ML070590254

From kanterella
Revision as of 04:39, 13 July 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Fitness for Duty Program Performance Report for Period of July 1, 2006 Through December 31, 2006
ML070590254
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/20/2007
From: Harden P
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML070590254 (5)


Text

NMCC Palisades Nuclear Plant Committed to Nuclear Operated by Nuclear Management Company, LLC February 20, 2007 10 CFR 26.71 (d)U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Palisades Nuclear Plant Docket 50-255 License No. DPR-20 Fitness For Duty Program Performance Report In accordance with 10 CFR 26.71(d), Nuclear Management Company, LLC, is providing the Fitness For Duty Program Performance Report for the Palisades Nuclear Plant (PNP) for the period of July 1, 2006 through December 31, 2006.Enclosures 1 and 2 summarize the test results at the PNP.Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Paul A. Harden Site Vice President, Palisades Nuclear Plant Nuclear Management Company, LLC Enclosures (2)CC Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC 27780 Blue Star Memorial Highway Covert, Michigan 49043-9530 Telephone:

269.764.2000 ENCLOSURE 1 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE

SUMMARY

July 1 though December 31, 2006 1. MANAGEMENT

SUMMARY

A. RANDOM TESTING During this reporting period, Nuclear Management Company, LLC conducted a total of 222 random tests with the following results: Donor Group Employees Random Tests Results 164 Random testing identified no positive drug/alcohol results.Random testing identified no positive drug/alcohol results.Contractors 58 The percentage of random tests conducted during this period was 50%.The positive contractors:

drug/alcohol rate for 2006 indicates a stable trend for employees and Random Tests Employees CN's Positive Rate Employees CN's Leading Substance Cocaine THC 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 629 891 767 496 536 438 482 366 390 157 350 216 120 208 140 53 131 122 156 219 77 186 0.2%0.2%0.5%0.2%0.0%0.0%0.0%0.3%0.2%0.0%0.3%0.9%0.8%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%1 2 3 3-" 1"" 1"" 1 B. PRE-ACCESS TESTING A total of 93 pre-access tests were conducted during this reporting period. Of those tested, one individual tested positive for cocaine and one individual tested positive for amphetamines.

Those individuals were denied access as a result.Page 1 of 2 ENCLOSURE 1 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE

SUMMARY

July 1 through December 31, 2006 C. FOR CAUSE/POST ACCIDENT TESTING One post-accident test was required during the reporting period. This test was given because of an accident requiring medical attention.

The results of the test were negative.D. FOLLOW-UP TESTING No individuals tested positive during follow-up testing.E. APPEALS The appeal process was not initiated during this reporting period.2. REPORTABLE EVENTS UNDER 10 CFR 26.73 During this six-month interval, PNP encountered no fitness for duty events that required reporting under 10 CFR 26.73.Page 2 of 2 ENCLOSURE 2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA July 1 through December 31, 2006 Nuclear Management Company, LLC December 31, 2006 Company 6 Months Ending Palisades Nuclear Plant Location Brian Rabideau 269-764-2575 Contact Name Phone (include Area Code)Cutoffs: Screen/Confirmation (ng/ml) : AppendixA to 10 CFR 26 Marijuana N/A Amphetamines N/A Cocaine N/A Phencyclidine N/A Opiates N/A Alcohol (% BAC)* /*Any detectable amount for situations other than random.Long-Term Short-Term Testing Results Licensee Contractor Contractor Employees Personnel Personnel Average Number With Unescorted Access 620 N/A 267#Tested #Positive

  1. Tested #Positive
  1. Tested #Positive Categories Pre-Access 32 0 --- --- 61 2 FOR Post-Accident 0 0 --- --- 1 0 CAUSE Observed 0 0 --- --- 0 0 Behavior Random 164 0 --- --- 58 0 Follow-up 30 0 --- --- 6 0 Other 0 0 --- --- 0 0 TOTAL 226 0 --.--- 126 2 Page 1 of 2 ENCLOSURE 2 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE DATA July 1 through December 31, 2006 Breakdown of Confirmed Positive Tests for Specific Substances Amphe- Phency- Refusal Marijuana Cocaine Opiates tamines clidine Alcohol to Test 1 2 3 4 5 Licensee Employees Long-Term Contractors Short-Term Contractors 1 1 Total f 1 _ j 1itlifI ttjII2 Page 2 of 2