San Onofre, Units 2 and 3 - Updated Final Safety Analysis Report and Updated Fire Hazard Analysis, Revised Submittal Date
ML15033A091
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/28/2015
From: Brabec R C
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML15033A091 (3)


Text

J SOUTHERN CALIFORNIAEDISONAn EDISON INTERNATIONALS) CompanyRichard C. BrabecPrincipal Manager, Nuclear Regulatory Affairsand Emergency PlanningJanuary 28, 2015U. S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, D.C. 20555

Subject:

Docket Nos. 50-361 and 50-362Updated Final Safety Analysis Report and Updated Fire HazardAnalysis, Revised Submittal DateSan Onofre Nuclear Generating Station, Units 2 and 31) Letter from T. J. Palmisano (SCE) to U. S. Nuclear Regulatory Commission(Document Control Desk) dated September 17, 2014,

Subject:

Docket Nos. 50-361 and 50-362, Updated Final Safety Analysis Report Chapter 15, San OnofreNuclear Generating Station, Units 2 and 3

Reference:

Dear Sir or Madam:

In Reference 1 Southern California Edison (SCE) submitted a revision to Chapter 15 of the UpdatedFinal Safety Analysis Report (UFSAR) for San Onofre Nuclear Generating Station (SONGS), Units2 and 3 which summarized the evaluations of the design basis accident analyses that areapplicable to the permanently defueled condition. In addition, Reference 1 provided a commitmentto submit by January 31, 2015 a revision of the SONGS Units 2 and 3 UFSAR that incorporatesUFSAR changes made prior to September 1, 2014 to reflect the SONGS Units 2 and 3 permanentlydefueled plant condition.The submittal date for the revised SONGS Units 2 and 3 UFSAR is hereby changed to February 13,2015.There is one revised commitment contained in this letter.Should there be any questions regarding this submittal, please contact Ms. Andrea Sterdis at (949)368-9985.Attachment 1: Revised List of Commitmentscc: M. Dapas, Regional Administrator, NRC Region IVT. J. Wengert, NRC Project Manager, San Onofre Units 2 and 3S. Y. Hsu, California Department of Health Services, Radiologic Health BranchP.O. Box 128San Clemente, CA 92672(949) 368-7418 PAX 87418Fax: (949) 368-7575John.Brabec@sce.comnA053 Revised List of Commitments Commitment One-Time Sustainable Scheduled CompletionAction Action DateSubmit a revision of the SONGS Units 2and 3 UFSAR that will incorporate UFSARchanges that were made prior toSeptember 1, 2014 to reflect the SONGSUnits 2 and 3 permanently defueled plantconditionFebruary 13, 2015x