Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
05000305/FIN-2010007-01 | Calculation Methodology Did Not Represent Actual Plant Equipment Configuration | |
05000305/LER-2011-001 | Auxiliary Building Special Ventilation Inoperability Results in Prohibited Technical Specification Condition | |
05000305/LER-2012-006 | Train A Special Ventilation Inoperable for Longer Period than Allowed due to Charcoal Filter Efficiency | |
05000305/LER-2012-009 | Missed Verification of Offsite Circuit Breaker Alignment and Power Availability, Within Completion Time | |
ENS 40950 | Control Room Emergency Zone Boundary Outside Design Basis | |
ENS 41226 | Safety Injection Accumulator Isolation Valves Found Closed and Their Breakers Locked Off. | |
ENS 42509 | Shield Building Ventillation System Declared Inoperable | |
ENS 42557 | Potential Loss of Rhr | |
ENS 43633 | Auxiliary Building Special Ventilation and Shield Building Ventilation Systems Inoperable | |
ENS 43651 | Shield Building Ventilation System Inoperable | |
ENS 43689 | Potential Unavailability of Two Way Radio System to Support Safe Shutdown | |
ENS 44616 | Non-Functional Steam Exclusion Barrier | |
ENS 44746 | Non-Functional Steam Exclusion / Control Room Exclusion Zone (Crez) Barrier | |
ENS 44938 | Non-Functional Steam Exclusion Barrier | |
ENS 44994 | Reactor Shutdown Required by Technical Specifications | |
ENS 46562 | Steam Exclusion Door Declared Inoperable | |
ENS 47755 | Potential for Aerial Lift to Impact Service Water Piping During Seismic Event | |
ENS 47871 | Both Trains of Residual Heat Removal Declared Inoperable | |
ENS 47873 | Both Trains of Residual Heat Removal System Declared Inoperable | |
ENS 48209 | Minor Thru-Wall Leak at Weld in Safety Injection Suction Piping | |
IR 05000305/2002003 | 25 July 2002 | IR 05000305-02-003, on April 1-June 30, 2002, Nuclear Management Co., Llc. Operability Evaluations, Surveillance Testing & Event Followup. Non-Cited Violations Noted |
IR 05000305/2007002 | 10 May 2007 | IR 05000305-07-002, 01/01/2007 - 03/31/2007; Kewaunee Power Station. Adverse Weather, Maintenance Effectiveness, Maintenance Risk Assessments and Emergent Work Control, Operability Evaluations, Refueling and Other Outage Activities |
IR 05000305/2007006 | 1 June 2007 | IR 05000305-07-006, on 01/29/2007 - 03/02/2007; Kewaunee Power Station; Component Design Basis Inspection (CDBI) |
IR 05000305/2007011 | 1 February 2008 | IR 05000305-07-011; on 10/26/2007-12/19/2007; Kewaunee Power Station; Supplemental Inspection 95002, Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area |
IR 05000305/2009003 | 5 August 2009 | IR 05000305-09-003, on 04/01/2009 - 06/30/2009, Kewaunee Power Station, Operability Evaluations, Component Design Bases Inspection, Surveillance Testing; and Follow Up of Events and Notices of Enforcement Discretion |
IR 05000305/2010007 | 12 March 2010 | IR 05000305-10-007 (DRS) on 01/25/2010 - 02/12/2010 for Kewaunee Power Station, Evaluations of Changes, Tests or Experiments and Permanent Plant Modifications |
IR 05000305/2011003 | 28 July 2011 | IR 05000305-11-003, 4/01/2011 - 6/30/2011; Kewaunee Power Station; Maintenance Effectiveness, Operability Evaluations, and Identification and Resolution of Problems |
Information Notice 1996-44, Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly | 5 August 1996 | Failure of Reactor Trip Breaker from Cracking of Phenolic Material in Secondary Contact Assembly |
ML021440232 | 7 May 2002 | Proposed Amendment 180 Application for Technical Specification Change Re Missed Surveillance & Adoption of Technical Specifications Bases Control Program) Using Consolidated Line Item Improvement Process |
ML022680633 | 24 September 2002 | Technical Specifications, Revise Requirements for Missed Surveillance Using the Consolidated Line Item Improvement Process, (MB5185) - S105735 |
ML022880375 | 11 October 2002 | Correction to Issuance of Amendment 163 - S105862 |
ML040420418 | 30 January 2004 | Responses to NRC Clarification Questions on Responses to Requests for Additional Information Regarding License Amendment Request 195, Stretch Power Uprate |
ML041610046 | 1 June 2004 | License Amendment Request 204 to Technical Specifications; Extend Reactor Trip System and Engineered Safety Features Actuation System Surveillance Test Intervals as Evaluated in WCAP-15376-P-A |
ML043570017 | 14 December 2004 | from NMC Re Technical Evaluation of Proposed Method of Class 3 Pipe Leak Operability Determinations |
ML050460220 | 14 February 2005 | IR 05000305-04-009 on 10/01/2004 - 12/31/2004 for Kewaunee Nuclear Power Plant; Fire Protection, Refueling and Outage Activities, Identification and Resolution of Problems, Event Follow-up, Other Activities and Cross-Cutting Areas |
ML051440297 | 26 October 2004 | Revision to Emergency Action Levels, Facility Operating License as Amended Through October 21, 2004 Document |
ML053040352 | 24 February 2011 | Current Facility Operating License DPR-43, Tech Specs, Revised 10/07/2015 |
ML053610095 | 16 December 2005 | Appendix C - Fault Tree Analysis - Attachment 1 - Human Error Probabilities; Attachment 1:A - Human Error Probabilities |
ML072000428 | 26 July 2007 | FAQ Log, Dated 6/13/07 |
ML072190461 | 9 August 2007 | Appeal of FAQ 69.2 - Emergency Diesel Generator Fuel Oil Line Filling Failure |
ML072530614 | 21 September 2007 | Public Meeting Summary on the Reactor Oversight Process |
ML072960170 | 31 October 2007 | Public Meeting Summary on the Reactor Oversight Process |
ML091480351 | 31 December 2008 | 2008 Radiological Monitoring Program, Annual Report Parts I and II |
ML092160413 | 13 April 2009 | 2009 Kewaunee Initial Examination Proposed Written Examination |
ML092230618 | 6 August 2009 | Response to Request for Additional Information for the Review of the License Renewal Application - Leak Before Break/Boral |
ML092440421 | 24 August 2009 | Attachment 1 - Volume 3, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Chapter 1.0, Use and Application, Revision 0 |
ML092440423 | 24 August 2009 | Attachment 1 - Volume 5, Kewaunee Power Station, Improved Technical Specifications Conversion, ITS Section 3.0, LCO and SR Applicability, Revision 0 |
ML101250146 | 26 April 2010 | 2009 Annual Environmental Monitoring Report |
ML101890211 | 1 July 2010 | Attachment 1, Volume 5, Revision 1, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Section 3.0, LCO and SR Applicability |
ML101890215 | 1 July 2010 | Attachment 1, Volume 3, Revision 1, Kewaunee Power Station Improved Technical Specifications Conversion, ITS Chapter 1.0 Use and Application |