Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML19269F07816 November 1979Four ROs on 710413,0205,731013 & 740427 Re Partial & Total Losses of Offsite Power.Caused by Wiring Errors & Weather Conditions.No Voltage or Frequency Problems Occurred
ML19309A45730 December 1975RO 50-266/75-18:on 751217,during Facility Refueling,Failed Fuel Assembly Discovered on D-03 Fuel Rods.Caused by Water Impingement Through Baffle Plate While Failed Assembly Was in Cycle 2 Position H-1.Thorough Insp Program Is Underway
ML20009D63916 July 1981Ro:On 810715,util Review Committee Met to Consider Info Received on 810714 from Bechtel Re Investigation of Masonry Walls,Per IE Bulletin 80-11.Stresses in Walls of Control Room Exceeded Revised Acceptance Criteria Limits
ML20038A69610 November 1981Special 30-day Rept Re 811010 Overpressure Mitigating Sys Event.Operators Will Be Instructed in Importance of Meeting & Maintaining Conditions Specified in Test Procedure
ML20041B3259 February 1982Ro:On 820111,unit Tripped Due to Freezing of Steam Generator Pressure Sensing Lines.Analysis of Reactor Coolant Sample Showed Activity of 1.01 Uci Dose Equivalent I-131.Later Sample Showed 0.935 Uci Dose Equivalent