ML20082J665
| ML20082J665 | |
| Person / Time | |
|---|---|
| Site: | 05000246 |
| Issue date: | 03/31/1995 |
| From: | Leslie Hill, Orlando T POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| IPN-95-043, IPN-95-43, NUDOCS 9504180347 | |
| Download: ML20082J665 (6) | |
Text
'
Indlin Point 3
=
Nucle:r PowIr PI:nt P O. Box 215 e
Buchanan, New York 10511 914 736.8001
- > NewYorkPower ki"L,a, tv Authority April 7,1995 IPN 043 1
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Indian Point 3 Nuclear Power Plant Docket No. 50-286 License No. DPR-64 Monthly Operatina Report for March 1995
Dear Sir:
The attached monthly operating report, for the month of March 1995, is hereby submitted in accordance with Indian Point 3 Nuclear Power Plant Technical Specification 6.9.1.4.
The Authority is making no commitments in this letter.
Very truly yours,
/
\\
$ Hill phesident Manager
' Indian Point 3 Nuclear Power Plant LMH/cbr Attachment cc: See next page
<cesen
. U V.L c d 9504180347 950331
/
PDR ADOCK 05000246 f.:
R PDR
l l-Docket No. 50-286-l' IPN 95-043
. Page 2 of 2 -
l.
cc:
Thomas T. Martin
._ Regional Administrator Region i U.S. Nuclear Regulatory Commission
[
475 Allendale Road l
King of Prussia, Pennsylvania 19406-1415_
U.S. Nuclear Regulatory Commission Resident inspectors' Office Indian Point 3 Nuclear Power Plant John J. McOscar, Director Division of Resource Management and Administration l
Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406-1415 i
INPO Records Center l
700 Galleria Parkway Atlanta, Georgia 30339-5957 l
l 1
e
~
p y
-e a-n p-
OPERATING DATA REPORT -
DOCKET NO.
50-286 DATE 04-01-95 1
COMPLETED BY T. Orlando TELEPHONE (914) 736-8340
.j IPN-95-043 ATTACHMENT I PAGE 1 of 4 OPERATING STATUS 1.
Unit Name:
Indian Point No. 3 Nuclear Power Plant 2.
Reporting Period:
March 1995 3.
Licensed Thermal Power (MWt):
3025 4.
Nameplate Rating (Gross MWe):
1013 5.
Design Electrical Rating (Net MWe):
965 6.
Maximum Dependable Capacity (Gross MWe):
1000 7.
Maximum Dependable Capacity (Net MWe):
965 8.
If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report Give Reasons:
9.
PowerleveltoWhich Restricted,1f Any(Net MWe):
I
- 10. Reasons for Restrictions, if Any:
This Month Yr. to Date Cumulative -
11.
Hours in Reporting Period 744 2160
'163.033 1
- 12. Number of Hours Reactor Was Critical 0
0 91.890.14' 13.
Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 0
0 89.462.16
- 15. Unit Reserve Shutdown Hours 0
0 0
~ 16. Gross Thermal Energy Generated (MWH) 0 0
254.069.702
- 17. Gross Electrical Energy Generated (MWH) 0 0
79.388.605
- 18. Net Electrical Generated (MWH) 0
'O 76.357.136
- 19. Unit Service Factor 0
0 54.9
- 20. Unit Availability Factor 0
0 54.9 1
- 21. Unit Capacity Factor (Using MDC Net) 0 0
49.7*
j
- 22. Unit Capacity Factor (Using DER Net) 0 0
48.5 2 3.-
Unit Forced Outage Rate 100 100 27.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type,Date,and Duration of Each):
i
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 5/01/95
- 26. Units in Test Status (Prior to Commercial Operation):
i Forecast -
Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l
- Weighted Average
i ~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-286 y,
UNIT IP-3 l
DATE 04-01-95 COMPLETED BY T. Orlando TELEPHONE (914) 736-8340.
IPN-95-043 ATTACHMENTI PAGE 2 of 4 l
i l
MONTH MARCH 1995 l
l DAY: AVERAGE DAILY POWER LEVEL DAY-AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
l 2
0 18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27:
0 12 0
28 0
f 13 0
29 0
14 0
30 0
15 0
31 0
16 0
1 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
I l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-286 UNIT NAME INDIAN POINT NO. 3 DATE 04-01-95 COMPLETED BY T. Orlando TELEPHONE (914)736-8340 IPN-95-043 ATTACHMENTI PAGE 3 of 4 REPORT MONTH MARCH 1995 METHOD OF NO.
DATE TYPE DURATION REASON SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE 1
(HOURS) 2 DOWN EVENT CODE CODE ACTION TO PREVENT '
REACTOR 3 REPORT #
4 5
RECURRENCE 1
930226 F
744 B
1 93-005-02 IE INSTRU X THE UNIT WAS REMOVED FROM SERVICE IN ORDER TO PERFORM TESTING ON THE PLANT'S AMSAC SYSTEM.
i l
1 2
3 4
5 F: Forced Reason:
Method Exhibit - Instructions Exhibit - Same Source S: Scheduled A-Equipment 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)
(NUREG - 0161)
i' p
DOCKET NO.-
50-286 l
ATTACHMENT l IPN-95-043 l - l1-
^
PAGE 4 of 4 l
SUMMARY
OF OPERATING EXPERIENCE MARCH 1995' l
i t:
i
_ On March 5,1993, with the unit at hot shutdown, a decision was made by plant management to place the plant in the cold shutdown condition. The unit reached cold shutdown on March 7, at 1018 hours0.0118 days <br />0.283 hours <br />0.00168 weeks <br />3.87349e-4 months <br />. This j.
decision was made in order to address plant administrative concerns, implement the " Performance improvement Plan" (PIP), and to perform plant maintenance which had originally been scheduled for a l
planned outage in May,1993.
l The plant is addressing the administrative concerns using the Restart and Continuous Improvement Plan, which superceded the " Performance improvement Plan".
l The unit was off line for the entire reporting period.
s l
l t
l i: