Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000004/19990449 November 2011IR 05000498-11-004 & 05000499-44-004, on 07/01/2011 - 09/30/2011, South Texas Project Electric Generating Station, Units 1 and 2, Integrated Resident and Regional Report; Operability Evaluations; Identification and Resolution of Problems
IR 05000498/198701729 May 1987Insp Repts 50-498/87-17 & 50-499/87-17 on 870330-0403.No Violations or Deviations Noted.Major Areas Inspected: Implementation of Fire Protection Program & Compliance W/Requirements of 10CFR50,App R (Safe Shutdown)
IR 05000498/198703916 August 1987Insp Repts 50-498/87-39 & 50-499/87-39 on 870530-0626. Violations Noted.Major Areas Inspected:Standby Diesel Generator Review,Preoperational Test Results Review,Ie Bulletins & Circulars & Temporary Mod Program Review
IR 05000498/198800211 March 1988Insp Repts 50-498/88-02 & 50-499/88-02 on 880104-29.No Violations or Deviations Noted.Major Areas Inspected: Allegations,Hvac,Duct Sealant Matl,Nsss Equipment in Unit 1, Electric Cable & Battery Room Mods
IR 05000498/19930438 December 1993Insp Repts 50-498/93-43 & 50-499/93-43 on 931102-19. Major Areas Inspected:Licensee self-assessment Capability W/ Industry & Followup on Previous Findings
IR 05000498/199800912 November 1998Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support
IR 05000498/200200618 April 2003IR 05000498-02-006; IR 05000499-02-006, on 12/29/2002 - 03/22/2003, STP Nuclear Operating Company; South Texas Project Electric Generating Station; Units 1 & 2. Integrated Resident & Regional Rpt; Event Followup, Outage Activities, Pi&R, Mi
IR 05000498/20030025 August 2003IR 05000498-03-002 and IR 05000499-03-002, on 3/23/02 - 06/21/03; South Texas Units 1 & 2. Integrated Resident & Regional Report; Event Followup, Other Activities, Maintenance, Implementation, Maintenance, Risk, ALARA Planning & Controls
IR 05000498/200800312 August 2008IR 05000498-08-003, 05000499-08-003 on 04/07/08 - 06/28/08; South Texas Project Electric Generating Station, Units 1 and 2; Integrated Resident and Regional Report; Postmaintenance Test, Refueling Outage Activities, Access Control to Radiol
IR 05000498/200900224 April 2009IR 05000498-09-002, 05000499-09-002 01/01/2009 - 04/04/2009; South Texas Project Electric Generating Station, Units 1 and 2, Integrated Resident and Regional Report; Maintenance Risk Assessments, Operability Evaluations, and Surveillance Te
IR 05000498/20120032 August 2012IR 05000498-12-003 & 05000499-12-003, on 03/31/2012 - 06/29/12, South Texas Project Electric Generating Station, Units 1 & 2, Integrated Resident & Regional Report, Operability Evaluations & Functionality Assessments & Followup of Events
IR 05000498/201500411 February 2016NRC Integrated Inspection Report 05000498/2015004 and 05000499/2015004
IR 05000498/20160048 February 2017NRC Integrated Inspection Report 05000498/2016004 and 05000499/2016004
IR 05000498/201800313 December 2018Errata - South Texas Project Electric Generating Station, Units 1 and 2 - NRC Integrated Inspection Report 05000498/2018003 and 0500499/2018003
IR 05000498/202000110 June 2020Revised Integrated Inspection Report 05000498/2020001 and 05000499/2020001
Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units23 March 1990Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units
Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown25 February 1992Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown
Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization8 April 1993Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization
Information Notice 1993-62, Thermal Stratification of Water in BWR Reactor Vessels10 August 1993Thermal Stratification of Water in BWR Reactor Vessels
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications26 November 1993Potential Problems with BWR Level Instrumentation Backfill Modifications
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System24 May 1994Undetected Accumulation of Gas in Reactor Coolant System
Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 115 July 1994Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel18 January 1996Partial Bypass of Shutdown Cooling Flow from Reactor Vessel
Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown18 June 1996Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown
Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves5 August 1996Unexpected Opening of Multiple Safety Relief Valves
Information Notice 1996-56, Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power22 October 1996Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power
Information Notice 1996-65, Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown11 December 1996Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown
Information Notice 1997-83, Recent Events Involving Reactor Coolant System Inventory Control During Shutdown5 December 1997Recent Events Involving Reactor Coolant System Inventory Control During Shutdown
Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick5 May 1999Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick
ML02058049314 February 2002Proposed Change to Radiation Monitoring Technical Specification
ML03115058529 January 1985Withdrawn NRC Generic Letter 1985-004: Operator Licensing Examinations
ML0334305919 September 200308/2003 Final Operating Exam
ML04338002830 November 2004Tech Spec Pages for Amendments 165 and 155 Elimination of Requirements for Hydrogen Recombiners and Hydrogen Monitors
ML07143023413 June 2007Issuance of Amendment Nos. 177 and 164 Changes to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation.
ML07156018311 November 200511-2005-DRAFT Outline
ML07156019618 May 200511-2005 - Final Outline
ML07156020114 November 200511-2005 - Draft Operating Exam
ML07156021214 November 200511-2005-FINAL Operating Exam
ML0734503835 December 2007Technical Specification Bases Control Program
ML08150025430 April 2008Project, Units 1 and 2, Updated Final Safety Analysis Report, Revision 14, Chapter 7, Table of Contents
ML1018304634 December 2009ST-2009-12-Draft Written Exam
ML1018304644 December 2009ST-2009-12-Final OP Test
ML11250A04322 September 2011Requests for Additional Information for the Review of the South Texas Project, Units 1 and 2 License Renewal Application - Aging Management Review, Set 1 (TAC Nos. ME4936 and ME4937)
ML11300000626 September 20112011-09-Final Operating Test
ML11348009026 September 20112011-09-Draft Operating Test
ML11348009726 September 20112011-09-Draft Outlines
ML11348010819 September 20112011-09-DRAFT Written Exam
ML12229A0608 August 2012Transmittal of the Radiological Emergency Preparedness Final Report for South Texas Project Electric Generating Station Exercise Evaluated on May 9, 2012
ML12297A33127 November 2012Summary of Prelicensing Meeting with STP Nuclear Operating Company to Discuss Proposed Amendment for Approval of Revised Fire Protection Program Related to Alternate Shutdown Capability for South Texas, Units 1 and 2
ML13008A52825 April 2013Issuance of Amendment Nos. 200 and 188, Revise Technical Specification 3.3.3.6, Accident Monitoring Instrumentation