ML24187A117
ML24187A117 | |
Person / Time | |
---|---|
Site: | Kemmerer File:TerraPower icon.png |
Issue date: | 07/15/2024 |
From: | Joshua Borromeo NRC/NRR/DANU/UAL1 |
To: | George Wilson TerraPower |
References | |
EPID L-2024-CPS-0000 | |
Download: ML24187A117 (1) | |
Text
US SFR OWNER, LLC - PLAN FOR A GENERAL AUDIT OF THE KEMMERER UNIT 1 CONSTRUCTION PERMIT APPLICATION (EPID NO. L-2024 -CPS -0000)
Applicant: US SFR Owner, LLC
Applicant Address: 15800 Northup Way Bellevue, WA 98008
Plant Name and Units: Kemmerer Power Station Unit 1
Docket No.: 50-613
=
Background===
By letter dated March 28, 2024, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML24088A060) TerraPower, LLC (TerraPower), on behalf of its wholly -
owned subsidiary US SFR Owner, LLC (USO), submitted a construction permit (CP) application and corresponding preliminary safety analysis report (PSAR) to the U.S. Nuclear Regulatory Commission (NRC) staff for a reactor facility pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Domestic Licensing of Production and Utilization Facilities, and section 103 of the Atomic Energy Act of 1954, as amended. The facility, referred to as Kemmerer Power Station Unit 1 (Kemmerer 1), would be built in Lincoln County, Wy . On May 21, 2024 (ML24135A109), the NRC staff accepted USOs CP application for docketing. A notice of the acceptance for docketing was published in the Federal Register on June 4, 2024 (89 FR 47997). The NRC staff is conducting a detailed review of the Kemmerer 1 CP application. This regulatory audit is intended to assist the NRC staff in its review of the Kemmerer 1 CP application.
Purpose
The purpose of this audit is for the NRC staff to gain a better understanding of the Kemmerer 1 CP application by providing an opportunity to review and discuss the material used to support statements or conclusions in the PSAR. The audit is expected to facilitate a more effective and efficient review by allowing the NRC staff to review and discuss the supporting material with the objective of improving communication and eliminating unnecessary requests for additional information. The NRC staff plans to audit material which may be needed to make a reasonable assurance finding that the preliminary design protects public health and safety. If the NRC staff identifies information that is needed to support a finding, USO will need to submit that information on the application docket(s).
- 2 -
Regulatory Audit Basis
The basis for the audit are the regulations in 10CFR pertinent to the NRC staffs review of the CP application, including 10 CFR 50.34, Contents of applications; technical information, 10 CFR 50.35, Issuance of construction permits , 10 CFR 100.10, Factors to be considered when evaluating sites, and 10 CFR 100.11, Determination of exclusion area, low population zone, and population center distance.
Regulatory Audit Scope
This audit will focus on information provided by USO on the electronic reading room (eRR) and during meetings and interactions with USO. This audit will provide the NRC staff with information related to the review of the Kemmerer 1 CP application. Specific objectives and topics to be discussed will be identified in subsequent correspondence, such as an email, and dates will be proposed for discussion of the information.
Information and Other Material Necessary for the Regulatory Audit
USO should be prepared to provide documents, reports, calculations, computer code verification, and other material, as applicable, supporting the analyses documented in the PSAR. The NRC staff may request that USO make these additional materials available on the eRR or during a site visit if one is conducted. Initial information requests and discussion items are identified in the enclosed table. Additional requests will be provided during the remainder of the audit.
Team Assignments
Mallecia Sutton Senior ( Sr.) Project Manager, Audit Lead Reed Anzalone Sr. Reactor Systems Engineer, L ead Reviewer Stephanie Devlin-Gill Sr. Project Manager, A udit Support Roel Brusselmans Project Manager, Audit Support Deion Atkinson Project Manager, Audit Support
Additional audit team members will be added, as needed.
Logistics
Entrance Meeting: July 23, 2024, at 2:00 PM ET
Exit Meeting: January 2025, precise date, and time are to be determined.
The audit will follow the guidance in the Office of Nuclear Reactor Regulations (NRR) Office Instruction LIC-111, Revision 1, Regulatory Audits, (ML19226A274). Audit meetings will take place in a virtual format, using Microsoft Teams or other similar platform. Audit meetings will be scheduled on an as needed basis and, if applicable, once the NRC staff has had the opportunity to review documents placed on the eRR. If a site visit is needed, review topics will be provided to USO, and mutually agreeable dates will be established. The audit will begin July 2024, and continue for approximately 6 months, with activities occurring intermittently during that period.
Interim status report(s ) on topics being addressed by the audit will be provided to USO .
- 3 -
The audit period may be reduced or extended, depending on the progress made by the NRC staff and USO in addressing audit questions. Additional audit activities may be planned as necessary to support the NRC staffs understanding of information needed to complete the review of the Kemmerer 1 CP application.
To improve the efficiency of the audit, USO and the NRC staff discussed the use of the eRR, established by TerraPower, that would allow the NRC staff read-only access to the technical information provided by USO. Use of the eRR is acceptable provided that USO establishes measures to limit access to specific NRC staff (e.g., based on NRC email addresses or the use of passwords which will only be assigned to the NRC staff directly involved in the audit on a need-to-know basis), and to make the documents view -only (i.e., prevent NRC staff from saving, copying, downloading, or printing any documents). The conditions associated with the eRR must be maintained throughout the audi t process. The NRC audit project managers will provide USO with the names of the NRC staff audit team that will require access to the eRR.
Special Requests
None.
Deliverables
At the completion of the audit, the audit team will issue an audit summary within 90 days after the exit meeting but will strive for a shorter duration. The audit summary will be declared and entered as an official agency record in ADAMS and be made available for public viewing.
Please contact Mallecia Sutton at 301-415-0673 or by via email at Mallecia. Sutton@nrc.gov with any questions related to the conduct of the audit.
Date: July 15, 2024
/RA/
Joshua Borromeo, Chief Advanced Reactor Licensing Branch 1 Division of Advanced Reactors and Non-Power Production and Utilization Facilities Office of Nuclear Reactor Regulation
Project No.: 99902100
Docket No.: 50-613
Enclosure:
Audit Questions
cc: TerraPower Natrium via GovDelivery
ML 24187A117 NRR-106 OFFICE NRR/DANU/UAL1:PM NRR/DANU/UAL1:PM NRR/DANU/UAL1:LA NRR/DANU/UTB2:BC NAME DAtkinson MSutton DGreene CdeMessieres DATE 7/2/2024 7/2/2024 7/11/2024 7/3/2024 OFFICE NRR/DANU/UAL1:BC NAME JBorromeo DATE 7/15/2024 Audit Questions for the Kemmerer 1 Preliminary Safety Analysis Report
Chapter 1, General Plant and Site Description Question Number Description Section Kemmerer 1 preliminary safety analysis report (PSAR) table 1.4-2, 1.4, Conformance Topical Reports, does not list NATD-LIC-RPRT-0001, Regulatory with Regulatory 1-1 Management of Natrium Nuclear Island Design Interfaces. The NRC Criteria and staff requests that US SFR Owner, LLC (USO) clarify why this topical Referenced Material report appears to be incorporated by reference into Kemmerer 1 PSAR 1.1.4.4.9, Energy Island Facilities, but isnt included in table 1.4-2.
PSAR table 1.4-2 states that topical report TP-LIC-RPT-0005, 1.4 Radiological Release Consequences Methodology, is referenced in PSAR section 3.1.1, Overview of Probabilistic Risk Assessment (PRA) .
1-2 However, the NRC staff identified that the report appears in PSAR section 3.3.1, " Licensing Methodology for Design Basis Accidents," and it was not found in PSAR section 3.1.1. Please clarify if this was a typographical error in table 1.4-2.
PSAR table 1.4-2 states that TP-LIC-RPT-0003, Radiological Source 1.4 Term Methodology, is referenced in PSAR section 3.1, Probabilistic 1-3 Risk Assessment. However, the NRC staff identified that the report appears in in PSAR section 3.2, Licensing Methodology for Mechanistic Source Term, and it was not identified in PSAR section 3.1.1. Please clarify this discrepancy.
There appears to be an inconsistency in the title for TP-LIC-RPT-0007, 1.4 Desig n Bases Accident (DBA) Transient Methods for Events with Radiological Release, in Kemmerer PSAR table 1.4-2 and the title of this report in Kemmerer PSAR 3.3.1.2. The title in table 1.4- 2 is Design 1-4 Basis Accident (DBA) Transient Methods for Events with Radiological Release, while the title for this report in PSAR s ection 3.3.1.2, Ex -
Vessel DBAs and DBAs with Potential Radiological Release, is Design Basis Accident Methodology Report for Potential Fuel Failure and Release. The NRC staff requests that USO clarify this discrepancy between the titles of TP-LIC-RPT-0007.
PSAR table 1.4-3, Technical Reports, references TP-LIC-RPT-0009, 1.4 Major Accident Methodology Report, which appears to be 1-5 inconsistent with PSAR section 3.3, Licensing Methods for Evaluation of Licensing Basis Events, where a report with the same title is listed as TP- LIC-RPT- 0010. The NRC staff requests that USO clarify the discrepancy regarding the report numbers.
PSAR table 1.4-5, Consensus Codes and Standards, lists DANU-ISG- 1.4 2023- 01, draft, Review of Risk -Informed, Technology-Inclusive Advanced Reactor Applications - Roadmap. This does not appear to 1-6 be completely accurate. The identifier for this document is DANU-ISG-2022-01 and it was issued as final in March of 2023. The NRC staff requests that USO clarify the discrepancy regarding the edition of this document.
PSAR table 1.4-1, Conformance with Regulatory Guides does not list 1.4 1-7 Regulatory Guide (RG) 1.11, Revision 1, Instrument Lines Penetrating the Primary Reactor Containment (ML100250396). This report appears to be incorporated by reference into PSAR 7.2.3.2.3,
Enclosure
Regulatory Guidance, and, as such, the staff requests clarification if it should be included in table 1.4-1.
PSAR table 1.4-1 does not list RG 1.221, Revision 0, Design-Basis 1.4 1-8 Hurricane and Hurricane Missiles for Nuclear Power Plants. This report appears to be incorporated by reference into PSAR 36.4, and, as such, the staff requests clarification if it should be included in table 1.4-1.
Chapter 2, Site Information 2-1 The NRC staff requests that USO provide clarification and potential 2.5.1.2, Probable updates to the PSAR regarding the following items: Maximum Flood on a) USO evaluates the site- specific probable maximum flood Streams and River (PMF) regarding streams using a combination of Hydrologic Engineering Center (HEC), Hydrologic Modeling System (HMS),
and River Analysis System (RAS) models. Explain how the HEC -
HMS subbasin outflows are used as input to HEC- RAS channels. Especially, clarify how the HEC -RAS upstream boundary conditions are set up for the HEC- RAS channel sections which are located within each HEC -HMS subbasin.
b) The HEC-HMS was set up with four subbasins - West, Laydown, East and Confluence. The East and West subbasins cover approximately 67 percent and 27 percent of the entire basin, respectively, and are highly channelized so that they could be routed better by more refined subbasins. Discuss a ny potential bias (underestimation) in PMF estimates due to not fully accounting for detailed channel networks on these subbasins.
c) USO states that a unit hydrograph method in HEC-HMS is used to transform rainfall to runoff. However, the models have not been calibrated and verified with observed data. Discuss the applicability of increasing the peak and decreasing time to peak as recommended by NUREG/CR- 7046, Design- Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America (ML11321A195).
2-2 The NRC staff requests that USO provide clarification and potential 2.5.1.2.9, updates to the PSAR regarding the potential for sediment build- up (soil Sedimentation and and debris) on the channels near the plant site due to slowing and Erosion Impact merging effects of channel flows, especially for the combined events of big flood and dam failure as addressed in PSAR s ection 2.5.1.3, Potential Dam Failures.
2-3 PSAR section 2.5.3.1.9 mentions that the maximum groundwater levels 2.5.3.1.9, were obtained from a three- dimensional groundwater model. Subsurface However, the PSAR does not include a description of this groundwater Hydrostatic Loading modeling. Please provide the calculation document (if available), or provide a brief description of the groundwater model, including the assumptions, data, setup, and calibration/simulation results involved in the groundwater modeling.
2-4 Section 2.5.3.1.11 states that a three-dimensional groundwater model 2.5.3.1.11, was developed for the Kemmerer Unit 1 site to estimate construction Reliability of dewatering rates. However, the PSAR does not include a description of Dewatering Systems this groundwater modeling. The NRC staff requests that USO provide the calculation document (if available) or provide a brief description of the groundwater model. The document should include the
- 3 -
assumptions, data, setup, and calibration/simulation results involved in the groundwater modeling.
2-5 The NRC staff would like USO to clarify if identified geological and 2.6, Geology, seismology conditions (referenced in PSAR section 2.6) have been Seismology, and considered for potential effects on developing security plans under the Geotechnical requirements in Title 10 of the Code of Federal Regulations (10 CFR) Engineering Part 73, Physical Protection of Plants and Materials .
2-6 The NRC staff requests that USO clarify if the identified regional 2.4, Regional climatology and local site meteorology (referenced in PSAR section 2.4) Climatology, Local have been analyzed and considered for potential effects on developing Meteorology, and security plans under the requirements in 10 CFR Part 73. Atmospheric Dispersion 2-7 The NRC staff would like USO to clarify if identified hazardous material 2.3, Regional in the vicinity, onsite, and nearby industrial, military, and Climatology, Local transportation facilities (referenced in PSAR section 2.3) have been Meteorology, and considered for potential effects on developing security plans under the Atmospheric requirements in 10 CFR Part 73. Dispersion 2-8 The NRC staff requests that USO provide the following input and 2.4.4.1, Short-Term output files in native file format (e.g., text file) for the purpose of the Diffusion Estimates, NRC staff performing confirmatory analysis of the atmospheric and 2.4.4.2, Long-dispersion estimates in PSAR sections 2.4.4.1 and 2.4.4.2: Term Diffusion
- ARCON input and output files used to determine atmospheric Estimates dispersion factor (X/Q) at exclusion area boundary (EAB) and low population zone (LPZ) as discussed in PSAR section 2.4.4.1.1, ARCON, and presented in PSAR table 2.4- 79, ARCON 99.5th Percentile X/Q Values at the EAB.
- ARCON input and output files used to determine Control Room X/Qs as discussed in section 2.4.4.1.1 and presented in PSAR table 2.4- 78, ARCON 95th Percentile X/Q Values for the On- Site Control Room Evaluation for the Average Male.
- XOQDOQ input and output files used to determine X/Qs as discussed in section 2.4.4.1.1 and presented in tables 2.4 -80, XOQDOQ Distances from [Reactor Building (RXB)] to Nearest Receptors Per Directional Sector through 2.4- 89 [Energy Island (EI)] 50-mile X/Q and D/Q Values, Deposited.
2-9 The NRC staff requests that USO provide the following for the purpose 2.4.4, Atmospheric of the NRC staff performing confirmatory analysis of the atmospheric Dispersion dispersion estimates provided in s ection 2.4.4. The NRC staff requests USO provide the three years of onsite meteorological data collected from the Naughton Power Plant meteorological tower. This data should be provided in RG 1.23, appendix A format and in a native file format (e.g., text file).
2-10 The NRC staff requests that USO provide the following: The Senior 2.6.2, Vibratory Seismic Hazard Analysis Committee (SSHAC) report covering the Ground Motion Seismic Source Model, Ground Motion Model, and Probabilistic Seismic Hazard Analysis (PSHA) and site response calculation sections, including any appendices and electronic attachments.
2-11 The NRC staff requests that USO provide reports or calculation 2.3 packages that describe the following:
- ALOHA analysis of hazards from a potential pipeline rupture, which should include the assumptions made and their bases.
- ALOHA analysis of hazards from transportation of hazardous chemicals on nearby roads and at nearby facilities, which should include the assumptions made and their bases.
- Analysis of explosion hazards from transportation of explosives to the Kemmerer mine for blasting coal.
2-12 The NRC staff requests that USO provide reports or calculation 2.6.4, Stability of packages that describe the following: Subsurface Materials
- Subsurface Investigation Data Report (preferably in and Foundations downloadable form for staff independent analyses), which and 2.6.5, Stability should include the boring logs and core run photographs. of Slopes
- Foundation bearing capacity and associated settlement assessment report, which should include estimation of rock mass strength and stiffness calculations.
- Estimation of lateral pressure.
- Analyses of stability of both soil and rock slopes.
- Description of the model to represent the response of the contact between soil and rock with the outer surface of the safety-related structures, e.g., Reactor Building (RXB), Fuel Handling Building (FHB), Reactor Auxiliary Building (RAB), and estimation of the model parameters that would be used in subsequent analyses (e.g., soil-structure interaction analysis).
Chapter 3, Licensing Basis Events The NRC staff requests access to documentation of the development of 3.2, Licensing the source terms provided in the summary table (PSAR tables 3.2 -1, Methodology for Protected Loss of Flow or Loss of Offsite Power through 3.2- 19, Mechanistic Source Unprotected Loss of Heat Sink, Full Core and [In -Vessel Storage (IVS)] Term 3-1 Fail). This includes calculations, description of the implementation of the source term methodology, as well as justifications for inputs and assumptions, computer code output, or other relevant documentation.
Please provide similar information for the implementation of the major accident technical report.
The NRC staff requests that USO clarify the assumptions and basis for 3.2 3-2 source term parameters to model the release to the environment which are not described in the PSAR, such as radionuclide chemical forms, aerosol size distribution, plume sensible heat.
The NRC staff requests that USO describe the use of the source term 3.2 summary tables. Specifically, confirm that the cumulative activity 3-3 release in each column is given for all time up to the listed time at the heading of each column (not for just the interval between the headings). The NRC staff requests that USO confirm that table 3.2- 19 is the source term for the major accident.
The NRC staff requests that USO provide access to documentation of 3.3.1, Licensing the consequence analyses for licensing basis events ( LBEs) (anticipated Methodology for operational occurrences (AOOs), design-basis events (DBEs), beyond Design Basis design basis events (BDBEs ), and design-basis accidents (DBAs )), Accidents, 3.3.2, 3-4 including uncertainty quantification for comparison to the frequency- Licensing consequence (F-C) curve as plotted in PSAR Figure 3.5-1 , F-C Chart for Methodology for LBEs with Uncertainty Bands, as well as the integrated risk AOO, DBE, and evaluations. The NRC staff requests that the documentation include BDBE, 3.5, LBE calculations, description of the implementation of the radiological Summary, through release consequences methodology, as well as justifications for inputs 3.9, Design Basis
- 5 -
and assumptions, computer code output, or other relevant Accidents, and 4.1, documentation. Overall Plant Risk Performance Summary The NRC staff requests that USO provide access to documentation of 3.3.3, Licensing 3-5 the consequence analysis calculation and supporting documents for Methodology for the major accident. Major Accident The NRC staff requests that USO clarify which source terms are related 3 to which LBEs or other quantified events (OQEs) , given the naming 3-6 conventions in various PSAR sections, as well as the emergency planning zone (EPZ ) and major accident technical reports and the related topical reports currently under review.
PSAR table 3.1-1, Potentially More -Than-Minor PRA Assumptions, 3.1, Probabilistic states that the local core faults have an initiating event frequency of Risk Assessment 1x10- 3 per year.
a) The assumption listed for the row in the table is "Local core blockage," but the description refers to "local core faults" and mentions loss of hydraulic hold down being included in the 3-7 value. The NRC staff requests that USO clarify what initiators are considered in the event frequency.
b) The table states that the generic data for core faults show a range of seven orders of magnitude. The NRC staff requests that USO provide further discussion on the generic data used to derive the frequency. The NRC staff also requests that USO discuss how the frequency was determined and how the uncertainty is represented in the analysis.
PSAR table 3.1-2, Hazard Screening Summary, provides a list of 3.1 3-8 hazards screened out of analysis. The NRC staff requests that USO provide access to documentation supporting the results discussed in the table.
PSAR section 3.3.4.3 discusses the termination criteria for transient 3.3.4.3, LBE Analysis analyses. End States a) One termination criterion is peak cladding temperature below 625 degrees Celsius (°C) and "stable." The NRC staff requests that USO provide the criteria used to determine whether temperature is stable prior to terminating an analysis.
b) The section states that transient analyses may be terminated when k-effective is equal to one for BDBEs and for transients 3-9 that do not result in a reactor scram. The NRC staff requests that USO provide a justification for terminating transients when the reactor is still critical.
c) The NRC staff requests that USO discuss whether transients are evaluated for a return to criticality after an initial shut down period. If not, the NRC staff requests that USO provide a justification. If yes, the NRC staff requests that USO discuss the criteria used to determine whether a transient should be subject to a re-criticality evaluation.
The legend on PSAR Figure 3.5-1, F -C Chart for LBEs with Uncertainty 3.5 3-10 Bands is difficult to interpret because the colors are very similar. The NRC staff requests that USO provide an alternate version (or multiple alternate versions, as appropriate) of the figure with a clear legend.
- 6 -
Alternatively, provide the underlying information so the NRC staff can recreate the figure.
PSAR section 3.11 states that the "[f]inal results, including radionuclide 3.11, Fuel System retention requirementswill be provided at the operating license Design stage." The NRC staff presumes that the "requirements" referred to are 3-11 the design requirements for the fuel system related to radionuclide retention and release from the fuel matrix. The NRC staff requests that USO describe how the radionuclide retention and release from the fuel were modeled for the preliminary analyses supporting the CPA.
The NRC staff requests that USO provide detailed documentation of 3.3.4, LBE Plant the LBE analyses summarized in PSAR sections 3.3.4 and 3.5 and Response and discussed in detail on PSAR sections 3.6, Anticipated Operational Analysis Overview, Occurrences, through 3.9. The NRC staff requests the documentation and 3.5, through 3.9, 3-12 include calculations, description of the implementation of Design Basis methodologies described in s ection 3.3, Licensing Methods for Accidents Evaluation of Licensing Basis Events, as well as justifications for inputs and assumptions, computer code output, or other relevant documentation. Refer also to audit questions 3-4 and 3-7 above.
PSAR section 3.3.2.1 discusses licensing methodologies used to 3.3.2.1, "AOOs, DBEs, evaluate non-DBA LBEs for Kemmerer Unit 1. The section states that and BDBEs" the AOO, DBE, and BDBE analyses may use either the same conservative approach used for DBAs or a best -estimate plus uncertainty (BEPU) based approach.
a) The NRC staff requests that USO clarify which LBEs in the PSAR are conservative and which are BEPU.
3-13 b) The BEPU approach does not appear to be described in the PSAR or in documentation provided in the pertinent topical reports submitted to date. The NRC staff requests that USO provide an overview of how uncertainties are incorporated into any BEPU event analyses discussed in chapter 3, including uncertainties in fuel performance, core design and neutronics, thermal-hydraulics, system-level responses, phenomena considered in the source term analyses, and phenomena considered in the consequence analyses.
Nuclear Energy Institute (NEI) 18-04, Risk-Informed Performance- 3.6, 3.7, Design Based Technology Inclusive Guidance for Non- Light Water Reactor Basis Events, and Licensing Basis Development, Revision 1 (ML19241A472), section 3.8, Beyond Design 3.2.2,"LBE Selection Process, "Task 7a," Evaluate LBEs Against F-C Basis Events Target" states that" when the uncertainty bands [] defined by the 5th percentile and 95th percentile of the frequency estimates straddles a frequency boundary, the LBE is evaluated in both LBE categories." Many LBEs in the PSAR span multiple categories and it is 3-14 unclear whether the events are analyzed in all appropriate categories.
In particular, the NRC staff is concerned with the following events which have a 95th percentile frequency indicating that they should be considered in categories corresponding to more frequent events and requests that USO justify why the events in the PSAR that were not analyzed in those accident categories:
- RRS- SPLX-BL, RRS- RWG-1, and RFH-LMCA-BL, which are categorized as DBEs but have upper 95th percentiles in the AOO frequency range (> 1x10-02), and
- 7 -
- RFH-FDSP-2, RFH-ESWR-2, RFH-FDBL-1, RFH-FDEM-1, RFH-FDPI-BL, and RFH-FDRC-1, which are categorized as BDBEs but have upper 95th percentiles in the DBE frequency range (>
1x10-04).
PSAR section 3.3.4.1.1 states that for increase in heat removal events, 3.3.4.1.1, "Increase in
"[i]f a reactor power runback successfully completes and prevents a Heat Removal" 3-15 scram setpoint from being reached, the event is not classified as an LBE." The NRC staff requests that USO clarify why it is not appropriate to consider these events as LBEs.
PSAR section 3.3.4.1.5 describes the response to "[a] localized fault, 3.3.4.1.5, "Local Fuel such as a localized blockage of fuel subchannelsduring full power Fault" operating conditions."
a) Fuel misloads are typically considered local faults and are typically also considered at conditions leading up to full power 3-16 conditions. The NRC staff requests that USO clarify if local faults include fuel misloads. If so, the NRC staff requests that USO clarify how are they evaluated.
b) The section states that "[t] he assumption an entire fuel assembly failed due to the event is conservative ." The NRC staff requests that USO provide justification that a local fault would not propagate to other assemblies in the core.
PSAR section 3.13.2, Design Basis, includes a reference to principal 3.13, 3. Thermal and design criteria (PDC) 15, Primary Coolant System Design. However, Hydraulic Design, 3-17 PDC 15 is not identified in PSAR section 5.3.2.6, PDC 15 - Primary Coolant System Design, as being applicable to PSAR section 3.13.2.
The NRC staff requests that USO clarify this discrepancy regarding PDC 15.
There do not appear to be any LBEs that represent reactivity transients 3.5, 3.6, 3.7, 3.8, 3.9 3-18 initiated from a low power or shutdown condition s. Please discuss any considerations for these types of LBEs.
There are transient overpower events caused by control rod 3.6, 3.7, 3.8, 3.9 withdrawal in both the AOO and BDBE frequency ranges. However, 3-19 there are no reactivity events in the DBE range, which necessitated the addition of the seismic DBA to cover reactivity insertion events. Please discuss why there are no reactivity DBEs.
The NEI 18-04 methodology requires that for each DBE identified, a deterministic DBA be defined. AOOs and BDBEs with uncertainty bands that span the DBE frequencies should also be evaluated as DBEs. With that in mind, table 3.5- 4, Summary of DBAs, and section 3.9 appear 3-20 to be missing event RFH-OEFH-BL from table 3.5-2, Summary of Table 3.5-4, 3.9 DBEs, and all AOOs and BDBEs with uncertainty bands that straddle the DBE frequency boundary (at least one AOO and six BDBEs, looking at just the ones that result in release for the nominal evaluation). The NRC staff requests that USO justify why these events were not analyzed as DBAs, as the methodology requires.
PSAR section 3.1.1.2 indicates that PRA assumptions with more -than-minor impacts are described in table 3.1-1. The NRC staff requests 3.1.1.2, PRA 3-21 that USO provide more information on the acceptance criteria used for Technical Adequacy more -than-minor impacts and provide examples of PRA assumptions that were screened out using these criteria.
- 8 -
Section 3.1.1.2 references an evaluation comparing the differences 3-22 from the CP stage design to the CP stage PRA. The NRC staff requests 3.1.1.2 that USO provide this evaluation or provide a list of these differences.
PSAR section 3.1.1.6 provides a list of plant operating states, but the names provided in the listing are not sufficient to determine what state 3.1.1.6, Plant 3-23 the plant systems are in. The NRC staff requests that USO provide a Operating States more detailed description of these plant states and how they relate to or differ from each other.
PSAR section 3.1.1.7 states that IEs were initially identified by reviewing published IE lists and individual event frequencies were 3-24 developed using appropriate and available generic data sources The 3.1.1.7, Initiating NRC staff requests that USO provide references for these published IE Event Identification lists and generic data sources and, where possible, provide the references in the eRR for staff audit.
PSAR table 3.1-1, consequential fuel damage states that inadvertent motion of any partially raised core assembly during the refueling Table 3.1-1, process does not result in damage that could result in radionuclide Potentially More -
3-25 release of an adjacent assembly and notes that this is rea sonable Than-Minor PRA given what is known about the current design. The NRC staff requests Assumptions that USO provide a description of the design features being referenced here that support this assumption.
Regarding PSAR table 3.1-2, Table 3.1-2, Hazard a) The NRC staff requests that USO p rovide justification for Screening Summary qualitatively screening out aircraft impact (versus quantitatively screening).
b) Corrosion (e.g., from salt water) is listed as being screened out. The NRC staff requests that USO confirm that corrosion was considered as an initiator for leaks within the systems or provide justification for why not.
c) Dropped loads are listed as screened out. The NRC staff requests that USO confirm whether this is only for the NOG- 1 qualified crane or for all cranes within the facility. If for all 3-26 cranes, provide further justification.
d) High and low air temperatures are screened out, but the design temperatures listed in table 2.1 -2, Kemmerer Unit 1 Site Characteristics, indicate that they are based on the 99.6th percentile. The NRC staff requests that USO provide justification for screening out low and high temperature as initiators to events when temperatures outside of the design temperatures falls within an AOO frequency.
e) With respect to screening out internal missiles, The NRC staff requests that USO confirm that there are not compressed gas cylinders within the facility that could be a source of internal missiles.
PSAR section 3.3.4.1.3 states that the Intermediate Sodium Pumps 3.3.4.1.3, Reactivity 3-27 (ISPs) will reduce speed if a scram occurs. The NRC staff requests that USO explain if the ISPs also reduce speed if a power runback occurs and if not, could this result in a reactivity insertion due to overcooling.
The NRC staff requests that USO provide a more detailed description of 3.3.4.1.3 3-28 the sequence of events that occur during a (a) power runback and (b) scram.
- 9 -
PSAR section 3.5.1 states that LBEs are classified as risk-significant if 3.5.1, Summary the LBE site boundary dose exceeds 2.5 mrem over 30 days and the Evaluation of AOOs, 3-29 frequency of the dose is within one percent of the F- C target. The NRC DBEs, and BDBEs staff requests that USO confirm that 95th percentile frequency and dose consequences were used in this determination.
PSAR section 3.5.1 states that BDBEs are classified as high 3.5.1 3-30 consequence is the dose exceeds 10 CFR 50.34 criteria. The NRC staff requests that USO confirm whether dose consequences were calculated over a 2-hour or 30-day duration.
Event RFH-OEFH-BL, Removal of Fuel Assembly Prior to Decay with Table 3.5-2 Active Cooling, is listed in t able 3.5- 2, but does not appear to be 3-31 discussed anywhere else within the application, including PSAR section 3.7 where it should be described in more detail and section 3.9 where it should be evaluated as a DBA. The NRC staff requests that, if this event was removed as a DBE, provide justification for its removal.
Events SUD-IACA-BL, SUD-IACA-1, and SUD-IACA-2 are events with loss Table 3.5-1, of one train of IAC while shutdown. There do not appear to be any Summary of AOOs, 3-32 events for the same failure while at power. The NRC staff requests that Table 3.5-2, and USO provide justification for why this event would not occur at power Table 3.5-3, or why it was not included within the PRA. Summary of BDBEs For RFH-LSPC-BL, the Spent Fuel Pool cooling system is restored prior 3.6.4.2, Loss of to boiling. The NRC staff requests that USO explain the timing needed Spent Fuel Pool 3-33 for this action and if this action is captured as a credited control. Cooling with Cooling Restored (RFH-LSPC-BL)
For some events, the source term was released into alternative Mechanistic Source locations where the leak rate was higher than the expected release Term sections location. It is also important however that the alternative location has 3.6.4.1.2, 3.7.3.2.2, a conservatively low volume for dispersal (to give higher 3.8.5.8.2, 3.8.5.9.2, concentration). With that in mind, t he NRC staff requests that USO 3.8.5.14.2, 3.8.5.15.2, 3-34 confirm that the Ex-Vessel Handling Machine (EVHM) has a smaller 3.8.5.16.2, and volume than the Pin Removal Cell ( PRC), the Head Access Area (HAA) 3.9.5.3.2 has a smaller volume than the vapor trap cell compartment, the EVHM has a smaller volume than the Bottom Loading Transfer Cask (BLTC),
and the EVHM has a smaller volume than the Pool Immersion Cell (PIC) or provide further justification on why the use of these alternative release locations is conservative.
As described in RG 1.247, trial revision, Acceptability of Probabilistic Chapter 3, Licensing Risk Assessment Results for Non-Light-Water Reactor Risk-Informed Basis Events Activities, (ML21235A008) PRA documentation should be sufficient to allow the NRC staff to determine the acceptability of the PRA and the PRA results used to support the application. Thus, the NRC staff 3-35 requests that USO to identify and make available for the NRC staff audit the archival PRA- related documents (including PRA notebooks, other supporting documents, assumptions made in lieu of design, as -
built, and as-operated details that should be tracked as the PRA is modified to reflect the lifecycle of the plant), to gain a full understanding of the technical bases of the PRA and how the assessment and its results are used to support the application.
