ML20082J665
ML20082J665 | |
Person / Time | |
---|---|
Site: | 05000246 |
Issue date: | 03/31/1995 |
From: | Leslie Hill, Orlando T POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
IPN-95-043, IPN-95-43, NUDOCS 9504180347 | |
Download: ML20082J665 (6) | |
Text
'
=
Indlin Point 3
, Nucle:r PowIr PI:nt P O. Box 215 e Buchanan, New York 10511 l 914 736.8001
- > NewYorkPower ki"L,a, tv Authority l
April 7,1995 i IPN 043 l 1
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Indian Point 3 Nuclear Power Plant Docket No. 50-286 License No. DPR-64 l Monthly Operatina Report for March 1995
Dear Sir:
The attached monthly operating report, for the month of March 1995, is hereby submitted in accordance with Indian Point 3 Nuclear Power Plant Technical Specification 6.9.1.4.
The Authority is making no commitments in this letter.
Very truly yours,
/ \
$ Hill l phesident Manager
' Indian Point 3 Nuclear Power Plant LMH/cbr Attachment cc: See next page l
<cesen
. U V .L c d 9504180347 950331 /
PDR ADOCK 05000246 f.:
R PDR
l l- ,
! Docket No. 50-286-l' IPN 95-043
. Page 2 of 2 -
- l. cc: Thomas T. Martin
._ Regional Administrator Region i U.S. Nuclear Regulatory Commission
[ 475 Allendale Road l l King of Prussia, Pennsylvania 19406-1415_ '
U.S. Nuclear Regulatory Commission Resident inspectors' Office Indian Point 3 Nuclear Power Plant i
John J. McOscar, Director l
Division of Resource Management and Administration l Region I _
U.S. Nuclear Regulatory Commission !
475 Allendale Road -
King of Prussia, Pennsylvania 19406-1415 ;
i INPO Records Center l 700 Galleria Parkway l Atlanta, Georgia 30339-5957 l
l 1
I e
, - , - - ~ p y -e .- , -, a- n p-
OPERATING DATA REPORT - :
,. DOCKET NO. 50-286 l DATE 04-01-95 1 COMPLETED BY T. Orlando !
TELEPHONE (914) 736-8340 .j IPN-95-043 ATTACHMENT I PAGE 1 of 4 OPERATING STATUS
- 1. Unit Name: Indian Point No. 3 Nuclear Power Plant
- 2. Reporting Period: March 1995
- 3. Licensed Thermal Power (MWt): 3025
- 4. Nameplate Rating (Gross MWe): 1013
- 5. Design Electrical Rating (Net MWe): 965
- 6. Maximum Dependable Capacity (Gross MWe): 1000
, 7. Maximum Dependable Capacity (Net MWe): 965
- 8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report Give Reasons:
- 9. PowerleveltoWhich Restricted,1f Any(Net MWe):
I 10. Reasons for Restrictions, if Any:
This Month Yr. to Date Cumulative -
- 11. Hours in Reporting Period 744 2160 '163.033 1
- 12. Number of Hours Reactor Was Critical 0 0 91.890.14'
- 13. Reactor Reserve Shutdown Hours 0 0 0
- 14. Hours Generator On-Line 0 0 89.462.16
- 15. Unit Reserve Shutdown Hours 0 0 0
~ 16. Gross Thermal Energy Generated (MWH) 0 0 254.069.702
- 17. Gross Electrical Energy Generated (MWH) 0 0 79.388.605
- 18. Net Electrical Generated (MWH) 0 'O 76.357.136
- 19. Unit Service Factor 0 0 54.9
- 20. Unit Availability Factor 0 0 54.9 1 21. Unit Capacity Factor (Using MDC Net) 0 0 49.7*
j 22. Unit Capacity Factor (Using DER Net) 0 0 48.5 Unit Forced Outage Rate 2 3.- 100 , 100 27.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type,Date,and Duration of Each):
i
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 5/01/95 *
- 26. Units in Test Status (Prior to Commercial Operation):
i Forecast - Achieved I
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l
- Weighted Average
i~ AVERAGE DAILY UNIT POWER LEVEL y, DOCKET NO. 50-286 UNIT IP-3 l
DATE 04-01-95 COMPLETED BY T. Orlando TELEPHONE (914) 736-8340.
IPN-95-043 ATTACHMENTI l
PAGE 2 of 4 i
l MONTH MARCH 1995 l
l . .
DAY: AVERAGE DAILY POWER LEVEL DAY- AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 l 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27: 0 12 0 28 0 f
13 0 29 0 14 0 30 0 ;
15 0 31 0 16 0 1
INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
I l
UNIT SHUTDOWNS AND POWER REDUCTIONS .
DOCKET NO. 50-286 .,
UNIT NAME INDIAN POINT NO. 3 DATE 04-01-95 COMPLETED BY T. Orlando TELEPHONE (914)736-8340 IPN-95-043 ',
ATTACHMENTI PAGE 3 of 4 REPORT MONTH MARCH 1995 METHOD OF NO. DATE TYPE DURATION REASON SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE 1 (HOURS) 2 DOWN EVENT CODE CODE ACTION TO PREVENT ' '
REACTOR 3 REPORT # 4 5 RECURRENCE 1 930226 F 744 B 1 93-005-02 IE INSTRU X THE UNIT WAS REMOVED FROM SERVICE IN ORDER TO PERFORM TESTING ON THE PLANT'S AMSAC SYSTEM.
1 2 3 4 5 F: Forced Reason: Method Exhibit - Instructions Exhibit - Same Source S: Scheduled A-Equipment 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D- Regulatory Restriction 4-Other (Explain) (NUREG - 0161)
i' !
p
DOCKET NO.- 50-286 l ,
IPN-95-043
^
l - l1- ATTACHMENT l ;
- ,. PAGE 4 of 4 l
SUMMARY
OF OPERATING EXPERIENCE l
1 l MARCH 1995' l i
t:
i
!- _ On March 5,1993, with the unit at hot shutdown, a decision was made by plant management to place the plant in the cold shutdown condition. The unit reached cold shutdown on March 7, at 1018 hours0.0118 days <br />0.283 hours <br />0.00168 weeks <br />3.87349e-4 months <br />. This
- j. decision was made in order to address plant administrative concerns, implement the " Performance improvement Plan" (PIP), and to perform plant maintenance which had originally been scheduled for a l planned outage in May,1993.
l The plant is addressing the administrative concerns using the Restart and Continuous Improvement Plan, which superceded the " Performance improvement Plan".
l The unit was off line for the entire reporting period.
s l
! l 1
t l
i: