NL-22-0062, Supplement to License Amendment Request: Revise Technical Specifications to Adopt TSTF-227 & TSTF-297

From kanterella
Revision as of 18:55, 18 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Supplement to License Amendment Request: Revise Technical Specifications to Adopt TSTF-227 & TSTF-297
ML22033A073
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/01/2022
From: Gayheart C
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-22-0062
Download: ML22033A073 (28)


Text

Cheryl A. Gayheart 3535 Colonnade Parkway Regulatory Affairs Director Birmingham, AL 35243 205 992 5316

cagayhea@southernco.com

February 1, 2022 NL-22-0062

Docket Nos. 50-321 50-366

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001

Edwin I. Hatch Nuclear Plant - Units 1 and 2 Supplement to License Amendment Request: Revi se Technical Specifications to Adopt TSTF-227, Revision to EOC-RPT Pump Actions and TSTF-297, Enhancements to Required Actions for Feedwater and Main Turbine High Water Level Trip Instrumentation, EOC-RPT Instrumentation, and ATWS-RPT Instrumentation

On December 13, 2021, pursuant to 10 CFR 50.90, Southern Nuclear Operating Company (SNC) requested a license amendment to Edwin I. Hatch Nuclear Plant (HNP) Unit 1 Renewed Facility Operating License DPR-57 and Unit 2 Renewed Facility Operating License NPF-5 (ADAMS Accession Number ML21347A385). The pr oposed amendment requested adoption of TSTF-227, Revision 0, involving clarification to the End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation Technical Specifications (TS), and TSTF-297, Revision 1, involving enhancements to Feedwater and Main Turbine High Water Level Trip, EOC-RPT, and Anticipated Transient Without Scram (ATWS)-RPT TS.

Subsequent to the submittal, SNC identified the need for editorial corrections not affecting technical content as described in Enclosure 1 of this letter.

SNC requests the same approval and implementation schedule as requested in its original application. The conclusions of the No Significant Hazards Consideration Determination and Environmental Consideration contained in the orig inal application have been reviewed and are unaffected by this supplement.

This letter contains no regulatory commitments.

If you should have any questions regarding this submittal, please contact Ryan Joyce at 205.992.6468.

U.S. Nuclear Regulatory Commission NL-22-0062 Page 2

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 1st day of February 2022.

Respectfully submitted,

Cheryl A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Company

CAG/tle

Enclosure:

Editorial Corrections - Description, Corrections, and Assessment

Attachments: 1. Revised Proposed Technical Specifications Changes (Mark-Up)

2. Revised Technical Specifications Pages

cc: Regional Administrator, Region II NRR Project Manager - Hatch Senior Resident Inspector - Hatch Director, Environmental Protection Division - State of Georgia RType: CHA02.004 Edwin I. Hatch Nuclear Plant - Units 1 and 2

Supplement to License Amendment Request: Revise Technical Specifications to Adopt TSTF-227, Revision to EOC-RPT Pump Actions and TSTF-297, Enhancements to Required Actions for Feedwater and Main Turbine High Water Level Trip Instrumentation, EOC-RPT Instrumentation, and ATWS-RPT Instrumentation

Enclosure

Editorial Corrections - Description, Corrections, and Assessment Enclosure to NL-22-0062 Editorial Corrections - Description, Corrections, and Assessment

=

Background===

On December 13, 2021, pursuant to 10 CFR 50.90, Southern Nuclear Operating Company (SNC) requested a license amendment to Edwin I. Hatch Nuclear Plant (HNP) Unit 1 Renewed Facility Operating License DPR-57 and Unit 2 Renewed Facility Operating License NPF-5 (ADAMS Accession Number ML21347A385). The proposed amendment requested adoption of TSTF-227, Revision 0, involving clarification to the End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation Technical Specifications (TS), and TSTF-297, Revision 1, involving enhancements to Feedwater and Main Turbine High Water Level Trip, EOC-RPT, and Anticipated Transient Without Scram (ATWS)-RPT TS.

Subsequent to the submittal, SNC identified the need to editorially correct certain non-technical aspects of the request. The table below identifies provides a description of each issue as well as corrections to the original request and an assessment of each correction. Each correction has been assessed to be of an editorial nature and none impact the technical or regulatory basis for the Technical Specifications changes requested in the original submittal, dated December 13, 2021.

to this Enclosure provides the marked-up pages for HNP Units 1 and 2. provides revised (clean) TS pages. These pages have incorporated changes that address the editorial corrections described in the table below. Note that all HNP TS pages that were included in the original submittal are included in Attachments 1 and 2; this includes the pages corrected in this supplement as well as the pages that are unchanged by this supplement. All pages are included for clarity and convenience as this provides all marked-up and clean pages in a single submittal. Therefore, Attachments 1 and 2 of this Enclosure replace, in their entirety, Attachments 1 and 2, respecti vely, of the December 13, 2021, submittal.

Description Correction to Original Assessment Request

The acronym EOC-RPT is Please consider End of Cycle It is noted the acronym is spelled out as End of Cycle Reactor Pump Trip to read correctly spelled out in the Reactor Pump Trip in two End of Cycle Recirculation majority of instances in the locations (first paragraph of Pump Trip in the two original amendment request.

the cover letter and page E7 locations identified. This is a typographical of the Enclosure of the correction.

original request). It should appear as End of Cycle Recirculation Pump Trip in both locations.

E-1 Enclosure to NL-22-0062 Editorial Corrections - Description, Corrections, and Assessment

Description Correction to Original Assessment Request

In the Enclosure of the original Please consider Section 4.1, As stated in the original request, Section 4.1, 10 CFR 50.36, Technical request, TS 3.3.4.2, Anticipated Applicable Regulatory specifications, Item (D), of the Transient Without Scram Requirements, 10 CFR original request to read: Recirculation Pump Trip 50.36(c)(2)(ii)(D), Criterion 4 is (D) Criterion 4. A (ATWS-RPT) Instrumentation, misquoted. structure, system, or satisfies Criterion 4 of 10 CFR component which 50.36(c)(2)(ii).

operating experience or Although incorrect regulation probabilistic risk text was cited, the appropriate assessment has shown regulatory criterion was to be significant to public addressed in support of the health and safety. regulatory analysis of the proposed changes to the TS.

Therefore, this editorial correction does not impact the technical or regulatory basis for the proposed changes to the HNP TS.

In the Enclosure of the original In Section 4.1, 10 CFR 50.62, Although the incorrect request, Section 4.1, Requirements for reduction of regulation number was cited, Applicable Regulatory risk from anticipated transients the appropriate regulatory Requirements, a paragraph without scram (ATWS) events requirement was addressed in addressing the requirements of for light-water-cooled nuclear support of the regulatory 10 CFR 50.62, Requirements power plants, please consider analysis of the proposed for reduction of risk from 10 CFR 50.36(c)(5) to read changes to the TS. Therefore, anticipated transients without 10 CFR 50.62(c)(5) in both this editorial correction does scram (ATWS) events for light-locations. not impact the technical or water-cooled nuclear power regulatory basis for the plants, erroneously cited proposed changes to the HNP 10 CFR 50.36(c)(5). The TS.

paragraph should cite 10 CFR 50.62(c)(5).

E-2

Enclosure to NL-22-0062 Editorial Corrections - Description, Corrections, and Assessment

Description Correction to Original Assessment Request

In the Attachments of the Attachment 1 to this submittal The HNP Unit 1, TS 3.3.4.2, original request, the markups provides the affected TS pages Required Action D.1 Note is and clean-typed pages for HNP revised to correctly show the corrected to be consistent with Unit 1, TS 3.3.4.2, Note for HNP TS 3.3.4.2, Required the TSTF-297 proposed Required Action D.1 did not Action D.1 Note, i.e., the wording.

match the TSTF-297 proposed previously omitted word This is a typographical wording. The TSTF-297 inoperable is included in the correction.

proposed wording, as well as Note. For convenience, the wording proposed in Attachments 1 and 2 contain all Section 2.3 of the Enclosure of the TS pages included in the the original request, read Only original request.

applicable if inoperable channel is the result of an inoperable RPT breaker. In the Attachments of the original request, the second instance of the word inoperable was inadvertently omitted from the Required Action D.1 Note.

In the Attachments of the Attachment 1 to this submittal The addition of the word an original request, the markups provides the affected TS does not change the intent of and clean-typed pages for pages revised to correctly the Note but is a grammatical HNP Unit 1 and Unit 2, TS show the HNP Unit 1 and Unit improvement.

3.3.2.2 Note for Required 2, TS 3.3.2.2 Note for This is a typographical Action C.1 did not match the Required Action C.1, i.e., the correction.

wording proposed in Section previously omitted word an 2.3 of the Enclosure of the is included in the Note. For original request. Specifically, convenience, Attachments 1 the markups and clean-typed and 2 contain all the TS pages for TS 3.3.2.2 omitted pages included in the original the word an in the Note for request.

Required Action C.1.

E-3

Edwin I. Hatch Nuclear Plant - Units 1 and 2

Supplement to License Amendment Request: Revise Technical Specifications to Adopt TSTF-227, Revision to EOC-RPT Pump Actions and TSTF-297, Enhancements to Required Actions for Feedwater and Main Turbine High Water Level Trip Instrumentation, EOC-RPT Instrumentation, and ATWS-RPT Instrumentation

Attachment 1

Revised Proposed Changes (Mark-Up)

Feedwater and Main Turbine Trip High Water Level Instrumentation 3.3.2.2

3.3 INSTRUMENTATION

3.3.2.2 Feedwater and Main Turbine Trip High Water Level Instrumentation

LCO 3.3.2.2 Three channels of feedwater and main turbine trip instrumentation shall be OPERABLE.

APPLICABILITY: 7+(50$/32:(5 % RTP.

ACTIONS


NOTE------------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME

A. One feedwater and main A.1 Place channel in trip. 7 days turbine high water level trip channel inoperable.

B. Two or more feedwater and B.1 Restore feedwater and 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> main turbine high water main turbine high water level trip channels level trip capability.

inoperable.

C. Required Action and C.1 -----------NOTE-----------

associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable feedwater pump valve or main turbine stop valve.

Remove affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> feedwater pump(s) and main turbine valve(s) from service.

OR C.2 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> POWER to < 24% RTP.

HATCH UNIT 1 3.3-21 Amendment No. 266 EOC-RPT Instrumentation 3.3.4.1

3.3 INSTRUMENTATION

3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation

LCO 3.3.4.1 a. Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:

1. Turbine Stop Valve (TSV) - Closure; and
2. Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure - Low.

OR

b. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for inoperable EOC-RPT as specified in the COLR are made applicable.

APPLICABILITY: THERMAL 32:(5 573

ACTIONS


NOTE------------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME

A. One or more required A.1 Restore channel to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> channels inoperable. OPERABLE status.

OR

A.2 -----------NOTE------------

Not applicable if inoperable channel is the result of an inoperable breaker.

Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

(continued)

HATCH UNIT 1 3.3-28 Amendment No. 266 EOC-RPT Instrumentation 3.3.4.1

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

B. One or more Functions with B.1 Restore EOC-RPT trip 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> EOC-RPT trip capability not capability.

maintained.

OR AND B.2 Apply the MCPR limit 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> MCPR limit for inoperable for inoperable EOC-RPT not made EOC-RPT as specified applicable. in the COLR.

C. Required Action and C.1 -----------NOTE------------

associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable RPT breaker.

Remove the associated 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> affected recirculation pump from service.

OR

C.2 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> POWER to < 27.6%

RTP.

SURVEILLANCE REQUIREMENTS


NOTE------------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains EOC-RPT trip capability.

SURVEILLANCE FREQUENCY

SR 3.3.4.1.1 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program

(continued)

HATCH UNIT 1 3.3-29 Amendment No. 266 ATWS-RPT Instrumentation 3.3.4.2

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

C. Both Functions with C.1 Restore ATWS-RPT trip 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ATWS-RPT trip capability capability for one not maintained. Function.

D. Required Action and D.1 -----------NOTE------------

associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable RPT breaker.

Remove the associated 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> affected recirculation pump from service.

OR

D.2 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />

SURVEILLANCE REQUIREMENTS


NOTE------------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains ATWS-RPT trip capability.

SURVEILLANCE FREQUENCY

SR 3.3.4.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program

(continued)

HATCH UNIT 1 3.3-32 Amendment No. 266 Feedwater and Main Turbine Trip High Water Level Instrumentation 3.3.2.2

3.3 INSTRUMENTATION

3.3.2.2 Feedwater and Main Turbine Trip High Water Level Instrumentation

LCO 3.3.2.2 Three channels of feedwater and main turbine trip instrumentation shall be OPERABLE.

APPLICABILITY: 7+(50$/32:(5 24% RTP.

