ML17207A814

From kanterella
Revision as of 00:30, 30 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
QA Program for Operations Phase
ML17207A814
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 02/06/1980
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17207A813 List:
References
NUDOCS 8002120507
Download: ML17207A814 (8)


Text

QUALITYASSURANCE DURING THE OPERATIONS PHASE The generic elements of the FPL Quality Assurance Program are described in the FPL Topical Quality Assurance Report (FPLTQAR)1-76A. The Topical QA Report defines departmental responsibilities by which FPL implements the Corporate QA Program, and is an integral part of the Corporate Quality Assurance Manual (FPL-NQA-100).

Additionally, the FPL Topical Quality Assurance Report defines the guidance documents the QA Program follows; The Topical Quality Assurance Report is, therefore, referenced by this letter, and only information which is in addition to that found in the Topical QA Report is contained herein.

1.0 ORGANIZATION The FPL oxganizational structure, including the Plant Managex, is described in the FPL Topical Quality Assurance Report (TQAR 1.0). The St. Lucie Unit 1 Plant staff organization below the Plant Manager is shown on Figure 1-1 attached.

Plaint Mana ex The Plant Manager has the direct responsibility for implementing Quality Assurance

<<eauiremenls for the Power Resources Department at the St. Lucie Ux<it 1 Plant.

Qua~lit Cont3:ol Suparviso."

The Plant Quality Control Supervisor is responsible for planning.and administering the Plant Quality Control Program which includes inspection, monitoring, and surveillance of safety-related Power Resources activities on site.

Lines of communication between the Quality Control Supervisor and the plant staff

pt t

1 W

II I h

S I

y, ~

I

have not been indicated on Figure 1-'I because the Quality Control Supexvisor has the authority and freedom to communicate with all levels of the plant staff and line management involved with a tivities affecting the quality of nuclear safety-related structures, systems, and components. The Quality Control Supervisor reports to the Plant Manager and has sufficient authority to stop nonconforming work or operations.

Additional responsibilities of the Quality Control Supervisor include:

a) providing guidance in the intexpxetation of federal regulations related to the Quality Assurance Progranx into quality instructions where the requirements are not interpreted at a corporate level, and provide guidance in other adminis trative requirements involving quality assux.ance ac tivities; b) serving as the plant intexface with the Quality Assurance Department and Nuclear Regulatory Commission inspectors; c) traclxing plant site nonconformances, inspection and audit open items; d) advising plant management, including the Plant Manager if necessary> of the need for timely corrective action; e) maintaining adequate records of quality-related site activities,')

and xlistributing and controlling plant procedures, instructions, and approved drawings.

Plant Quality Control Department engineers'" and inspectors receive functional and administrative direction from the Quality Control Supervisor. En addition to members of the Quality Control Department, experienced individual in other plant departments who are qualified and certified as Quality Control inspectors, may function in a Quality Control role. When so functioning, the individuals do not, perform or directly supervise the per forxnance of the activity being inspected.

pt I

r

~ s II t',

~

4 II IR 5

3 9.0 CONTROL OF SPECIAL PROCESSES The Plant staff reviews special processes of those types identified in TQR 9.0 and other processes to determine if they qualify as'"special processes". Those identified as special processes are controlled, qualified, and performed in accordance with TQR 9.0. The following have been identified as special processes: welding (gas or electric); heat treating metallic substances; nondestxuctive examination (radiography, magnetic particle, ultrasonic, liquid penetrant, eddy cu ent, neutron radiography).

16.0 CORRECTIVE ACTION Open items against the Plant, from all inspection sources, such as nonconformances, audits, NRC inspections, are track'ed by the Plant Quality Contxol Department, which transmits periodic status repoxts of all open items to the Plant Manager and Plant pexsonnel responsible for corrective action. In addition, Plant Quality Control performs open item follow-up activities to obtain corrective action commitments and obtain the status of open commitments. This tracking activity does not end until the corrective action committed to, has been accomplished.

C

~ ~

0 l

PLANT ASSET FANAGER QA YJLNAGER OPERATXONS OFF SITE ON SITE FACZLITY REVIEW GROUP NAINTENANCE TECHNICAL OPERATIONS ADNZNZSTRATZVE SECURITY QUALXTY CONTROL SUPERVISOR QA SUPEliINTENDENT STAFF SUPERINTENDENT SUPERVISOR SUPERVISOR SUPERVISOR OPERA. ZNG PLOTS INSTRUNENT ASST. PANT C ENGZNEL'RS DOCUvENT CHEMISTRY REACTOR TRAINING OPERATIONS

& CONTROL SUPT.

SUPV.

PHYSICS SUPV. S'liPV. SUPVi AND 'ONTROL 6 ENGINEERS SUP V. ELECTRICAL SUPV. INSPECTORS RL'CORPS amigo Adrs'.nistrativo Reporting ST. LUCIE PLANT Co~micatioas PLAN QUALITY CONTROL ORGAN. ZATION AND INTERFACl'ITH QUALITY ASSURANCE I

~ 1

'k L