RIS 2020-01 Palo Verde Nuclear Generating Station 102-08137-MEK/LMW P.O. Box 52034 Phoenix, AZ 85072 July 17, 2020 Mail Station 7636 Tel: 623-393-5379 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
Dear Sir:
Reference:
NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations (February 19, 2020) [ML19357A038]
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Response to Regulatory Issue Summary (RIS) 2020-01, Preparation and Scheduling of Operator Licensing Examinations This letter provides Arizona Public Service Companys voluntary response to RIS 2020-01, Preparation and Scheduling of Operator Licensing Examinations. Enclosed with this letter is NRC Form 536, which provides the proposed schedule of operator licensing examinations at PVNGS for calendar years 2022 through 2025.
No commitments are being made to the NRC by this letter.
If you have any questions or require additional information, please contact Jarred J.
Shaver, Nuclear Training Section Leader, at (623) 393-4519.
Sincerely, Digitally signed by Kura, Kura, Matthew Matthew E(Z04774)
DN: cn=Kura, Matthew E(Z04774) E(Z04774)
Date: 2020.07.17 12:57:23 -07'00' Matthew E. Kura Department Leader, Regulatory Affairs, Compliance MEK/LMW
Enclosure:
NRC Form 536, Operator Licensing Examination Data cc: G. E. Werner NRC Region IV, Chief, Operations Branch C. C. Osterholtz NRC Region IV, Chief Examiner J. A. Bridges NRC Region IV, Licensing Assistant, Operations Branch C. A. Peabody NRC Senior Resident Inspector for PVNGS A member of STARS Alliance LLC Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek
Enclosure NRC Form 536 Operator Licensing Examination Data
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear EXAMINATION DATA Regulatory Commission, Washington, DC20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Palo Verde Nuclear Generating Station IV 50-528, 50-529, 50-530 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2022 CY 2023 CY 2024 CY 2025 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2022 CY 2023 CY 2024 CY 2025 NUMBER OF REACTOR OPERATORS 10 10 10 10 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 1 1 1 1 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 5 5 5 5 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 5/2/2022 5/1/2023 4/29/2024 4/28/2025 ALTERNATE DATE NRC FORM 536 (11-2017)