Forwards Insp Rept 50-409/85-08 on 850624-26.No Noncompliance Noted.Weakness Identified Which Will Need Corrective Action by Util.Weakness Summarized in Encl App
ML20132E511
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 07/16/1985
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20132E515 List:
References
NUDOCS 8508020008
Download: ML20132E511 (3)


See also: IR 05000409/1985008

Text

.. ,

JUL 16 685

Docket No. 50-409

Dairyland Power Cooperative

-ATTN: Mr. F. W. Linder

General Manager

2615 East Avenue - South

La Crosse, WI 54601

Gentlemen:

This refers to the routine safety inspection conducted by Mr. W. Snell and

others of this office on June 24-26, 1985 of activities at the La Crosse Boiling

Water Reactor authorized by NRC Operating Licenses No. DPR-45 and to the

discussion of our findings with Messrs. J. Parkyn, T. Steele and others of

your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective-

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

However, weaknesses were identified which will need corrective action by your

staff. These weaknesses are summarized in the attached Appendix to this

letter. As required by 10 CFR Part 50, Appendix E, IV.F, any weaknesses that

are identified must be corrected.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

-/22;29~+

C. J. Paperiello, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosures:

1. Appendix, Exercise /

Weaknesses

2. Inspection Report

No. 50-409/85008(DRSS)

/[

h

See Attached List For Distribution

8508020008 850716

PDR

G ADOCK 05000409

PDR

_

o ,

Dairyland Power Cooperative 2

JUL 1 61985

Distribution

cc w/ enclosures:

J. Parkyn, Plant Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Section

Ness Flores, Chairperson

Wisconsin Public Service

Cosaission

Spark Burmaster, Coulee

Region Energy Coalition

W. Weaver, FEMA, Region V

D. Matthews, EPB, OIE

NIII RIII RIIIj R

[

M1/,g M1Cen Shi 1,s Be d 1 les1.

07/11/85

.-_ _ _ _ _ . - -

'

.

APPENDIX

EXERCISE WEAKNESSES

1. Initial notifications to the offsite agencies for the Alert and Site

Area Emergency classifications took longer than the 15 minutes specified

in 10 CFR Part 50, Appendix E, IV.D.3. (0 pen Item No. 409/85008-01)

(Section 4.a)

2. The content of the initial notification to the offsite agencies for the

Site Area Emergency did not state whether a release was in progress as

required by the LACBWR Emergency Plan. (0 pen Item No. 409/85008-02)

(Section 4.a)

l

l