ML20082J665

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1995 for Indian Point 3.W/
ML20082J665
Person / Time
Site: 05000246
Issue date: 03/31/1995
From: Leslie Hill, Orlando T
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IPN-95-043, IPN-95-43, NUDOCS 9504180347
Download: ML20082J665 (6)


Text

'

=

Indlin Point 3

, Nucle:r PowIr PI:nt P O. Box 215 e Buchanan, New York 10511 l 914 736.8001

  1. > NewYorkPower ki"L,a, tv Authority l

April 7,1995 i IPN 043 l 1

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Indian Point 3 Nuclear Power Plant Docket No. 50-286 License No. DPR-64 l Monthly Operatina Report for March 1995

Dear Sir:

The attached monthly operating report, for the month of March 1995, is hereby submitted in accordance with Indian Point 3 Nuclear Power Plant Technical Specification 6.9.1.4.

The Authority is making no commitments in this letter.

Very truly yours,

/ \

$ Hill l phesident Manager

' Indian Point 3 Nuclear Power Plant LMH/cbr Attachment cc: See next page l

<cesen

. U V .L c d 9504180347 950331 /

PDR ADOCK 05000246 f.:

R PDR

l l- ,

! Docket No. 50-286-l' IPN 95-043

. Page 2 of 2 -

l. cc: Thomas T. Martin

._ Regional Administrator Region i U.S. Nuclear Regulatory Commission

[ 475 Allendale Road l l King of Prussia, Pennsylvania 19406-1415_ '

U.S. Nuclear Regulatory Commission Resident inspectors' Office Indian Point 3 Nuclear Power Plant i

John J. McOscar, Director l

Division of Resource Management and Administration l Region I _

U.S. Nuclear Regulatory Commission  !

475 Allendale Road -

King of Prussia, Pennsylvania 19406-1415  ;

i INPO Records Center l 700 Galleria Parkway l Atlanta, Georgia 30339-5957 l

l 1

I e

, - , - - ~ p y -e .- , -, a- n p-

OPERATING DATA REPORT -  :

,. DOCKET NO. 50-286 l DATE 04-01-95 1 COMPLETED BY T. Orlando  !

TELEPHONE (914) 736-8340 .j IPN-95-043 ATTACHMENT I PAGE 1 of 4 OPERATING STATUS

1. Unit Name: Indian Point No. 3 Nuclear Power Plant
2. Reporting Period: March 1995
3. Licensed Thermal Power (MWt): 3025
4. Nameplate Rating (Gross MWe): 1013
5. Design Electrical Rating (Net MWe): 965
6. Maximum Dependable Capacity (Gross MWe): 1000

, 7. Maximum Dependable Capacity (Net MWe): 965

8. If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report Give Reasons:
9. PowerleveltoWhich Restricted,1f Any(Net MWe):

I 10. Reasons for Restrictions, if Any:

This Month Yr. to Date Cumulative -

11. Hours in Reporting Period 744 2160 '163.033 1
12. Number of Hours Reactor Was Critical 0 0 91.890.14'
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 0 0 89.462.16
15. Unit Reserve Shutdown Hours 0 0 0

~ 16. Gross Thermal Energy Generated (MWH) 0 0 254.069.702

17. Gross Electrical Energy Generated (MWH) 0 0 79.388.605
18. Net Electrical Generated (MWH) 0 'O 76.357.136
19. Unit Service Factor 0 0 54.9
20. Unit Availability Factor 0 0 54.9 1 21. Unit Capacity Factor (Using MDC Net) 0 0 49.7*

j 22. Unit Capacity Factor (Using DER Net) 0 0 48.5 Unit Forced Outage Rate 2 3.- 100 , 100 27.8

24. Shutdowns Scheduled Over Next 6 Months (Type,Date,and Duration of Each):

i

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 5/01/95 *
26. Units in Test Status (Prior to Commercial Operation):

i Forecast - Achieved I

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l

  • Weighted Average

i~ AVERAGE DAILY UNIT POWER LEVEL y, DOCKET NO. 50-286 UNIT IP-3 l

DATE 04-01-95 COMPLETED BY T. Orlando TELEPHONE (914) 736-8340.

IPN-95-043 ATTACHMENTI l

PAGE 2 of 4 i

l MONTH MARCH 1995 l

l . .

DAY: AVERAGE DAILY POWER LEVEL DAY- AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 l 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27: 0 12 0 28 0 f

13 0 29 0 14 0 30 0  ;

15 0 31 0 16 0 1

INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

I l

UNIT SHUTDOWNS AND POWER REDUCTIONS .

DOCKET NO. 50-286 .,

UNIT NAME INDIAN POINT NO. 3 DATE 04-01-95 COMPLETED BY T. Orlando TELEPHONE (914)736-8340 IPN-95-043 ',

ATTACHMENTI PAGE 3 of 4 REPORT MONTH MARCH 1995 METHOD OF NO. DATE TYPE DURATION REASON SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE 1 (HOURS) 2 DOWN EVENT CODE CODE ACTION TO PREVENT ' '

REACTOR 3 REPORT # 4 5 RECURRENCE 1 930226 F 744 B 1 93-005-02 IE INSTRU X THE UNIT WAS REMOVED FROM SERVICE IN ORDER TO PERFORM TESTING ON THE PLANT'S AMSAC SYSTEM.

1 2 3 4 5 F: Forced Reason: Method Exhibit - Instructions Exhibit - Same Source S: Scheduled A-Equipment 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D- Regulatory Restriction 4-Other (Explain) (NUREG - 0161)

i'  !

p

DOCKET NO.- 50-286 l ,

IPN-95-043

^

l - l1- ATTACHMENT l  ;

,. PAGE 4 of 4 l

SUMMARY

OF OPERATING EXPERIENCE l

1 l MARCH 1995' l i

t:

i

!- _ On March 5,1993, with the unit at hot shutdown, a decision was made by plant management to place the plant in the cold shutdown condition. The unit reached cold shutdown on March 7, at 1018 hours0.0118 days <br />0.283 hours <br />0.00168 weeks <br />3.87349e-4 months <br />. This

j. decision was made in order to address plant administrative concerns, implement the " Performance improvement Plan" (PIP), and to perform plant maintenance which had originally been scheduled for a l planned outage in May,1993.

l The plant is addressing the administrative concerns using the Restart and Continuous Improvement Plan, which superceded the " Performance improvement Plan".

l The unit was off line for the entire reporting period.

s l

! l 1

t l

i: