ML20133H257
| ML20133H257 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 05/31/1985 |
| From: | Goodenow R, Miltenberger S UNION ELECTRIC CO. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| ULNRC-1110, NUDOCS 8508090262 | |
| Download: ML20133H257 (6) | |
Text
MONTHLY OPERATING REPORT DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT 1 DATE JirNe 10. 19Rs COMPLsTsp BY n n connevow TELEPHONE (114T 676-R460 .
PART A OPERATIONS
SUMMARY
MAY 1985 Callaway operated at 100% power for the month of May except as noted on Part E and a load reduction on May 25. On May 25 the load was reduced to 60% due to 1
problems with ' A' Main Feed Pump and a loss of primary speed signal.
0
- PART B PORV AND SAFETY VALVE
SUMMARY
~
MnNF I
1
( .
l l
i CA-#804 05/09/84 8508090262 850531 QDP-ZZ-04204 d PDR ADOCK 05000483 Page 1 of 4 g/ g 7 \
R PDR 1
t
Part D OPERATING DATA REPORT DOCKET NO.
50-483 UNIT Callaway DATE JUNF 10.1985 COMPLETED 8Y R. R. GOODENOW TELEPHONE (314) 676-8460 OPER ATING STATUS MAY 1985 gross MOURS #N REPORTING PERIOD: 744
- 1. REPORTING PERIOD:
- 2. CURRENTLY AL,THORIZED POWER LEVEL (MWil: 341l MAX. DEPEND. CAPACITY (MWo.Nett: 1120 j
DESIGN ELECTRICAL RATING IMWo Net): 1171* *At stretch reactor power level which is a not currently authorized under the o erating license
- 3. POWER LEVEL TO WHICM RESTRICTED tlP ANY)(MWo.Neti:
- 4. REASONS FOR RESTRICTION (IP ANYl:
THIS MONTM YR TO DATE CUMULATivt 728.8 3241.1 3543.6
- 5. NUMSER OF HOURS REACTOR WAS CRITICAL 0 0 0
- 6. RE ACTOR RESERVE SMUTDOWN MOURS 721.0 3168.7 3471.2 7 7 MOURS GENER ATOR ON LINE 0 0 0 7
, 8. UNaf RESERVE SMUTDOWN *OURS
- 9. GROSS THERMAL ENERGY GENER ATED (MWHI 2.351.261 9.744.671 10.746.196 to GROSS ELECTRICAL ENERGY GENER ATED (MWM) .
800.389 3.301.714 1.640.894 761.511 1.110 qqs 1 Asq 358
- 11. NET ELECTRICAL ENERGY GENERATED IMWM) .
98.0% 89.5% 90.3%
- 12. RE ACTOR SERvlCE F ACTOR j
98.0% 89.5% 90.3%
- 13. REACTOR AV All.ASILITY F ACTOR l
96.9% 87.5% 88.4%
l 14 UNIT SERVICE FACTOR ,.
96.9% 87.5% 88.4%
- 15. UNIT AVAILAslLITY P ACTOR 91.4% 77.1% 78.57 ts. UNIT CAPACITY F ACTOR (Umas MDCI 87.4%* 73.8%* 75.1?*
17 UNif CAPACITY F ACTOR (Umag Demon MWel .
3.1% 4.7% 4.47
. 18. UNIT FORCED OUTAGE RATE , . .
- 19. SHUTDOWNS SCHEDULED OVER NEXT S MONTHS (TYPE OATE. ANO OURAflON OF EACMI: None NA
- 20. IF SMUT DOWN AT END OF REPORT PER100. ESTIMATED OATE OF STARTUF:
CA d804 05/09/84 Page 3 of 4 QDP-ZZ-04204
. . . . . o .
r .
Part E DOCKET NO. 50-483 UNil SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway QATE JUNE 10. 1985 R. R. GOODENOW COMPLETED BY REPORT MONTil MAY 1985 TELEPHONE (314) 676-8460 METHOD OF TYPE SHUTTING DOWN F: FORCED DURAflON THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CCRRECTIVE ACTIONSN5NTS
~
8 850503 Scheduled 0 B 1 Load reduced to 60% due to maintenance on 'B' Main Feed Pump.
9 850506 Forced 23.0 A 3 Reactor Trip from 100% Power due to loss of ' fain Feedwater Pump 'B.'
LER's 85-024-00 and 85-025-00.
SUMMARY
CA-#804
' 05/09/84 Page 4 of 4 QDP-ZZ-04204
I Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-483 -
UNIT Callaway DATE JUNE 10.1985 COMPLETED BY R. R. GOODENOW TELEPHONE (314) 676-8460 I
MONTH MAY 1985 l
a DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) l 1 1105 37 1113 1110 jg 1115 2
1108 3, 1111 3
4 776 20 1108
' 881 1108 5 21 878 1112 6 3 0 1112 7
562 1108 3 24 1024 1071 9
1109 1077 10 26 1102 1107 33 1107 g 1112 12 1110 1106 33 3 14 1109 3 1075 1111 1086 15 31 1112 f 16 l
l 0[ 64 Page 2 of 4 QDP-ZZ-04204
9 l UNION EtscTaic COMPANY CALLAWAY PLANT MAILING ADDRESS:
P. O. sox S20 FULTON. MO. 6 52 SI June 12, 1985 i
Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1110
Dear Sir:
! DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1
, FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT MAY 1985 The enclosed Monthly Operating Report for May 1985 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
l f OC e S. E. Miltenberger Manager, Callaway Plant A/C-d%P ET/WRC/RRG/drs Enclosure cc: Distribution attached
- rE14
'l . _
cc distribution for ULNRC-1110 with enclosures Mr. James G. Keppler Regional Administrator Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector I
i l
i s
_, ._