Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000338/1993300 | 20 October 1993 | Exam Repts 50-338/93-300 & 50-339/93-300 on 930825-0910 & 930921-24.Exam Results:Six SROs & Five ROs Received Written & Operating Exams.All Operators Passed Exams | Job Performance Measure |
IR 05000338/1993301 | 12 November 1993 | Exam Rept 50-338/93-301 on 931008-15.Exam Results:Eight ROs & Six SROs Passed Written & Operating Exams.Exam for Both Units | |
ML20058E583 | 5 October 1990 | Exam Rept 50-338/OL-90-01 on 900820 & 27.Exam Results:Seven Reactor Operators & 9 Senior Reactor Operators Passed Exam | |
ML20137R682 | 19 November 1985 | Exam Rept 50-338/OL-85-02 on 851015-18.Exam results:12 Candidates Passed Oral exams,11 Candidates Passed Simulator exams,11 Candidates Passed Written Exam & One Failed.Exam Questions,Answer Key & Facility Comments Encl | |
ML20151U628 | 16 January 1986 | Exam Rept 50-338/OL-86-03 on 851204-06.Exam Results:Six Candidates Passed & Three Failed.Requalification Program Evaluation Marginally Acceptable | Temporary Modification Fire Watch Power change |
ML20151X794 | 14 April 1988 | Exam Rept 50-338/OL-88-01 on 880216-25.Exam Results:All Candidates Passed | Boric Acid Shutdown Margin Fire Barrier Temporary Modification Fuel cladding Pressure Boundary Leakage Continuous fire watch Hourly Fire Watch |
ML20155B067 | 2 October 1998 | NRC Operator Licensing Exam Repts 50-338/98-301 & 50-339/98-301 (Including Completed & Graded Tests) for Tests Administered on 980817-21 & 31-0903 | Job Performance Measure |
ML20206F466 | 7 April 1987 | Exam Rept 50-338/OL-87-01 on 870209-12.Exam Results:Five of Five Reactor Operators & Six of Six Senior Reactor Operators Passed Exam.Nrc Exams & Comments on Exams Encl | Boric Acid Shutdown Margin High Radiation Area Grab sample Anticipated operational occurrence Locked High Radiation Area Power change |
ML20214L202 | 14 November 1986 | Exam Rept 50-338/OL-86-04 on 860623-27.Exam Results:Three of Three Reactor Operator Candidates & Two of Seven Senior Reactor Operators Passed | |
ML20245F475 | 15 June 1989 | Exam Repts 50-338/OL-89-01 & 50-339/OL-89-01 on 890508-12. Exams Results:Written Exams & Operating Tests Administered to Two Senior Reactor Operator & Eight Reactor Operator Applicants.All Candidates Passed Exams |