The NRC staff requests that USO to make the written PRA self- Chapter 3 3-36 assessment report, which documents both the details and the summary findings of the self-assessment, available for the NRC staff
- 10 -
audit. Specifically, the NRC staff is looking to understand and audit the following:
- Definition of the scope of the self- assessment,
- Summary of the results of the self-assessment for each PRA technical element,
- Summary of any Findings or Facts and Observations (F&Os) generated from the self -assessment,
- Summary of identification of important assumptions and sources of uncertainty, their impacts, and the treatment,
- Identification of the assessed capability category (CC) for each supporting requirement (SR) within the scope of the self -
assessment and the basis for the assignment, and
- The conclusions of the self-assessment team.
The NRC staff requests that USO provide an overview and a Chapter 3 demonstration of the software and analytical tools ( e.g., Electric Power Research Institute Phoenix Architect 2.0) used to construct the PRA, perform the event sequence modeling, and quantify the risk. The 3-37 demonstration should also include the UNCERT module used for the parametric uncertainty analysis to calculate the 5th and 95th percentile values. In addition, the demonstration should include the software and analytical tools that are used to determine the mechanistic source terms and evaluate the radiological consequences.
The NRC staff requests that USO make available for audit the Chapter 3 configuration and design control processes, along with their documentation, to ensure that the PRA is maintained, updated, and upgraded to reflect the as-designed, as-to- be-constructed, and as-to-be-operated plant design and margin to Quantitative Health Objectives (QHOs).
Specifically, the NRC staff plans to audit:
3-38
- The process for monitoring changes to the plant design, operation PRA technology, and industry experience,
- The process that maintains and upgrades the PRA to be consistent with the as- designed, as-to- be-constructed, and as intended- to- operate,
- The cumulative impact of important pending changes ,
- The process that maintains configuration control of computer codes and associated files used to support the PRA, and
- Documentation of the configuration control program and its implementation to provide traceability of the work.
NEI 18-04 requires documenting the basis for support structure, Chapter 3 system, and component (SSC) categorization by the Integrated Decision-Making Process (IDP) and evaluating the adequacy of special 3-39 treatment to SSC categorization, etc. Thus, the NRC staff requests that USO make available for audit the documentation relevant to the implementation of Licensing Modernization Project that USO has established.
NEI 18-04 states that the decisions of the IDP should be documented Chapter 3 3-40 and retained as a quality record; this function is critical to future decision-making regarding plant changes which have the potential to affect defense-in-depth (DID). The NRC staff requests that USO make
available all documents resulting from the IDP discussions and decisions (i.e., meeting minutes, summaries).
Chapter 4 Integrated Evaluations 4-1 The NRC staff requests that USO provide additional details on the other 4.1, Overall Plant quantified events (OQEs) discussed in PSAR section 4.1, Overall Plant Risk Performance Risk Performance . The NRC staff requests that USO describe the Summary events that were considered for inclusion as OQEs but ultimately screened out, the events that were evaluated as OQEs, and how the OQEs included in the evaluation of Quantitative Health Objectives were evaluated.
Chapter 5, Safety Functions, Design Criteria, and SSC Safety Classification PDC 19, Control Room, describes that the habitability dose analyses 5.3.2.10, Principal are described as being evaluated for DBAs using DBE source terms Design Criteria which credit non-safety-related with special treatment (NSRST) SSCs. Regulatory Main Control Room (MCR) dose results to show PDC 19 criteria is met Evaluation are not provided in PSAR section 5.3.2.10, PDC 19 - Control Room, or 5-1 other noted relevant PSAR sections (7.5.1, Nuclear Island (NI)Heating, Ventilation, and Air Conditioning (HVAC) System, 7.6.7, Control Room and Indications, and 7.8.4, Nuclear Island Control Building ). The NRC staff requests the USO provide the NRC staff access to the analysis and supporting documentation describing the estimation of MCR dose consequences, including modeling of the MCR and the resulting DBA doses.
Classification for the instrumentation and controls (I&C) systems is not 5.2, Safety-located in chapter 5 (e.g., reactor protection system (RPS), nuclear Significant PRA Safety instrumentation system (XIS), reactor instrumentation system (RIS)); Functions 5-2 their classification is not identified until table 7.6.1.1a, I&C System Classification and [defense line (DL)] Functions. Consider the addition of pointers between the tables or additional discussion added to the PSAR.
PSAR section 3.13, Thermal and Hydraulic Design, includes a 3.13, Thermal and reference to PDC 15, Primary Coolant System Design. However, PDC Hydraulic Design ,
5-3 15 is not identified in PSAR section 5.3.2.6 as being applicable to PSAR 5.3 section 3.13. Please clarify if section 3.13 should be included in list of relevant sections in sections 5.3.2.6.
PSAR section 3.13 includes a reference to PDC 34, Residual Heat 3.13, 5.3 5-4 Removal. However, PDC 34 is not identified in PSAR section 5.3.4.5 as being applicable to PSAR section 3.13. Please clarify if section 3.13 should be included in the list of relevant section in section 5.3.4.5.
PSAR section 3.12, Nuclear Design, includes a reference to PDC 26, 3.12, Nuclear Reactivity Control Systems. However, PDC 26 is not identified in PSAR Design, 5.3 5-5 section 5.3.3.7 as being applicable to PSAR section 3.12. Please clarify if section 3.12 should be included in the list of relevant section in section 5.3.4.7.
PSAR section 5.3.4.3 states: The RIM Program and assessment of 5.3.4.3, Fluid and available testing and service data provide an appropriate material Heat Transport surveillance program for the reactor vessel (RV) without the use of Systems, 7.1.2, 5-6 material surveillance coupons as described in section 7.1.2. PSAR Reactor Enclosure section 7.1.2.2 states: Available service degradation data for RV System materials under anticipated environmental conditions from published testing results from operating and test reactors, and specific testing performed to qualify the RV materials, is evaluated to support the basis
for RV material selection. PSAR section 7.1.2.3 states: Based on the expected results of the evaluations of the effects on the metallic materials of neutron fluence and the high-temperature sodium operating conditions, there is margin to material degradation limits throughout the design lifetime such that an in-vessel material surveillance program is not required, as further described in section 7.1.2.2 for compliance with PDC 32.
- What is the maximum neutron fluence expected for the Natrium RV base and weld metals?
- Please provide for audit the expected results of the evaluations of the effects on the metallic materials of neutron fluence and the high- temperature sodium operating conditions showing there is margin to material degradation limits throughout the design lifetime.
- Please provide additional justification for the statement in the PSAR that an in-vessel material surveillance program is not required given the limited information available at the preliminary design stage.
- What testing is planned to be performed to qualify the RV materials?
- PSAR section 7.1.1.1 indicates the Natrium design will include materials surveillance assemblies. What is the purpose of these assemblies if an in -vessel material surveillance program is not required?
PSAR section 5.3.6.8 indicates that PDC 77 requires that Components 5.3.6, Additional that are part of the intermediate coolant boundary shall be designed to PDC, 7.1.4.1, permit (1) periodic inspection and functional testing of important areas Intermediate Heat and features to assess their structural and leak tight integrity Transport System commensurate with the systems safety significance, and (2) an appropriate material surveillance program for the intermediate coolant boundary. PSAR section 7.1.4.1 states: the intermediate coolant boundary is designed to permit periodic inspection and functional testing of important areas and features to assess structural and leak tight integrity. The intermediate coolant boundary is within the scope of pre-service and in-service monitoring and non- destructive 5-7 examination performed under the Reliability and Integrity Management Program described in chapter 8.
The implementation summary in PSAR section 5.3.6.8 only discusses designing to permit access for periodic inspection and functional testing in accordance with the RIM Program, while section 7.1.4.1 also discusses pre -service and in-service monitoring under RIM. How does the Natrium design intend to meet item (2) from PDC 77 regarding an appropriate material surveillance program for the intermediate coolant boundary? Please provide availa ble information based on the preliminary design regarding what components, materials, environments/locations and potential degradation would be covered by the material surveillance program."
Chapter 7, Descriptions for Safety -Significant SSCs PSAR section 7.2.1, Reactor Air Cooling System, section 7.2.1.2, 7.2.1, Reactor Air 7-1 Design Basis, states that means are provided for monitoring Cooling System radioactivity releases from the Reactor Air Cooling System (RAC).
Activation of air is stated to result in N-16 and Ar-41 as gaseous effluents, that are evaluated in PSAR section 9.1. The NRC staff requests that USO provide information about its plan to monitor and quantify the gaseous effluent from the RAC.
PSAR section 7.4.1, Gaseous Radwaste Processing System, section 7.4.1, Gaseous 7.4.1.2, Design Basis, under the description of regulatory guidance Radwaste Processing 7-2 states that the applicant is in full conformance with RG 1.110, and that System a cost benefit analysis is performed as required by 10 CFR 50.34a.
Please provide this analysis for audit and indicate if the analysis results are provided in the PSAR?
Clarify whether plant specific action items discussed in section 7.0, 7.6.3.2, Reactor Plant Specific Action Items of the RadICS Topical Report safety Protection System 7-3 evaluation (ML19233A177) will be addressed in the PSAR or in TR NAT - Design Bases and 4950, Instrumentation & Control Architecture and Design Basis Associated Safety Topical Report that is currently under review by the NRC staff. Functions Clarify if any digital sensors will be used. If digital sensors will be used, 7.6.5, Reactor 7-4 please discuss common-cause failure regarding the digital sensors and Instrumentation specify whether that discussion is in the CP application or in NAT-4950. System PSAR section 7.6.7.1.1 states that the MCR contains equipment that 7.6.7.1.1, Plant allows operators to initiate or take manual control of functions Control 7-5 associated with the RPS and Nuclear Island and Control System. Please discuss with the NRC staff to provide additional clarification regarding this statement.
The first sentence of the first paragraph of PSAR section 7.6.8.1 7.6.8.1, System indicates that the Anticipatory Seismic Trip System (AST) provides Description, 7-6 actuation signals to Reactor Trip Breaker (RTBs) through an interface Architecture, and device. However, the AST inputs to the RTBs are not shown in Figure Equipment 5.1 of NAT-4950. Please discuss this discrepancy with the NRC staff. Locations Clarify how the AST signals are isolated from the RPS and clarify if the 7.6.8, Anticipatory 7-7 125 VDC relay shown at top of RPS boxes is the isolating device. Automatic Seismic Trip System Chapter 8, Plant Programs For the commitment to RG 1.54, Revision 3, the PSAR states that 8.1, Quality Regulatory Guide 1.54, Revision 3, Service Level I, II, and III Protective Assurance Coatings Applied to Nuclear Power Plants, is not used for Kemmerer Unit 1. No Service Level I, II, or III protective coatings are used in the design. Conformance to regulatory positions within RG 1.54 will be identified if Service Level I, II, or III protective coatings are identified as 8-1 the design progresses. This statement seems contradictory as it starts by saying that protective coatings are not used in the design, but then it opens the possibility that protective coatings may be used in the design if identified. If protective coatings are identified as the design progresses, confirm that any conformance or except ions to the regulatory positions in RG 1.54 will be addressed. Conformance to the RG should be clear, assuming protective coatings are used.
For the commitment to RG 1.164, Revision 0, the PSAR states that 8.1 Kemmerer Unit 1 fully conforms to Regulatory Guide 1.164, Revision 0, Dedication of Commercial -Grade Items for Use in Nuclear Power 8-2 Plants, as shown in s ection 1.4.1. Regulatory Guide 1.164 Revision 0 is applicable to Kemmerer Unit 1 as a programmatic issue. Clarify what is meant by [RG] 1.164 Revision 0 is applicable to Kemmerer Unit 1 as a programmatic issue.
Section 8.1.2 states that US SFR Owner, LLC (USO), a wholly owned 8.1.2, Plant subsidiary of TerraPower, LLC (TerraPower) , is responsible for the Programs Regulatory establishment and execution of quality assurance program Evaluation requirements. USO accomplishes this through agreement with TerraPower for TerraPower to be responsible for all activities for Kemmerer Unit 1 using the TerraPower quality assurance program description (QAPD). TerraPower may delegate the work of establishing 8-3 and executing the quality assurance program, or any parts thereof, but retains responsibility for the quality assurance program.
a) Explain how USO provides oversight to TerraPower if USO is utilizing the TerraPower QAPD. How does the TerraPower QAPD describe the USO organization as required by Criterion I, Organization, of a ppendix B to 10 CFR Part 50?
b) Explain what this agreement between USO and TerraPower consists of for the establishment and execution of the quality assurance program requirements.
Chapter 9, Control of Routine Plant Radioactive Effluents, Plant Contamination, and Solid Waste How are the RG 1.143 radwaste system design classifications 9.1, Liquid and determined for the Gaseous Radwaste Processing System (RWG), Gaseous Effluents Liquid Radwaste Processing System (RWL), and Solid Radwaste 9-1 Processing System (RWS)? The NRC staff requests access to supporting calculations or discussions for how USO determined the radwaste system classifications for its RWG, RWL, and RWS systems using the guidance contained in RG 1.143.
Regarding PSAR section 9.1.3 RWL Summary Description, the NRC 9.1 staff requests that USO describe the methods for determining that liquid effluent is acceptable for evaporation. Specifically, t he NRC staff requests clarification on if there will be any controls in place to 9-2 establish representative sampling or monitoring of tanks, and to understand where the evaporated liquids are directed. From observations of Figure 9.1-1, RWL Simplified Diagram, it points to a box labeled RWL Room Environment. The NRC staff requests clarification on if this implies that the evaporated waste will be directed through the building ventilation system.