ACTIONS


NOTE------------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME

A. One feedwater and main A.1 Place channel in trip. 7 days turbine high water level trip channel inoperable.

B. Two or more feedwater and B.1 Restore feedwater and 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> main turbine high water main turbine high water level trip channels level trip capability.

inoperable.

C. Required Action and C.1 ------------NOTE-----------

associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable feedwater pump valve or main turbine stop valve.

Remove affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> feedwater pump(s) and main turbine valve(s) from service.

OR

C.2 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> POWER to < 24% RTP.

HATCH UNIT 2 3.3-21 Amendment No. 210 EOC-RPT Instrumentation 3.3.4.1

3.3 INSTRUMENTATION

3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation

LCO 3.3.4.1 a. Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:

1. Turbine Stop Valve (TSV) - Closure; and
2. Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure - Low.

OR

b. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for inoperable EOC-RPT as specified in the COLR are made applicable.

APPLICABILITY: 7+(50$/32:(5 27.6% RTP.

ACTIONS


NOTE----------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME

A. One or more required A.1 Restore channel to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> channels inoperable. OPERABLE status.

OR

A.2 ------------NOTE-----------

Not applicable if inoperable channel is the result of an inoperable breaker.

Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

(continued)

HATCH UNIT 2 3.3-28 Amendment No. 210 EOC-RPT Instrumentation 3.3.4.1

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

B. One or more Functions with B.1 Restore EOC-RPT trip 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> EOC-RPT trip capability not capability.

maintained.

OR AND B.2 Apply the MCPR limit 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> MCPR limit for inoperable for inoperable EOC-RPT not made EOC-RPT as specified applicable. in the COLR.

C. Required Action and C.1 -----------NOTE------------

associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable RPT breaker.

Remove the associated 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> affected recirculation pump from service.

OR

C.2 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> POWER to < 27.6%

RTP.

SURVEILLANCE REQUIREMENTS


NOTE----------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains EOC-RPT trip capability.

SURVEILLANCE FREQUENCY

SR 3.3.4.1.1 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program

(continued)

HATCH UNIT 2 3.3-29 Amendment No. 210 ATWS-RPT Instrumentation 3.3.4.2

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

C. Both Functions with C.1 Restore ATWS-RPT trip 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ATWS-RPT trip capability capability for one not maintained. Function.

D. Required Action and D.1 -----------NOTE------------

associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable RPT breaker.

Remove the associated 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> affected recirculation pump from service.

OR

D.2 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />

SURVEILLANCE REQUIREMENTS


NOTE----------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains ATWS-RPT trip capability.

SURVEILLANCE FREQUENCY

SR 3.3.4.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program

(continued)

HATCH UNIT 2 3.3-32 Amendment No. 210 Edwin I. Hatch Nuclear Plant - Units 1 and 2

Supplement to License Amendment Request: Revise Technical Specifications to Adopt TSTF-227, Revision to EOC-RPT Pump Actions and TSTF-297, Enhancements to Required Actions for Feedwater and Main Turbine High Water Level Trip Instrumentation, EOC-RPT Instrumentation, and ATWS-RPT Instrumentation

Attachment 2

Revised Technical Specifications Pages Feedwater and Main Turbine Trip High Water Level Instrumentation 3.3.2.2

3.3 INSTRUMENTATION

3.3.2.2 Feedwater and Main Turbine Trip High Water Level Instrumentation

LCO 3.3.2.2 Three channels of feedwater and main turbine trip instrumentation shall be OPERABLE.

APPLICABILITY: 7+(50$/32:(5 % RTP.

ACTIONS


NOTE------------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME

A. One feedwater and main A.1 Place channel in trip. 7 days turbine high water level trip channel inoperable.

B. Two or more feedwater and B.1 Restore feedwater and 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> main turbine high water main turbine high water level trip channels level trip capability.

inoperable.

C. Required Action and C.1 -----------NOTE-----------

associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable feedwater pump valve or main turbine stop valve.

Remove affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> feedwater pump(s) and main turbine valve(s) from service.

OR C.2 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> POWER to < 24% RTP.

HATCH UNIT 1 3.3-21 Amendment No.

EOC-RPT Instrumentation 3.3.4.1

3.3 INSTRUMENTATION

3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation

LCO 3.3.4.1 a. Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:

1. Turbine Stop Valve (TSV) - Closure; and
2. Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure - Low.

OR

b. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for inoperable EOC-RPT as specified in the COLR are made applicable.

