08/05/1976 Letter Operating Status Reports of July 1976
ML18227B087
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 08/05/1976
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227B087 (20)


Text

hFCn)gfM 195 U.S. NUCLL'AR REGULATORY CC "IISSIO UMBER I2.70I ~

~

50-250 51/335 y~

FILE NUMBER NRC DISTRIBUTION roR PART 50 DOCI(ET MATERIAL MONTHLY REPORT DATE OF DOCUMENT

'LORIDA POWER 6('IGHT CO MIAMI, FLA 8-5-76 A D SCHMIDT DATE RECEIVED 8-13-76 LETTER ONOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED gCI ORIGINAL

@UN C LASS I F I E D 1 SIGNED

'ONTHLY COPY DESCRIPTION I LETTER TRANS THE FOLLOWING: REPORT FOR JULY 1976 PLANT & COMPONENT OPERABILITY &

AVAILABILITY, THIS REPORT TO BE USED XN PREPARING GRAY BOOK BY PLANS & OPERATXONS ~

NOTE: ATEKZED ALSO IS CORRHCTlK) COPY FOR ST LUCIE 51 FOR JUNE 1976..

PLANT NAME: ST LUCIE gl ACKNOVVLEBGE>

TUlUQEY POINTS'03 & 54, gO NOT REMOVE FOR ACTION/INFO RMATION HXPC

<r CYS FOR AC ON INTERNAL D IST Rl BUTION F&2JX N

BRANCH CHIEF L EXTERNAL DISTRIBUTION CONTROL NUMBER

\ ~~ ~~

Nnc roRM ioo Iwo)

0

'Regoiatory Docket Fill'LORIDA POWER & LIGHT COMPANY August. 5, 1976 tFg Gentlemen: nn Oy>

Attached are the July, 1976 Operating Status Reports,. '

Turkey Point Unit Nos. 3 and 4 and St. Lucie U . 1.

St. Lucie Unit No. 1 was previously reported to be in commercial operation, in error. We are attaching the corrected June, 1976 Operating Status Report for St. Lucie Unit No. l.

We regret any inconvenience caused by this error.

Very truly yours, t5t gpt,p~g(0 D.~ Sc midt

~

P-(T-)~

Vice President ~~gg e}au}A10A, p)gMIss}ctH Power Resources gag foe}14JL VTC/pm Attachments ' cc: Mr. Norman C. Moseley Jack R. Newman, Esquire HELPING BUILD FLORIDA

r N 11 r II I II f

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 250 DNIT Turkey Point Unit No. 3 DM'E Au . 5 1976 COMPLETED BY V. T. Chilson TELEPEONE (305) 552 - 3830 Non'8 Jul 1'976 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Hwe-Net) 660 636 17 18

                                                           '43   (HWe-Net) 642 3                                                     19           639 655                                       20           641 651                                       21           639 649                                       22           640 23 652                                       24           637 650                                       25           638 10           654                                       26           634 652                                       27           640 12           646                                       28           637 13          .644                                       29           636 14           644                                       30           632 15           639                                       31           632 16           641                                       NOTE:    Daily average power level greater than 666 i%He due to cooler condenser cooling water.

APPENDIX C

                                      ~  "OPERATING DATA REPORT
                                                                                    -JN)CKET   NO., 50 -  250
                                                                                           ..UNIT Turkey    Point Unit No. 3 3)ATE Au . 5      1976 REPORT MONTH                Jul  1976
                                                                                .",COMPLETED    BY V. T- Chilson OPERATING    STATUS',

