ML14149A407
From kanterella
Revision as of 08:10, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML14149A407 | |
Person / Time | |
---|---|
Site: | Palo Verde ![]() |
Issue date: | 04/18/2014 |
From: | Barnes K AREVA |
To: | Office of Nuclear Reactor Regulation |
References | |
102-06879-JJC-JHK-DCE 32-9220624-000 | |
Download: ML14149A407 (34) | |
Similar Documents at Palo Verde | |
---|---|
Category:Calculation
MONTHYEARML23325A1612023-10-26026 October 2023
[Table view]Relief Request 70 - Proposed Alternatives in Accordance with 10 CFR 50.55a(z)(1) for Pressurizer Lower Shell Temperature Nozzle ML22116A1102022-04-26026 April 2022 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2021 ML21110A0352021-04-16016 April 2021 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2020 ML15198A2272015-07-15015 July 2015 Attachment 4: Calculation TR-FSE-15-2-NP, Rev. 1, Palo Verde Nuclear Generating Station Unit 3 Evaluation of Potential Loose Part - Reactor Coolant Pump Instrument Nozzle Weld Fragment. ML15198A2262015-07-15015 July 2015 Attachment 3: Calculation CN-PAFM-15-20-NP, Rev. 2, Palo Verde Unit 3 RCS Cold Leg Alloy 600 Small Bore Nozzle Repair Transient Stress and Fracture Mechanics Evaluation for One Cycle Operation. ML15198A2252015-07-15015 July 2015 Attachment 2: Calculation CN-MRCDA-15-13-NP, Qualification of Palo Verde Unit 3 Reactor Coolant Pump Replacement Instrumentation Nozzle. ML14149A4022014-04-18018 April 2014 Calculation 32-9219662-000, Weld Residual Stress Analysis for PVNGS3 Rv Bmi Nozzle Repair, (Non-Proprietary), Attachment 3 ML14149A3332014-04-18018 April 2014 Calculation 32-9222042-000, ASME Section XI End of Life Analysis of PVNGS3 Rv Bmi Nozzle Repair, (Non-Proprietary), Attachment 1 ML14149A4072014-04-18018 April 2014 Calculation 32-9220624-000, Natural Frequency and Structural Integrity Analysis, (Non-Proprietary), Attachment 6 ML14149A4032014-04-18018 April 2014 Calculation 32-9220625-000, ASME Section III End of Live Analysis of PVNGS3 Rv Bmi Nozzle Repair, (Non-Proprietary), Attachment 4 ML14149A4042014-04-18018 April 2014 Calculation 32-9222043-000, Bmi Nozzle Crack Growth Analysis, (Non-Proprietary), Attachment 5 ML13317A0722013-11-0808 November 2013 Attachment 2 - Flaw Fracture Mechanics Evaluation to Support Restart, Calculation 32-9212942-001, Palo Verde Unit .3 Bmi Nozzle Repair - Section XI Analysis for Restart ML14149A3422013-11-0808 November 2013 Calculation 51-9214650-000, Corrosion Evaluation for Reactor Vessel Bmi Nozzle Modification, (Non-Proprietary), Attachment 2 ML12138A3222012-04-27027 April 2012 Offsite Dose Calculation Manual, Revision 26 ML0822506752008-07-11011 July 2008 American Society of Mechanical Engineers (ASME) Code, Section XI, Request for Approval of an Alternative Repair Method - Relief Request No. 39 ML0712203072006-09-15015 September 2006 Offsite Dose Calculation Manual, Revision 21 ML0612300902005-08-31031 August 2005 Appendix D, Offsite Dose Calculation Manual Revision 20 ML0519404712005-02-11011 February 2005 Attachment 2-D, FAI/05-06, Revision 0, Summary Report of MAAP4 LOCA Analysis in Support of Past Operability Assessment of Degraded HPSI Performance During Containment Recirculation at Palo Verde ML0519404672005-02-11011 February 2005 Attachment 2-B, FAI/04-86, Revision 0, Test Report for Phase 2 of Experimental Investigation of Post Air Intrusion Into ECCS Suction Piping for Palo Verde Nuclear Generating Station ML0432305672004-11-11011 November 2004 Attachment 2, Structural Integrity Calculation Package, File No. PV-04Q-330, Heater Sleeve/Sheath Weld Evaluation - Alloy 600 Sheaths ML0432305612004-11-11011 November 2004 Attachment 1, Structural Integrity Calculation Package, File No. PV-04Q-329, Heater Sleeve/Sheath Weld Evaluation - Stainless Steel Sheaths ML0519404662004-09-17017 September 2004 Attachment 2-A, FAI/04-65, Revision 0, Test Report for Phase I of Experimental Investigation of Post RAS Air Intrusion Into ECCS Suction Piping for Palo Verde Nuclear Generating Station ML0512902802004-05-14014 May 2004 Offsite Dose Calculation Manual for Palo Verde Nuclear Generating Station Units 1, 2, and 3, Revision 19 ML0512902772004-03-24024 March 2004 Offsite Dose Calculation Manual for Palo Verde Nuclear Generating Station Units 1, 2 and 3, Revision 18 ML0328300302003-09-18018 September 2003 to 13-JC-ZZ-0204, Uncertainty of Analog-to-Digital and Digital-to Analog Converters for Computer Input in Erfdads, Pms, CPC, and Qspds. ML18192A3991975-07-25025 July 1975 NUS-1416, Rev. 1, Estimate of the Probability That an Aircraft Will Impact the Pvngs. 2023-10-26 |
Retrieved from "https://kanterella.com/w/index.php?title=ML14149A407&oldid=406970"