ENS 54509
From kanterella
ENS Event | |
---|---|
14:15 Feb 3, 2020 | |
Title | Loss of Emergency Assessment Capability Due to Planned Tsc and Osc Upgrades |
Event Description | "At 0915 EST on February 3, 2020, planned upgrades to the Technical Support Center (TSC) and Operations Support Center (OSC) will begin. The work includes upgrades to furniture, carpet, telecommunications, celling tiles, and HVAC vent covers and the installation of new Audio-Visual equipment to include monitors, speakers, and microphones. The work duration is approximately eight weeks.
"If an emergency is declared requiring TSC and OSC activation during this period, the TSC and OSC will be staffed and activated at the alternate location in accordance with applicable site procedures. The Emergency Response Organization team has been notified of the TSC and OSC planned upgrades and the need to assemble and staff the alternate location during an emergency. "This is an eight-hour, non-emergency notification for a planned loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the work activity affects the functionality of an emergency response facility. "There is no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified." |
Where | |
---|---|
Oconee South Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-4.98 h-0.208 days <br />-0.0296 weeks <br />-0.00682 months <br />) | |
Opened: | Jason Orrey 09:16 Feb 3, 2020 |
NRC Officer: | Thomas Kendzia |
Last Updated: | Feb 3, 2020 |
54509 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 54509\u003C/a\u003E - \u003Ca href=\"/Oconee\" title=\"Oconee\"\u003EOconee\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ELoss of Emergency Assessment Capability Due to Planned Tsc and Osc Upgrades\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 54509 - Oconee\n","link":"","lat":34.79336388888889,"lon":-82.89360555555555,"icon":"/w/images/7/75/Duke_Energy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Unit 3 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 547712020-07-10T13:00:00010 July 2020 13:00:00
[Table view]10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Common Emergency Operations Facility Maintenance ENS 545092020-02-03T14:15:0003 February 2020 14:15:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Assessment Capability Due to Planned Tsc and Osc Upgrades ENS 495112013-11-07T17:00:0007 November 2013 17:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Technical Support Center Taken Out of Service for Planned Maintenance ENS 487702013-02-19T15:54:00019 February 2013 15:54:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Oconee Alert and Notification System Sirens Out of Service ENS 484072012-10-15T10:56:00015 October 2012 10:56:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Area Radiation Monitor Used for Emergency Assessment Failed ENS 482842012-09-06T00:06:0006 September 2012 00:06:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Inoperable Accident Radiation Monitors ENS 482652012-09-02T16:00:0002 September 2012 16:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Planned Outage of Emergency Operations Facility ENS 482642012-09-02T02:30:0002 September 2012 02:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Radiation Monitor Declared Inoperable ENS 422062005-12-15T14:30:00015 December 2005 14:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Siren Power ENS 410502004-09-17T14:30:00017 September 2004 14:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Siren Capability 2020-07-10T13:00:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_54509&oldid=3085526"