Clarifies to NRC Re Survey Monitoring & Tech Spec Surveillance Requirements.Points Out That Many of the Survey Points Differ Re Established Base Line Survey Compared to Bases Stated in Tech Spec.No Safety Implications in Change
ML20064G396
Person / Time
Site: North Anna Dominion icon.png
Issue date: 12/06/1978
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Parr O
Office of Nuclear Reactor Regulation
References
700, NUDOCS 7812110149
Download: ML20064G396 (1)


Text

-. . . - ..

> fo-ssrP  !

VznotxrA ELzcTaxc Awo Powan CourAny l

Rxcunown.VamoxxxA sonst  !

l December 6,1978  ;

i Mr. Harold R. Denton, Director Serial No. 700  !

Office of Nuclear Reactor Regulation PSE&C/CMR,jr. :bep/mc >

Attn: Mr. O. D. Parr, Chief l Light Water Reactors Branch No. 3 Docket No. 50-338 Division of Project Man.agement License No. NPF-4 i

U. S. Nuclear Regulatory Connission Washington, D. C. 20355 l t

Dear Mr. Denton:

f The purpose of this. letter is to further clarify our letter of November 22, 1978, Serial No. 646, concerning survey monitoring and Technical Specification surveillance requirements. Attachment I to that letter contains 27 " problem t survey points." Five of the points relate to the Service Water System in that  !

point 7 is on the Service Water Pump House and points 15,16,17, and 18 are

{ located on the service water piping at the Service Water Pump House. j As explained in our letter, many of the survey points differ with respect I to the established base line survey compared to the bases stated in the Techni- l cal Specification. For instance, Plant Systems Bases 3/4.7.12 states that i

, - "The first survey was conducted in May 1976 to establish a base value for all

points." Points 15, 16, 17, 18 were not established until July 1977, while i point 7 was first established in November 1975. These dates, of course, are j not the same as the May 1976 date stated in the-bases for the Technical Speci- I fication. This situation can be rectified easily with a notation in Table 3.7-5 L or by a change in the bases section of the Technical Specification.  !

I I

! This situation constitutes the totality of the " problem" associated with  ;

Points 7,15,16,17, and 18. There are no safety implications in using dates  ;

for points established in a time frame different from May 1976. t i

A change in the Technical Specification to reflect these other dates has

~

not and would not affect the service water piping, the service water piping  ;

expansion joint, or the service water pump house. None of these systems, or  !

structures associated with these systems, is in any way affected from a safety i standpoint for the type of problem described in this letter. l Very truly yours, f h ?h, y)yun U

~

C. M. Stallings Vice President-Power Supply and Production Operations l i