Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RBG-47328, Entergy - River Bend Station (RBS) Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation: EA-12-051 | 23 January 2013 | Entergy - River Bend Station (RBS) Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation: EA-12-051 | Boric Acid High Radiation Area Locked High Radiation Area FLEX Spent Fuel Pool Instrumentation |
RBG-47329, Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 28 February 2013 | Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | High winds Ultimate heat sink Time to boil Safe Shutdown Earthquake Operating Basis Earthquake Emergency Lighting FLEX Seismically rugged Design basis earthquake |