1CAN069806, Forwards SG Tubing ISI Rept for Ano,Unit 1 Fourteenth Refueling Outage.Rept Suppls Info Provided to NRC by ,Which Was Required to Be Submitted Per TS 4.18.6 & 6.12.5 as Result of C-3 Insp Results

From kanterella
Revision as of 03:02, 21 July 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards SG Tubing ISI Rept for Ano,Unit 1 Fourteenth Refueling Outage.Rept Suppls Info Provided to NRC by ,Which Was Required to Be Submitted Per TS 4.18.6 & 6.12.5 as Result of C-3 Insp Results
ML20249B507
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 06/15/1998
From: James D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20249B508 List:
References
1CAN069806, 1CAN69806, NUDOCS 9806230238
Download: ML20249B507 (2)


Text

- - _ - _ . _ _ - - _ _ _ _ _ _ _ - - _ _ _ _ _ _ - - - _ _ _ .

i y Entergy Operations,Inc.

N 1448 SR 333 Rur,sc6vWe, AR 72801 Tel 501858-5000 l

June 15,1998 ICAN069806 l

U. S. Nuclear Regulatory Commission Document Control Desk Mail Station OPI-17 Washington, DC 20555 l

Subject:

Arkansas Nuclear One- Unit 1 Docket No. 50-313 License No. DPR-51 f Once Through Steam Generator Inservice Inspection Report 1

Gentlemen:

l Arkansas Nuclear One, Unit 1 (ANO-1), Technical Specification 4.18.6 requires the complete results of each inservice inspection of the once through steam generator (OTSG) tubes to be ,

submitted to the NRC within 45 days of the completion of the inspection. Attached is the 1 i

Steam Generator Tubing Inservice Inspection Report for the ANO-1 fourteenth refueling outage (IR14). The OTSG tube inspections were completed on April 30,1998.

i i l The full length tube inspections of both the "A" and "B" OTSGs had Category C-3 results.

The attached report supplements the information provided to the NRC by letter dated May 1,1998 (ICAN059802), which was required to be submitted per ANO-1 Technical j Speci5 cations 4.18.6 and 6.12.5 as a result of the C-3 inspection results. The complete results I of the inspections are included in the attehment.

Should you have any questions concerning this submittal, please contact me.

l 4

. . s..

j$\ OOk g G,

9906230238 990615 PDR ADOCK 05000313 G PDR I

U. S. NRC June 15,1998 1CAN069806 Page 2 Very truly yours,

/,

ale ames Acti irector, Nuclear Safety DEJ6jd attachment cc: Mr. Ellis W. Merschoff Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 Mr. William D. Reckley NRR Project Manager Region IV/ANO-1 & 2 U. S. Nuclear Regulatory Commission NRR Mail Stop 13-H-3 One White Flint North 11555 Rockville Pike Rockville, MD 20852

- _ _ _ _ _ _ _ _ _ _