REPORTING PERIODS)001 76,07 01 GROSS'HOURS IN REPORTING PERIODs 744.0 2400 76 07 31 26 THROUGH CURPiENTf ~02(IXr.~ ONER LEVc.L ((tfr1t): 2200 MAX. DEPEND. CAPACITY (A."Ne-Net): 3~ PONER LEVEL TO WHICH RESTRICTED (ZF AVY) (M1(e-Net): NONE 4~ REASONS FOR RESTRICTION (ZF ANY): THIS MiQVTH YEAR TO DATE CUMULA¹'DE 5 N(LVBER OF HOURS REACTOR NAS CRZTXCAL ~ ~ 744-0 4 509.9 25 790.0 6~ REACTOR RESERVE SHUTDOAN HOURS ~ ~ ~ ~ ~ ~ ~ 64.2 7 HOURS GE"1ERATOR ON LINE. 744.0 4 437.6'4 807.6 8 ~ UNIT RESERVE SHUTDON)i( HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 85.0 9D GROSS THER1(AL ENERGY GENERATED (Ã0() .....1 629 884 9 580 710 46 892 970 503 700 3 045 360 15060 596 10, GROSS ELECTRICAL ENERGY GE:. RA -D (N'rTH) ~ .

11. NET ELECTRICAL EVERGY GENERATED (MAH) ....'78 780 2 890 825 14'46 587 12 REACTOR SERVICE FACTOR. 100.0 88.2 ': 80.4 13D REACTOR AVAILABILITYFACTOR. ~ ~ ........ '00. 0 89.5 80. 6 14 ~ UNIT SERVICE FACTOR. 100.0 86.8 77.4
15. UNIT AVAILABILITYFACTOR.... ~ ............ 100.0 86.8 M2~
16. UNIT CAPACITY FACTOR (Using MDC)......... 96:6 84.9 67 7
17. UNIT CAPACITY FACTOR (Using Design MNe) .. ~ 92 ~ 9 81.6 64.1 18 'NIT FORCED OUTAGE RATE. ~

0.2 7 19 ~ SHUT(XNWS SCHEDU ED OVER NEXT 6 MONTHS (TYPES DAT, AND DURATION OF EACH): Refueling, maintenance, and inspections - Oc'tober 4 through November 14, 1076 ED, ZP SSIITDOIOI AT Ei'D OF REPORZ P RZODESTZAA,TED DATE OF STARTIIP: 21 ~ UNZTS IN TEST STATUS (PRIOR TO COvAERCXAL OPERATION): FORECAST ACHIEVED ZNITXAL CRZTZCALXTY IiVITIALELECTRXCZTY COMMERCIAL OPERATION

APPENDIX D DOCKET NO. (I) REASON UNIT SHUTDOWNS AND POWER REDUCiIONS UNIT NAME Turkey Point Unit No. 3 e 3 A: EQUIPMENT FAILURE (EXPLAIN) Bd MAINT. OR TEST ~ DATE Au ust 5 1976 C: rzrUELINC D: REGULATORY RESTRICTION ~ COMPLETED BY V.T. Chilson E: OPERATOR TRAIHING AND LICENSE EXAIIINATION TFLEPHONE 305 552 - 3830 Fd ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) Hd OTHER (EXPLAIN). (2) METHOD METHOD OF I d MANUAL TYPE Fd FORCED DURATION SHUTTING DOWN THE REACTOR OR 2 c MANUAL SCRAM 3 s AUTOMATIC SCRAM NO. Sg SCHEDULED (HOURS) REASON (ll REDUCING POWER(2) CORRECTIVE ACTIONS COMMENTS 43 OTHER (EXPLAIN) NONE Ropmaarc 'Unit No. 3 operated at approximately 100 R R.p. dnripg month.

                                                                                                                                                     ~ l,

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL

                                                       ,DocxET No. 50  251
                                                               .UNIT Turke   Point Unit No. 4 DATE Au . 5 1976 COMPLETED    BY V T. Chilson TELEPH0NE   305   552 - 3830 MONTH DAY AVERAGE DAIZY POWER LEVEL                         DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                                (MWe-Net) 666                                        17            662 2          666                                        18            661 6 7                                                       60 20            662 21 22            658 669                                        23            661 671                                        24            654 25            656 10                                                      26           466 670                                        27            659 12          659                                        28            657 13                                                     29            653 14          656                                         30           652 15                                                      31           628 16          663                                        NOTE:      Daily average power level greater than 666HWe due to cooler condense" cooling water.

APPENDIX C

                                         ~    OPERATING DATA REPORT DOCKET NO. 50        251 UNIT Turke     Point Unit o. 4
                                                                                                   .'DATEAug. 5        1976 REPORT MONTH             Jul   1976                                                      COt(PLETED BY V.      T. Chilson
                                                         ~,'I 4

OPERATINC STATUS', Rl!PORTIHG PERZOD:0001,76 07 01 GRDSS HOUIIS Zll IIEPOEZZHG PERZOD:~7437 THROUGH 2400 76 07 31 PCNER LEVEL (>ddt) t 2200 3, POWER LEVEL TO NHICH RESTRZCTED (IF ANY) (M'rfe-Net}: NO E 4~ REASONS FOR RESTRICTZOAV (ZF ANY) 2 THIS MONTH YEAR TO DATE CUttULiTIVE 4 5 NUMBER OF HOURS REACTOR NAS CRITICAL.. ~ . ~ 741.3 3 627.4 ~/~4 6 i!EAOTOR IIESA'RPE SDZITDOAE HOUIIS.......... -0 7 HOURS GENERATOR ON LINE.... . . . ~ .. . 738.4 3 456.6'8 I'70.2 Si UNIT RESERVE SHUTDO'Nit HOURS . . . . P, GROSS THEUIAD 'ENERGY GEIIERATED I..IO!7..... 1~61 4 2 7 303 040 37 953 676 10* GROSS ELECTRTCAL EKERCY CEiVG;RATED (t744H) . ~ 511 520 2 345 221 12 324 298 11 ~ NET ELECTRICAL ENERGY CEttERATED (&S&) ~ ~ ~ ~ 487 16I 2 223 446 12 ~ REACTOR SERVICE FACTOR ~ ~ ~ ~ ~ ~..... ~ 99. 6 71. 0 74.8 13G REACTOR AVAILABILITYFACTOR.. ~ .. ~ .4 99 ~ 6 71.0 75.2 14 ~ UNIT SERVICE FACTOR. ~ ~ ~ ~ ~ . 99.2 67.6 70.5

                                                                 ...4
                                      ~    ~                   ~               ~

15 ~ UNIT AVAILABILITYFACTOR. ~ ~ ~ 99.2 67.6 70.5 16 ~ UNIT CAPACITY FACTOR (Using MDC) ...., .~ 98.3 65.3 68.9

17. UNZT CAPACITY FAC OR (Using Design MNe) .. ~ 94.5 62.8 65.4 18 'NIT FORCED OUTACE RAT ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 8 5.6 3.4) 19G SHUTDONNS SCHEDULED OVER NEXT 6 MOIVTHS (TYPE, DATE, AND DURATIOtt OF EA4'.it}:

NONE 2D. 17 SHUTDOIPI AT EED OP REPORT P RZOOESTZHA,TED DATE OP STARTUP: 210 UNITS ZN TEST STATUS (PRIOR TO CO!PAERCZAL OPERATIOtt): FORECAST ACHI VED INITIAL CRITICALITY INITIAL ELECTRICITY COMt(ERCZAL OPERATION

APPENDIX D DOCKET NO fil) REASON UNIT SHUTDOWNS AND PolKR REDUCTIONS UNIT NAME Turke Point Unit No. 4 As EQUIPMENT FAILURE (EXPLAIN) Bs= MAINT. OR TEST 4 ~ DATE u us 5 976 Cs REFUELING Ds PZGULATORY RESTRICTION CQMPrsmD BY v. T. chilson Es OPERATOR TRAINING AND LICENSFa EXAMINATION TELEPHONE 552 - 3830 . F6 ADMINISTRATIVE REPORT MDNTH JulY 1976 Gs OPERATIONAL ERROR (EXPI AIN) Hs OTHER (EXPLAIN) i (2) METHOD METHOD OF I s MANUAL TYPE Fs FORCED DURATION SHUTTING DOWN THE REACTOR OR 2 s MANUAL SCRAM 3s AVTOt7lATIC SCRAM NO. DATE Ss SCHEDULED (HOURS) REASON (I) REDVCING POWER(2) CORRECTIVE ACTIONS/COMMENTS 4s OTHER (EXPLAIN) l 15 76-07-2 5.6 Reactor tripped during transient condition resulting from loss of steam generator feedwater pump No. 77A when the pump low auction pressure trip actuated. Corrective action included testing and recalibrating the low suction pressure trip. (Non-nuclear System) Unit Ro. 4 operated at approximately 100 4 R.P. during month exceph for outage of July 26, 1976. et i