APPLICABILITY: 7+(50$/32:(5 573

ACTIONS


NOTE------------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME

A. One or more required A.1 Restore channel to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> channels inoperable. OPERABLE status.

OR

A.2 -----------NOTE------------

Not applicable if inoperable channel is the result of an inoperable breaker.

Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

(continued)

HATCH UNIT 1 3.3-28 Amendment No.

EOC-RPT Instrumentation 3.3.4.1

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

B. One or more Functions with B.1 Restore EOC-RPT trip 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> EOC-RPT trip capability not capability.

maintained.

OR AND B.2 Apply the MCPR limit 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> MCPR limit for inoperable for inoperable EOC-RPT not made EOC-RPT as specified applicable. in the COLR.

C. Required Action and C.1 -----------NOTE------------

associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable RPT breaker.

Remove the affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> recirculation pump from service.

OR

C.2 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> POWER to < 27.6%

RTP.

SURVEILLANCE REQUIREMENTS


NOTE------------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains EOC-RPT trip capability.

SURVEILLANCE FREQUENCY

SR 3.3.4.1.1 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program

(continued)

HATCH UNIT 1 3.3-29 Amendment No.

EOC-RPT Instrumentation 3.3.4.1

SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY

SR 3.3.4.1.2 Verify TSV - Closure and TCV Fast Closure, Trip In accordance with Oil Pressure - Low Functions are not bypassed the Surveillance ZKHQ7+(50$/32:(5LV 573 Frequency Control Program

SR 3.3.4.1.3 Perform CHANNEL CALIBRATION. The In accordance with Allowable Values shall be: the Surveillance Frequency Control TSV - &ORVXUH  FORVHG DQG Program

TCV Fast Closure, Trip Oil Pressure - /RZ  SVLJ

SR 3.3.4.1.4 Perform LOGIC SYSTEM FUNCTIONAL TEST In accordance with including breaker actuation. the Surveillance Frequency Control Program

SR 3.3.4.1.5 ---------------------------NOTE------------------------------

Breaker interruption time may be assumed from the most recent performance of SR 3.3.4.1.6.

Verify the EOC-RPT SYSTEM RESPONSE TIME In accordance with is within limits. the Surveillance Frequency Control Program

SR 3.3.4.1.6 Determine RPT breaker interruption time. In accordance with the Surveillance Frequency Control Program

HATCH UNIT 1 3.3-30 Amendment No.

ATWS-RPT Instrumentation 3.3.4.2

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

C. Both Functions with C.1 Restore ATWS-RPT trip 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ATWS-RPT trip capability capability for one not maintained. Function.

D. Required Action and D.1 -----------NOTE------------

associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable RPT breaker.

Remove the affected 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> recirculation pump from service.

OR

D.2 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />

SURVEILLANCE REQUIREMENTS


NOTE------------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains ATWS-RPT trip capability.

SURVEILLANCE FREQUENCY

SR 3.3.4.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program

(continued)

HATCH UNIT 1 3.3-32 Amendment No.

ATWS-RPT Instrumentation 3.3.4.2

SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY

SR 3.3.4.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program

SR 3.3.4.2.3 Perform CHANNEL CALIBRATION. The In accordance with Allowable Values shall be: the Surveillance Frequency Control

a. Reactor Vessel Water Level - Program ATWS-537/HYHO -73 inches; and
b. Reactor Steam Dome Pressure -

+LJK  SVLJ

SR 3.3.4.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST In accordance with including breaker actuation. the Surveillance Frequency Control Program

HATCH UNIT 1 3.3-33 Amendment No.

Feedwater and Main Turbine Trip High Water Level Instrumentation 3.3.2.2

3.3 INSTRUMENTATION

3.3.2.2 Feedwater and Main Turbine Trip High Water Level Instrumentation

LCO 3.3.2.2 Three channels of feedwater and main turbine trip instrumentation shall be OPERABLE.

APPLICABILITY: 7+(50$/32:(5 24% RTP.

ACTIONS


NOTE------------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME

A. One feedwater and main A.1 Place channel in trip. 7 days turbine high water level trip channel inoperable.

B. Two or more feedwater and B.1 Restore feedwater and 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> main turbine high water main turbine high water level trip channels level trip capability.

inoperable.

C. Required Action and C.1 ------------NOTE-----------

associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable feedwater pump valve or main turbine stop valve.

Remove affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> feedwater pump(s) and main turbine valve(s) from service.

OR

C.2 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> POWER to < 24% RTP.

HATCH UNIT 2 3.3-21 Amendment No.

EOC-RPT Instrumentation 3.3.4.1

3.3 INSTRUMENTATION

3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation

LCO 3.3.4.1 a. Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:

1. Turbine Stop Valve (TSV) - Closure; and
2. Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure - Low.

OR

b. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for inoperable EOC-RPT as specified in the COLR are made applicable.

APPLICABILITY: 7+(50$/32:(5 27.6% RTP.

ACTIONS


NOTE----------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME

A. One or more required A.1 Restore channel to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> channels inoperable. OPERABLE status.

OR

A.2 ------------NOTE-----------

Not applicable if inoperable channel is the result of an inoperable breaker.

Place channel in trip. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />

(continued)

HATCH UNIT 2 3.3-28 Amendment No.

EOC-RPT Instrumentation 3.3.4.1

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

B. One or more Functions with B.1 Restore EOC-RPT trip 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> EOC-RPT trip capability not capability.

maintained.

OR AND B.2 Apply the MCPR limit 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> MCPR limit for inoperable for inoperable EOC-RPT not made EOC-RPT as specified applicable. in the COLR.

C. Required Action and C.1 -----------NOTE------------

associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable RPT breaker.

Remove the affected 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> recirculation pump from service.

OR

C.2 Reduce THERMAL 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> POWER to < 27.6%

RTP.

SURVEILLANCE REQUIREMENTS


NOTE----------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains EOC-RPT trip capability.

SURVEILLANCE FREQUENCY

SR 3.3.4.1.1 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program

(continued)

HATCH UNIT 2 3.3-29 Amendment No.

EOC-RPT Instrumentation 3.3.4.1

SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY

SR 3.3.4.1.2 Verify TSV - Closure and TCV Fast Closure, Trip In accordance with Oil Pressure - Low Functions are not bypassed the Surveillance ZKHQ7+(50$/32:(5LV 27.6% RTP. Frequency Control Program

SR 3.3.4.1.3 Perform CHANNEL CALIBRATION. The In accordance with Allowable Values shall be: the Surveillance Frequency Control TSV - &ORVXUH  10% closed; and Program

TCV Fast Closure, Trip Oil Pressure - /RZ  600 psig.

SR 3.3.4.1.4 Perform LOGIC SYSTEM FUNCTIONAL TEST In accordance with including breaker actuation. the Surveillance Frequency Control Program

SR 3.3.4.1.5 ---------------------------NOTE-------------------------------

Breaker interruption time may be assumed from the most recent performance of SR 3.3.4.1.6.

Verify the EOC-RPT SYSTEM RESPONSE TIME In accordance with is within limits. the Surveillance Frequency Control Program

SR 3.3.4.1.6 Determine RPT breaker interruption time. In accordance with the Surveillance Frequency Control Program

HATCH UNIT 2 3.3-30 Amendment No.

ATWS-RPT Instrumentation 3.3.4.2

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME

C. Both Functions with C.1 Restore ATWS-RPT trip 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ATWS-RPT trip capability capability for one not maintained. Function.

D. Required Action and D.1 -----------NOTE------------

associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable RPT breaker.

Remove the affected 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> recirculation pump from service.

OR

D.2 Be in MODE 2. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />

SURVEILLANCE REQUIREMENTS


NOTE----------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains ATWS-RPT trip capability.

SURVEILLANCE FREQUENCY

SR 3.3.4.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program

(continued)

HATCH UNIT 2 3.3-32 Amendment No.

ATWS-RPT Instrumentation 3.3.4.2

SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY

SR 3.3.4.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program

SR 3.3.4.2.3 Perform CHANNEL CALIBRATION. The In accordance with Allowable Values shall be: the Surveillance Frequency Control

a. Reactor Vessel Water Level - Program ATWS-537/HYHO  -73 inches; and
b. Reactor Steam Dome Pressure -

+LJK  1175 psig.

SR 3.3.4.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST In accordance with including breaker actuation. the Surveillance Frequency Control Program

HATCH UNIT 2 3.3-33 Amendment No.