IR 05000004/1999044 | 9 November 2011 | IR 05000498-11-004 & 05000499-44-004, on 07/01/2011 - 09/30/2011, South Texas Project Electric Generating Station, Units 1 and 2, Integrated Resident and Regional Report; Operability Evaluations; Identification and Resolution of Problems |
IR 05000498/1987017 | 29 May 1987 | Insp Repts 50-498/87-17 & 50-499/87-17 on 870330-0403.No Violations or Deviations Noted.Major Areas Inspected: Implementation of Fire Protection Program & Compliance W/Requirements of 10CFR50,App R (Safe Shutdown) |
IR 05000498/1987039 | 16 August 1987 | Insp Repts 50-498/87-39 & 50-499/87-39 on 870530-0626. Violations Noted.Major Areas Inspected:Standby Diesel Generator Review,Preoperational Test Results Review,Ie Bulletins & Circulars & Temporary Mod Program Review |
IR 05000498/1988002 | 11 March 1988 | Insp Repts 50-498/88-02 & 50-499/88-02 on 880104-29.No Violations or Deviations Noted.Major Areas Inspected: Allegations,Hvac,Duct Sealant Matl,Nsss Equipment in Unit 1, Electric Cable & Battery Room Mods |
IR 05000498/1993043 | 8 December 1993 | Insp Repts 50-498/93-43 & 50-499/93-43 on 931102-19. Major Areas Inspected:Licensee self-assessment Capability W/ Industry & Followup on Previous Findings |
IR 05000498/1998009 | 12 November 1998 | Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support |
IR 05000498/2002006 | 18 April 2003 | IR 05000498-02-006; IR 05000499-02-006, on 12/29/2002 - 03/22/2003, STP Nuclear Operating Company; South Texas Project Electric Generating Station; Units 1 & 2. Integrated Resident & Regional Rpt; Event Followup, Outage Activities, Pi&R, Mi |
IR 05000498/2003002 | 5 August 2003 | IR 05000498-03-002 and IR 05000499-03-002, on 3/23/02 - 06/21/03; South Texas Units 1 & 2. Integrated Resident & Regional Report; Event Followup, Other Activities, Maintenance, Implementation, Maintenance, Risk, ALARA Planning & Controls |
IR 05000498/2008003 | 12 August 2008 | IR 05000498-08-003, 05000499-08-003 on 04/07/08 - 06/28/08; South Texas Project Electric Generating Station, Units 1 and 2; Integrated Resident and Regional Report; Postmaintenance Test, Refueling Outage Activities, Access Control to Radiol |
IR 05000498/2009002 | 24 April 2009 | IR 05000498-09-002, 05000499-09-002 01/01/2009 - 04/04/2009; South Texas Project Electric Generating Station, Units 1 and 2, Integrated Resident and Regional Report; Maintenance Risk Assessments, Operability Evaluations, and Surveillance Te |
IR 05000498/2012003 | 2 August 2012 | IR 05000498-12-003 & 05000499-12-003, on 03/31/2012 - 06/29/12, South Texas Project Electric Generating Station, Units 1 & 2, Integrated Resident & Regional Report, Operability Evaluations & Functionality Assessments & Followup of Events |
IR 05000498/2015004 | 11 February 2016 | NRC Integrated Inspection Report 05000498/2015004 and 05000499/2015004 |
IR 05000498/2016004 | 8 February 2017 | NRC Integrated Inspection Report 05000498/2016004 and 05000499/2016004 |
IR 05000498/2018003 | 13 December 2018 | Errata - South Texas Project Electric Generating Station, Units 1 and 2 - NRC Integrated Inspection Report 05000498/2018003 and 0500499/2018003 |
IR 05000498/2020001 | 10 June 2020 | Revised Integrated Inspection Report 05000498/2020001 and 05000499/2020001 |
Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units | 23 March 1990 | Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units |
Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown | 25 February 1992 | Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown |
Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization | 8 April 1993 | Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization |
Information Notice 1993-62, Thermal Stratification of Water in BWR Reactor Vessels | 10 August 1993 | Thermal Stratification of Water in BWR Reactor Vessels |
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications | 26 November 1993 | Potential Problems with BWR Level Instrumentation Backfill Modifications |
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System | 24 May 1994 | Undetected Accumulation of Gas in Reactor Coolant System |
Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 | 15 July 1994 | Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 |
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | 18 January 1996 | Partial Bypass of Shutdown Cooling Flow from Reactor Vessel |
Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown | 18 June 1996 | Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown |
Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves | 5 August 1996 | Unexpected Opening of Multiple Safety Relief Valves |
Information Notice 1996-56, Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power | 22 October 1996 | Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power |
Information Notice 1996-65, Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown | 11 December 1996 | Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown |
Information Notice 1997-83, Recent Events Involving Reactor Coolant System Inventory Control During Shutdown | 5 December 1997 | Recent Events Involving Reactor Coolant System Inventory Control During Shutdown |
Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick | 5 May 1999 | Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick |
ML020580493 | 14 February 2002 | Proposed Change to Radiation Monitoring Technical Specification |
ML031150585 | 29 January 1985 | Withdrawn NRC Generic Letter 1985-004: Operator Licensing Examinations |
ML033430591 | 9 September 2003 | 08/2003 Final Operating Exam |
ML043380028 | 30 November 2004 | Tech Spec Pages for Amendments 165 and 155 Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors |
ML071430234 | 13 June 2007 | Issuance of Amendment Nos. 177 and 164 Changes to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation. |
ML071560183 | 11 November 2005 | 11-2005-DRAFT Outline |
ML071560196 | 18 May 2005 | 11-2005 - Final Outline |
ML071560201 | 14 November 2005 | 11-2005 - Draft Operating Exam |
ML071560212 | 14 November 2005 | 11-2005-FINAL Operating Exam |
ML073450383 | 5 December 2007 | Technical Specification Bases Control Program |
ML081500254 | 30 April 2008 | Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 7, Table of Contents |
ML101830463 | 4 December 2009 | ST-2009-12-Draft Written Exam |
ML101830464 | 4 December 2009 | ST-2009-12-Final OP Test |
ML11250A043 | 22 September 2011 | Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Review, Set 1 (TAC Nos. ME4936 and ME4937) |
ML113000006 | 26 September 2011 | 2011-09-Final Operating Test |
ML113480090 | 26 September 2011 | 2011-09-Draft Operating Test |
ML113480097 | 26 September 2011 | 2011-09-Draft Outlines |
ML113480108 | 19 September 2011 | 2011-09-DRAFT Written Exam |
ML12229A060 | 8 August 2012 | Transmittal of the Radiological Emergency Preparedness Final Report for South Texas Project Electric Generating Station Exercise Evaluated on May 9, 2012 |
ML12297A331 | 27 November 2012 | Summary of Prelicensing Meeting with STP Nuclear Operating Company to Discuss Proposed Amendment for Approval of Revised Fire Protection Program Related to Alternate Shutdown Capability for South Texas, Units 1 and 2 |
ML13008A528 | 25 April 2013 | Issuance of Amendment Nos. 200 and 188, Revise Technical Specification 3.3.3.6, Accident Monitoring Instrumentation |