ML14309A192

From kanterella
Revision as of 09:04, 1 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Comment (00002) of Michael Keegan on Behalf of Don'T Waste Michigan on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations
ML14309A192
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/30/2014
From: Keegan M J
Don't Waste Michigan
To:
Rules, Announcements, and Directives Branch
References
79FR58812 00002, NRC-2014-0207
Download: ML14309A192 (2)


Text

Page 1 of 27--J-(, As of: October 31, 2014Received:

October 30, 2014Status: Pending_

PostPUBLIC SUBMISSION Tracking No. ljy-8f80-rg6t Comments Due: October 34Submission Type: WebDocket: NRC-2014-0207 Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined LicensesInvolving No Significant Hazards Considerations 10,.2014Comment On: NRC-2014-0207-0001 Applications and Amendments to Facility Operating Licenses and Combined LicensesHazards Considerations Document:

NRC-2014-0207-DRAFT-0002 Comment on FR Doc # 2014-23015 No Significant Submitter Information Name: Michael KeeganAddress:P.O. Box 463Monroe, MI, 48161Email: mkeeganj

@comcast.net Submitter's Representative:

Michael J. KeeganOrganization:

Don't Waste MichiganGovernment Agency Type: StateGovernment Agency: NGO1710i-~wrn-~mO~)General Comment

Dear NRC Docketing,

Don't Waste Michigan goes on record in opposition to the proposed Palisades, License Amendment Request toImplement 10 CFR 50.61 a, "Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events."

dated 7/29/2014.

Palisades is the most embrittled nuclear power plant in the nation. Palisades

Entergy, LLC is currently operating with a chunk of metal stuck in the bottom of the reactor.

The Palisades nuclear facility is compromised in amultitude of ways that are well known and yet, unaddressed by Utility and NRC and with work is deferred.

To the best of our records, Palisades exceeded technical specification regarding Pressurized Thermal Shock in1981. Since that time standards have been pencil whipped 7 times by the NRC and methodologies have beenswitched out. Each time Palisades exceeds embrittlement

/ PTS standards, the NRC has rolled those standards https://www.fdms.gov/fdms-web-agency/component/contentstreamer?objectld=090000648190cd6f&for...

10/31/2014 Page 2 of 2back. The NRC oversight has been inadequate.

If the Palisades reactor vessel fails due to PTS it will not be anaccident.

It will be the probable outcome to a set of circumstances which the NRC has tolerated for decades atgreat peril to the public. The public has no confidence in the NRC knowing what they are doing. This hasbecome a jobs program for the NRC, perpetually kicking the proverbial can down the road with fingers crosseduntil it is time to retire. Stop twisting this Tiger by the tail.Don't Waste Michigan requests that the NRC not issue a License Amendment to Palisades Entergy LLC.Thank youMichael J. KeeganDon't Waste MichiganP.O. Box 463 Monroe, MI 48161mkeeganj

@comcast.net https://www.fdms.gov/fdms-web-agency/component/contentstreamer?objectld=090000648190cd6f&for...

10/31/2014