TXX-3588, Forwards Human Factors Control Room Design Review of Comanche Peak Steam Electric Station, to Resolve SER (NUREG-0797) Open Issue
| ML20070E667 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/15/1982 |
| From: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20070E671 | List: |
| References | |
| RTR-NUREG-0797, RTR-NUREG-797 TXX-3588, NUDOCS 8212170337 | |
| Download: ML20070E667 (1) | |
Text
i TEXAS UTILITIES GENERATING COMPANY Log # TXX-3588 2<xn naux rowen .naum. Texas vs20' Fi1e # 10010 l
=a;$[,L((;b;,;' December 15, 1982 Mr. Harold R. Denton Director of Nuclear Reactor Regulation V. S. Nuclear Regulatory Commission Washington, D.C. 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF THE HUMAN FACTORS CONTROL ROOM DESIGN REVIEW FINAL REPORT REF: (1) NUREG-0797, SAFETY EVALUATION REPORT RELATED TO THE OPERATION OF COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 AND 2
Dear Mr. Denton:
Reference (1) listed the control room design review (item I.D.1) as i an outstanding issue. Reference (1) further states that in order for the NRC staff to complete its evaluation of the Comanche Peak control room, a detailed control room design review must be submitted 120 days before issuance of an Operating License. Texas Utilities Generating Company hereby submits the " Human Factors Control Room Design Review of Comanche Peak Steam Electric Station" to meet this requirement and to respond to this open issue.
Enclosed are 40 copies of this report.
Respectfully submitted, R. . Gary RJG:tls Enclosures b