For the stated effluent dose results included in PSAR table 9.1-3, please 9.1 provide input and output files for this analysis to facilitate 9-3 understanding of the calculations. In addition, please provide any supporting calculation files that describe inputs and the justification, if available.
Does USO plan on addressing compliance with 10 CFR 20.1302(b)(i) for 9.1 showing the annual average concentrations of radioactive material 9-4 released in gaseous and liquid effluents at the boundary of the unrestricted area do not exceed the values specified in table 2 of appendix B to Part 20.
Are there any other release points for gaseous effluent besides the 9.1 plant stack and the RAC? PSAR table 9.1 -1 includes estimated release 9-5 of tritium (H- 3) from the c old salt tank cover gas and the steam generator. Where are those release points? Will there be effluent monitoring or sampling performed for this release point?
9-6 Regarding PSAR section 9.3 the NRC staff would like to understand the 9.3, Solid Radwaste amount of waste storage space available for the facility and where Processing
solid waste is expected to be stored. Specifically, the NRC staff requests USO provide information on the following:
- The currently estimated solid waste generation rates.
- Expected locations for solid waste storage in the fuel handling building and accompanying discussions on how long it will take to fill the storage area.
- Estimates on frequency of offsite waste shipments.
Chapter 10, Control of Occupational Dose The NRC staff requests a discussion of the expected radiation sources 10 within the facility. The NRC staff is looking to understand the areas of the facility where radiation sources are, where contamination may appear, and USOs plans for radiological controls around the facility.
Regarding PSAR table 10.3 -1, Major Radiation Sources, the NRC staff requests that USO provide supporting information to help the NRC staff understand the radiation environment of the facility. To facilitate the discussion of radiation sources this information may include but is not limited to:
- Using building maps to explain personnel access to the areas 10-1 major radiation sources are located in.
- Description of the estimated area dose rates for the areas where major radiation sources are located in.
- Description of airborne radiation concerns, as well as the design features that may be used to limit them.
- Shielding considerations around major radiation sources,
- The controls in place to limit access to areas that these major radiation sources are in as well as expected occupancy level for those areas.
- Current plans for radiation monitoring around these major radiation sources for both direct radiation monitoring and airborne radiation monitoring.
Please discuss the reason for not referencing RG 8.4, Personnel 10 Monitoring Device - Direct-Reading Pocket Dosimeters. The NRC staff 10-2 is looking to understand if it is because USO has determined that it is not applicable to the design. If that is the reason what types of personnel monitoring are being considered by the facility?
Provide additional details about how the information contained in 10 10-3 PSAR table 10.5- 1, Routine Online Operations Dose Assessment for Expected Occupancy, was determined. Is this generated based on estimates of expected work activities?
PSAR table 1.4-4 states that 10 CFR 50.34(f)(2)(vii), 10 CFR 10 50.34(f)(2)(xxvii), and 10 CFR 50.34(f)(2)(xxviii) are all addressed in 10-4 PSAR section 10.1. However, no references or discussions are made to these items in section 10. The NRC staff requests a discussion on how these Three Mile Island (TMI) items are being addressed by the application.
Chapter 11, Conduct of Operations The NRC staff requests access to documentation of the consequence 11.3.3, Emergency 11-1 analysis performed to support the preliminary determination of the Planning Technical plume exposure pathway EPZ. This should include calculations, a Evaluation description of the implementation of the plume exposure planning
- 16 -
zone sizing methodology, as well as justifications for inputs and assumptions, computer code output, or other relevant documentation.
Please clarify if the preliminary EPZ sizing consequence analysis Preliminary EPZ 11- 2 considers security events consistent with the topical report Technical Report methodology (ML23321A036).
How will training programs that meet the requirements of 10 CFR 11.2, Human Factors 11- 3 50.120 be established for the necessary categories of non- licensed Engineering nuclear plant personnel by 18 months prior to fuel load?
Aside from 10 CFR 50.34(f)(2)(iii) and 10 CFR 50.34(f)(2)(iv), how will 11.1.3, Construction 11- 4 the design of human system interfaces (HSI) and the HSI inventory Organization satisfy the other technologically relevant, HSI-related requirements of 10 CFR 50.34(f)?
How will the construction organization obtain personnel with sufficient 11.1 11- 5 experience and in sufficient numbers to provide adequate management and technical support for the facility?
What measures will ensure the control and preservation of 11.1 11- 6 documentation within the construction organization, including the documentation of communications?
What corporate officer within the organization has ultimate 11.1 11- 7 responsibility for nuclear safety matters and how will it be ensured that ancillary responsibilities will not detract from this?
What is the target date for completing the development of 11.1 11- 8 administrative procedures of a scope that would meet the regulatory guidance of RG 1.33, Quality Assurance Program Requirements (Operation)?
Will USO implement cybersecurity controls included in its 11.6, Fitness-for-Cybersecurity Plan (CSP) for a secure development and operational Duty and Security environment? If yes, which cybersecurity controls will be credited in support of the Secure Development and Operational Environment 11- 9 claims? If not, how does USO intend to meet the applicable regulatory evaluation criteria of RG 1.152 Revision 4, Criteria for Programmable Digital Devices in Safety -Related Systems of Nuclear Power Plants, (ML23054A463) of a Secure Development and Operational Environment for the RPS?
USO indicated that it intends to provide the names and demographics 11, Conduct of of what appears to be approximately 1600 workers for the NRC staff to Operations run the names through the Federal Burea u of Investigation (FBI) Threat Screening Center (TSC). Office of Nuclear Security and Incident 11- 10 Response (NSIR ) has had a memorandum of understanding with the TSC since 2006 to do that for our operating Nuclear Power Plants (NPPs) . We currently receive and submit that information from licensees via electronic transfer to the TSC on a monthly periodicity. In what format will USO provide the approximately 1600 names, etc. to the NRC staff.
10 CFR 50.160(b)(1)(iv)(B)(9), Drills and Exercises, states that the 11.3, Emergency emergency plan should describe the drill and exercise program, with Preparedness references to the process for testing and implementing major portions 11- 11 of the planning, preparations, capabilities, and coordination with offsite organizations to maintain the key skills of emergency responders. PSAR section 11.3.10, Performance Monitoring, states, in part, that drills and exercises will be used to demonstrate the capabilities to perform and maintain emergency response functions as
- 17 -
listed in 10 CFR 50.160(b)(1)(iii)(A) through (H) and performance metric and objectives for each of these functions will be developed and used for evaluation. Confirm that supporting organizations identified in the Kemmerer Emergency Plan as having an emergency response role, responsibility, or authority, will be requested to participate in scheduled drills and exercises. Describe the periodicity of those drills and exercises to include support organizations so that to maintain those key skills necessary for emergency responders.