Monthly Operating Rept for Mar 1995 for Indian Point 3.W/
ML20082J665
Person / Time
Site: 05000246
Issue date: 03/31/1995
From: Leslie Hill, Orlando T
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IPN-95-043, IPN-95-43, NUDOCS 9504180347
Download: ML20082J665 (6)


Text

'

Indlin Point 3

=

Nucle:r PowIr PI:nt P O. Box 215 e

Buchanan, New York 10511 914 736.8001

  1. > NewYorkPower ki"L,a, tv Authority April 7,1995 IPN 043 1

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Indian Point 3 Nuclear Power Plant Docket No. 50-286 License No. DPR-64 Monthly Operatina Report for March 1995

Dear Sir:

The attached monthly operating report, for the month of March 1995, is hereby submitted in accordance with Indian Point 3 Nuclear Power Plant Technical Specification 6.9.1.4.

The Authority is making no commitments in this letter.

Very truly yours,

/

\\

$ Hill phesident Manager

' Indian Point 3 Nuclear Power Plant LMH/cbr Attachment cc: See next page

<cesen

. U V.L c d 9504180347 950331

/

PDR ADOCK 05000246 f.:

R PDR

l l-Docket No. 50-286-l' IPN 95-043

. Page 2 of 2 -

l.

cc:

Thomas T. Martin

._ Regional Administrator Region i U.S. Nuclear Regulatory Commission

[

475 Allendale Road l

King of Prussia, Pennsylvania 19406-1415_

U.S. Nuclear Regulatory Commission Resident inspectors' Office Indian Point 3 Nuclear Power Plant John J. McOscar, Director Division of Resource Management and Administration l

Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406-1415 i

INPO Records Center l

700 Galleria Parkway Atlanta, Georgia 30339-5957 l

l 1

e

~

p y

-e a-n p-

OPERATING DATA REPORT -

DOCKET NO.

50-286 DATE 04-01-95 1

COMPLETED BY T. Orlando TELEPHONE (914) 736-8340

.j IPN-95-043 ATTACHMENT I PAGE 1 of 4 OPERATING STATUS 1.

Unit Name:

Indian Point No. 3 Nuclear Power Plant 2.

Reporting Period:

March 1995 3.

Licensed Thermal Power (MWt):

3025 4.

Nameplate Rating (Gross MWe):

1013 5.

Design Electrical Rating (Net MWe):

965 6.

Maximum Dependable Capacity (Gross MWe):

1000 7.

Maximum Dependable Capacity (Net MWe):

965 8.

If Changes Occur in Capacity Ratings (items Number 3 through 7) Since Last Report Give Reasons:

9.

PowerleveltoWhich Restricted,1f Any(Net MWe):

I

10. Reasons for Restrictions, if Any:

This Month Yr. to Date Cumulative -

11.

Hours in Reporting Period 744 2160

'163.033 1

12. Number of Hours Reactor Was Critical 0

0 91.890.14' 13.

Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 0

0 89.462.16

15. Unit Reserve Shutdown Hours 0

0 0

~ 16. Gross Thermal Energy Generated (MWH) 0 0

254.069.702

17. Gross Electrical Energy Generated (MWH) 0 0

79.388.605

18. Net Electrical Generated (MWH) 0

'O 76.357.136

19. Unit Service Factor 0

0 54.9

20. Unit Availability Factor 0

0 54.9 1

21. Unit Capacity Factor (Using MDC Net) 0 0

49.7*

j

22. Unit Capacity Factor (Using DER Net) 0 0

48.5 2 3.-

Unit Forced Outage Rate 100 100 27.8

24. Shutdowns Scheduled Over Next 6 Months (Type,Date,and Duration of Each):

i

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 5/01/95
26. Units in Test Status (Prior to Commercial Operation):

i Forecast -

Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION l

  • Weighted Average

i ~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-286 y,

UNIT IP-3 l

DATE 04-01-95 COMPLETED BY T. Orlando TELEPHONE (914) 736-8340.

IPN-95-043 ATTACHMENTI PAGE 2 of 4 l

i l

MONTH MARCH 1995 l

l DAY: AVERAGE DAILY POWER LEVEL DAY-AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

l 2

0 18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27:

0 12 0

28 0

f 13 0

29 0

14 0

30 0

15 0

31 0

16 0

1 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

I l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-286 UNIT NAME INDIAN POINT NO. 3 DATE 04-01-95 COMPLETED BY T. Orlando TELEPHONE (914)736-8340 IPN-95-043 ATTACHMENTI PAGE 3 of 4 REPORT MONTH MARCH 1995 METHOD OF NO.

DATE TYPE DURATION REASON SHUTTING LICENSEE SYSTEM COMPONENT CAUSE & CORRECTIVE 1

(HOURS) 2 DOWN EVENT CODE CODE ACTION TO PREVENT '

REACTOR 3 REPORT #

4 5

RECURRENCE 1

930226 F

744 B

1 93-005-02 IE INSTRU X THE UNIT WAS REMOVED FROM SERVICE IN ORDER TO PERFORM TESTING ON THE PLANT'S AMSAC SYSTEM.

i l

1 2

3 4

5 F: Forced Reason:

Method Exhibit - Instructions Exhibit - Same Source S: Scheduled A-Equipment 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)

(NUREG - 0161)

i' p

DOCKET NO.-

50-286 l

ATTACHMENT l IPN-95-043 l - l1-

^

PAGE 4 of 4 l

SUMMARY

OF OPERATING EXPERIENCE MARCH 1995' l

i t:

i

_ On March 5,1993, with the unit at hot shutdown, a decision was made by plant management to place the plant in the cold shutdown condition. The unit reached cold shutdown on March 7, at 1018 hours0.0118 days <br />0.283 hours <br />0.00168 weeks <br />3.87349e-4 months <br />. This j.

decision was made in order to address plant administrative concerns, implement the " Performance improvement Plan" (PIP), and to perform plant maintenance which had originally been scheduled for a l

planned outage in May,1993.

l The plant is addressing the administrative concerns using the Restart and Continuous Improvement Plan, which superceded the " Performance improvement Plan".

l The unit was off line for the entire reporting period.

s l

l t

l i: