Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000341/1985001 | 17 May 1985 | Exam Rept 50-341/85-01 of Exam Administered on 850212.Exam Results:Two Instructors & All Reactor Operators Passed Exam | Shutdown Margin Squib Scram Discharge Volume Overtravel Pressure Boundary Leakage Power change |
IR 05000341/1998301 | 29 June 1998 | NRC Operator Licensing Exam Rept 50-341/98-301OL(including Completed & Graded Tests) for Tests Administered on 980406- 0520.Six Applicants Were Administered Exam,Two Failed Written Exam,Two Failed Operating Exam & One Failed Both | Safe Shutdown High winds Shutdown Margin Reactor Vessel Water Level High Radiation Area Half scram Temporary Modification Squib Job Performance Measure Scram Discharge Volume Systematic Assessment of Licensee Performance Earthquake Fire Watch Power change Failure to Scram |
ML20055G392 | 12 July 1990 | Exam Rept 50-341/OL-90-02 on 900528 & 0601-03.Exam Results: Three Reactor Operators & Five Senior Reactor Operators Passed Exams | |
ML20153F552 | 31 August 1988 | Exam Rept 50-341/OL-88-01 on 880802.Exam Results:Candidate Successfully Passed Exam | Scram Discharge Volume Overtravel |
ML20196C070 | 5 February 1988 | Exam Rept 50-341/OL-87-01 on 871215-18.Exam Results:Senior Reactor Operator Passed Written Exam But Failed Simulator Portion of Operating Test.Four Out of Five Reactor Operators Passed Written Exam & All Five Passed Operating Test | |
ML20203N143 | 29 April 1986 | Exam Rept 50-341/OL-86-01 on 860325-28.Exam Results:Three Senior Operator Candidates Passed Written Exam & Six Senior Operator Candidates Passed Oral/Operating Exam.Exam & Answer Key for Senior Reactor Operators Encl | Shutdown Margin High Radiation Area Power change |
ML20210V420 | 2 October 1986 | Requalification Exam Rept 50-341/OL-86-02 on 860729-31 & 0827-28.Exam Results:All Reactor Operators & Senior Reactor Operators Passed Written,Operating & Simulator Exams,As Applicable | High Radiation Area Half scram Hydrostatic |
ML20211M983 | 19 February 1987 | Exam Rept 50-341/OL-86-03 on 871117-21.Exam Results:Six Reactor Operator Candidates Passed Written Exam,Ten Passed Oral Exam & Nine Passed Simulator Exam.All Three Senior Reactor Operator Candidates Passed Written & Oral Exams | Shutdown Margin Half scram |