APPENDIX B AVERAGE DAILY UNIT PV&R LEVEL DOCKET NO 50 - 335 UNIT St. Lucie Unit No. 1 DATE Au . 5 19'76 COHPLETED BY V. T. Chilson

                                                    ~    TELEPHONE (305) 552  3830 NONTH     July'1976 DAY AVERAGE DAIIY POWER LEVEL                         DAY AVERAGE DAILY POWER LEVEL (MWe  Net)                                             (NWe-Net) 58                                        17 2           75                                        18 3          561                                        19 4
       '   563                                        20 566                                        21 531                                        22 23 334                                        24 10           94                                        26 27 12                                                     28 13                                                     29 14                                                     30 31 16

P&7NYENHNMI 75 NL~NNN APPENDIX C

                                        ~  OPERATZNC DATA REPORT DOCKET NO,        50     335 UNIT   S REPORT MONTH           Jul   1976                                                   COMPLETED BY         V. T Chilson
                                                                               'f OPERATING STATUS'-

1 MAX. DEPEND. CAPACITY (Mde-Net) 5 timated) 3~ POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 722

                                                                                             \

4 REASONS FOR RESTRICTION {ZF ANY): HOURS' "Temporary 90I restriction pending reactor coolant floe analysis" THIS MONTH YEAR TO DATE CUMULAT'VS 59 N(IFQ)ER OF HOURS REACTOR WAS CRITICAL.... 360.1 ' 1 366.6 1 366.6

   ~    REACTOR RESERVE SHUTDOWN                         ...       ~ ~ ~ ~ ~      N/A (1)            N/A                Nfl4 7      HOURS G IIE(IATOR OM       Z,ZNE.......,,.....,                           159.5           1  121.9            1 121.9 8~    UNIT RESERVE        SHUTDOWN     HOURS....     ~ ~ ~ ~   . ~ ~ ~ ~ ~      N/A (1)            N/A (1).           N/A (1) 9,    CRONE      TEENIAL EIIERGY   G    HE(IATEO      (.. "I)    ......         ZOE   0(     '4((5()               ~4'~ll 10 'ROSS ELECTRICAL ENERGY GEIIERATED (MWH) ~ .                                    89 830            418 670            418 670
11. NET ELECTRZCAL 5:IERGY GEHEIIATEO (NIOII ~ ~ ~ ~ 52296 ~49
                                                                             ~

12 'EACTOR SERVICE FACTOP. ~ . ~ ~ 9' ~ 9 ~ ~ ~ . ~ ~ ~ ~

                                                                                  '48 '                66.1              66.1

'13 ~ REACTOR AVAILABILITYFACTOR. ~ ~ ~ .4..4. 4.'8.4 '6.1 66.1

   'NIT SERVICE FACTOR.                   ..      ..
                                                                                                 ~

14 . . ~ ~ 9. . .". 25.5 54.9 54.9 15, ill(ZT AYAZLAEZLZTYFACTOR .....,.....,...., 54 9

16. UNIT CAPACITY FACTOR (Using MDC)......... 13;8 22.8 22.8
17. UNIT CAPACI " FACTOR (Using Design MWc) .. ~ 13.8 22.8 22.8
15. (ft(IT FORCEO OUTAGE RATE,........ ~ ~ ~ ~ ~ ~ ~ ~ ~7 ~
                                                                                                                     ~((.9 19 ~    SHUTDOWNS SCHEDULED OVER             NET     6 MOANTHS {TYPEF DATEF AND DURATION OF                          EACH):

N/A( ) 20 'F SHUTD(XIlN AT END OF REPORT PERIOD, ESTINRTED DATE OF STARTUP: 219 UNITS IN TEST STATUS (PRIOR TO COM4ERCZFAL OPERATION): FORECAST A HIEVE INITIAL CRITICALITY 1 ~AYI 2, 1976 INITIAL ELECTRICITY M~976

                ~   COMA(ERCZAL OPERATION NOTE:       (1) Unit   in test status

APPENDIX D DOCKET NO. 50 - 335 ',1) REASON l UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME St. Lucie Unit No. 1 Af EQUIPMENT FAILURE {EXPLAIN) ~ By MAINT. OR TEST ~ DATE August 5, 1976 Cy PXPUELING Dz PZGULATORY RESTRICTION COMPLETED. BY V T Chilson E: OPEPATOR TRAINING AND LICE:hSE EXAMINATION TELEPHONE (305) 552 3830 Ff ADMINISTRATIVE REPORT MONTH JulY 1976 G: OPERATIONAL ERROR (EXPLAIN) H: OTHER (EXPLAIN) {2) METHOD METHOD OF 1: MM{UAL TYPE SHUTTING DOWN 2 s MANUAL SCRAM FI FORCED DURATION THE REACTOR OR 3: AUTOMATIC SCRAM, NO. DATE Sf SCHEDULED (HOURS) REASON (1) REDUCING POWER{2) CORRECTIVE ACTIONS COMMENTS 4: OTHER {EXPLAIN) Unit was removed from service to repair leak in the 12 76-07-0 29.2 generator hydrogen system. (Non-nuclear System) 13 76-07-0 3.8 3 Reactor was tripped by steam generator level trip during 9': return of unit to power operation after outage. (Non-nuclear System) 14 76-07-0 5.0 Unit was removed from service to investigate and correct problem with turbine control system. (Non-nuclear System) 15 76-07<6 B N/A Load reduction to clean condensate pump suction strainer. (Non-nuclear System) 16 76-07-1 516. 3 F Unit was.removed .from servic~ for reactor tests and inspection. (Nuclear System) sullllhnrhi Ut Lucia Unit No. 1 power Ascension Test program continued until July 10,. 1996 when the ~ft was removed from service for reactor tests and inspection.

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DocKET No. 50 335 DNIT St. Lucie Unit No. 1 DATE Au . 5 1976 COHPLETED BY VS T. Chilson TELEPH0NE 305 552 - 3830 Noma June 1976 (Corrected) DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (WWo-Not) (MWo-Not) 327 17 18 32 19

          . 330                                        20 21           462 22           458 149                                        23           330 316 318                                        25 10           319                                        26           526 322                                       '27           322 12           22                                         28           410 13                                                      29           541 14                                                      30           546 15 16                                                     NOTE      Corrected   - Unit No. '1 was previously reported to be in commercial operation, in error. The unit remained in test status.

APPFNDZX C OPERATING DATA REPORT DOCKET NO. 50 - 335

                                                                                                     =UNIT     St. Lucie Unit No.       1 DATE Aug.      5, 1976 REPORT MONTH                  June 1976  . Corrected)                                    COMPLETED        BY V. T. Chilson 4

TELEPHONE 305 552-4 ~ OPERATING STATUS'-'e REPORTZNG PERIOD: 000 GROSS HOURS 20 REPORTZH PEIIZOD: 720.0 THROUGH 2400 76 0 2, CURRENTLY AUTHORIZED POWER LEVEL (MWt) t 2560 MAX. DEPEND. CAPAC TY (MWe-Net): stimated) DEszcN EI 0 REUAL RATANG IIUle Nee-

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 722
4. REASONS FOR RESTRICTION (ZF ANY) a restriction pending reactor coolant flow analysis"
                                                                                                                 '4 "Temporary 90X THIS    MONTH      )EAR TO DATE CUMULATYV (

5, N(L2(BER OF HOURS REACTOR WAS CRITICAL .. 524.1 1.006.5 1 006.5 6 IIEACTOR IIESERUE SHNZDDAN HOllltS.....,...., ~NA 7, HOURS GENEIIATOR ON LZHE.. ~ ~ ~ ~ ~ ~ ~ ~ "~ . ~26.6

                                                                            ~                        ~02.4 8~   UNIT RESERVE SHUTDOWN HOURS. ..                 ~     ~ ~ ~ ~ ~        ~          N/A(3)             N/A(3).               N/A (3) 9~   GROSS" THER(AL ENERGY GENERATED                       (Ã&).. ~....               750 137      4 1 187     069'           187 069 100   GROSS      ELECTRICAL ENERGY GEANERAT-D (M'8H) ~                          ~      211 690          328 840                328 840 lie   NET ELECTRICAL ENERGY GENERATED (MWH) ~                              ~ ~  .'89        436         291 784                291 784 12    REACTOR SERVICE FACTOR.

13 'EACTOR AVAILABILZTYFACAOR ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

                                                                                 '2    72.8 71.8 8

76-2 76.2 71.8

                                                                                                                          ~6 71.8 14 ~  UNIT SERVICF FACTOR 15 'NIT AVAILABILITYFACTOR.                     ~ ..    ~ ~ ~ ~ ~     . .~              71.8               71.8                 7+8
16. UNZT CAPACITY FACTOR (Using MDC)......... 32:8 28.0 28.0
17. UNIT CAPACITY FACTOR (Using Design MWe) .. ~ 32.8 28.0 28.0 18 'NIT FORCED OUTAGE RATE.P .. ~ ....... ~ ~ 4.2 . 14.6 4

14.6 19 ~ SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF E)2CH): N/A 20 ZF SHUTDOIPI AT EIID OF ItEPORT P RZOD ESTZNli,ZED DATE OP 'STARTUP: 21 UNITS ZN TEST STATUS (PRIOR TO COFAERCZAL OPERATION): FORECAST A HI VE INITZAL CRITICALITY April 22, 1976 IiVITZALELECTRICITY

           ~             COME(ERCIAL OPERATION NOTE:              (1) Corrected  St. Lucie Unit No. 1 was previously reported to be                                    in .commercial operation, in error.         The    unit        remained      in test- status.

(2) Revised values, beginning with initial power generation-to-date. (3) Unit'n test status.

AP1'L'ND1X u DOCKLT HO. 50 335 s (1) REASON UNIT SHUTDOWNS AND POWER REDUCAIONS "'NIT NAME St. Lucie Unit No. 1 A: EQUIPMENT FAILURE (EXPLAIN) l Bg MAINT. OR TEST ~ DATE August 5, 1976 Cs MFUELING DT REGULATORY ASTRICTION coMPLETED. BY V. T. Chilson Et OPERATOR TRAINING AND LICENSE EXAMINATION TELEPHONE (305) - 552 - 3830 F: ADMINISTRATIVE REPORT MONTH June 1976 (Corrected) Gg OPERATIONAL ERROR (EXPLAIN) Hs OTHER (EXPLAIN) (2) METHOD METHOD OF 11 MAHUAL TYPE SHUTTING DOWN 21 MANUAL SCRAM l Ft FORCED DURATION THE REACTOR OR 3 s AUTOMATIC SCRAM NO. DATE ST SCHEDULED (HOURS) REASON (1) REDUCING POWER(2) CORRECTIVE ACTIONS COMENTS 4g OTHER (EXPLAIN) ) 08 76-06-07 10.1 Reactor was manually tripped due to drop of a CEA during the performance of reactor physics tests, (Nuclear System) 09 76-06-1 S, 180.5 B 3 Performing test, generator trip with shutdown outside control room. (Nuclear System) Outage continued for maintenance. (Nuclear and Non-nuclear Systems) 10 76-06-2 12.8 Reactor was,tripped during transient condition caused by closure- of a HSIV when power supply to a vi'tal instrument bus was lost. (Nuclear System) 11 76-06-2 B N/A Load reduction to clean condensate pump suction strainer. (Hon-nuclear System) smemsrc R: St. Annie Unit No. 1 Power Ascension Test Program continued.. NOTE: Corrected -. St. Lucie Unit No. 1 was previously reported to be in commerical operation< in error, The unit was continued in Test Status. e~

               ~ ~

Z ,4 ~, ~}}