Exercise of Enforcement Discretion |
IR 05000387/2017003 | 7 November 2017 | Integrated Inspection Report 05000387/2017003 and 05000388/2017003 |
IR 05000387/2018002 | 9 August 2018 | Integrated Inspection Report 05000387/2018002 and 05000388/2018002 |
IR 05000387/2018010 | 1 March 2018 | Design Bases Assurance Inspection (Programs) Report 05000387/2018010 and 05000388/2018010 |
IR 05000387/2020001 | 5 May 2020 | Integrated Inspection Report 05000387/2020001 and 05000388/2020001 |
IR 05000387/2022010 | 11 August 2022 | Biennial Problem Identification and Resolution Inspection Report 05000387/2022010 and 05000388/2022010 |
IR 05000388/2013011 | 18 November 2013 | IR 05000388-13-011; 09/16/2013 - 09/19/2013; Susquehanna Steam Electric Station (Sses), Unit 2; Supplemental Inspection - Inspection Procedure (IP) 95001; Follow-up of Events and Notices of Enforcement Discretion |
IR 05000388/2014008 | 12 September 2014 | IR 05000388/2014008; 07/14/2014 - 07/31/2014; Susquehanna Steam Electric Station, Unit 2; Supplemental Inspection - Inspection Procedure (IP) 95002 and Follow-Up Assessment Letter |
Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units | 23 March 1990 | Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units |
Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown | 25 February 1992 | Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown |
Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization | 8 April 1993 | Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization |
Information Notice 1993-62, Thermal Stratification of Water in BWR Reactor Vessels | 10 August 1993 | Thermal Stratification of Water in BWR Reactor Vessels |
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications | 26 November 1993 | Potential Problems with BWR Level Instrumentation Backfill Modifications |
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System | 24 May 1994 | Undetected Accumulation of Gas in Reactor Coolant System |
Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 | 15 July 1994 | Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 |
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | 18 January 1996 | Partial Bypass of Shutdown Cooling Flow from Reactor Vessel |
Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown | 18 June 1996 | Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown |
Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves | 5 August 1996 | Unexpected Opening of Multiple Safety Relief Valves |