MONTHYEARML0722002582007-07-31031 July 2007 License Amendment Request to Revise Technical Specification 6.6.5, Core Operating Limits Report Project stage: Other 2CAN070701, Emergency Core Cooling System Performance Analysis.2007-07-31031 July 2007 Emergency Core Cooling System Performance Analysis. Project stage: Request 2CAN030801, Response to Request for Additional Information, License Amendment Request to Revise Technical Specification 6.6.5, Core Operating Limits Report2008-03-11011 March 2008 Response to Request for Additional Information, License Amendment Request to Revise Technical Specification 6.6.5, Core Operating Limits Report Project stage: Response to RAI ML0808400152008-03-26026 March 2008 Issuance of Amendment No. 276, Revise Technical Specification 6.6.5, Core Operating Limits Report, to Add Analytical Methods to Support Implementation of Next Generation Fuel Project stage: Approval ML0808400232008-03-26026 March 2008 Tech Spec Pages for Amendment No. 276, Revise Technical Specification 6.6.5, Core Operating Limits Report, to Add Analytical Methods to Support Implementation of Next Generation Fuel Project stage: Other 2008-03-11
[Table View] |
|
---|
Category:Letter type:
MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102203, Cycle 31 Core Operating Limits Report2022-10-24024 October 2022 Cycle 31 Core Operating Limits Report 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-09-29029 September 2022 Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-09-0808 September 2022 Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-08-24024 August 2022 Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-07-20020 July 2022 Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN072201, Registration of Cask Use2022-07-14014 July 2022 Registration of Cask Use 0CAN062202, Registration of Cask Use2022-06-0909 June 2022 Registration of Cask Use 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-06-0202 June 2022 Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-0352022-05-31031 May 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035 2024-01-17
[Table view] |
Text
2CAN030801
March 11, 2008
U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Response to Request for Additional Information License Amendment Request to Revise Technical Specification 6.6.5, Core Operating Limits Report
Arkansas Nuclear One, Unit 2
Docket No. 50-368 License No. NPF-6
REFERENCE:
- 1. Entergy Letter to NRC dated July 31, 2007 License Amendment Request to Revise Technical Specification 6.6.5, Core Operating
Limits Report
Dear Sir or Madam:
By letter dated July 31, 2007 (Reference 1), Entergy Operations, Inc. (Entergy) proposed to revise the Arkansas Nuclear One, Unit 2 (ANO-2) Technical Specification 6.6.5 to add new analytical methods to support the implementation of Next Generation Fuel (NGF).
During the review of the Reference 1 submittal, a question was raised from the Reactor Systems Branch. This question (Request for Additional Information (RAI)) was informally transmitted to Entergy on February 7, 2008. Several discussions with the NRC have taken place since transmittal of the RAI. The RAI and Entergy's response to the RAI is included in Enclosure 1.
There are no technical changes proposed. The conclusions of the original no significant hazards consideration included in Reference 1 are not affected by any information contained
in this supplemental letter.
This letter contains one new commitment. This commitment is identified in Attachment 2. Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4619 Dale E. James Manager, Licensing Arkansas Nuclear One
2CAN030801 Page 2 of 2
If you have any questions or require additional information, please contact Bob Clark at (479) 858 4663.
Sincerely, DEJ/rwc
Attachments: 1. Response to Request for Additional Information Related to the COLR Listing of Methodologies
- 2. List of Regulatory Commitments
cc: Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission
Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064
NRC Senior Resident Inspector
Arkansas Nuclear One P.O. Box 310
London, AR 72847 U.S. Nuclear Regulatory Commission Attn: Mr. Alan B. Wang MS O-7 D1 Washington, DC 20555-0001 Mr. Bernard R. Bevill
Director Division of Radiation Control and Emergency Management Arkansas Department of Health & Human Services P.O. Box 1437 Slot H-30 Little Rock, AR 72203-1437
ATTACHMENT 1 2CAN030801 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE COLR LISTING OF METHODOLOGIES to 2CAN030801
Page 1 of 1 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE COLR LISTING OF METHODOLOGIES NRC Question:
Under TAC MD6220, the proposed TS 6.6.5 COLR, addition of new methods to COLR, in the July 31, 2007 submittal, there are five new methodologies to be added to the COLR TS to support the coming cycle-specific operating parameters. However, many methods are proposed to support the same parameter. We would like the licensee to clarify that: (1) the proposed changes are applicable to the coming cycle; and (2) how to apply the methods proposed to support same parameter such as 3 methods for MTC, 3 methods for Azimuthal Power Tilt, 4 methods for ASI, 3 methods for Linear Heat Rate, and 3 methods for DNBR.
Response:
In the upcoming Cycle 20, Entergy intends to implement the Next Generation Fuel (NGF) design. The proposed changes to TS 6.6.5 are needed to support the implementation of NGF.
In response to a portion of the RAI regarding an explanation of the connection or relationship between the referenced approved methodologies, the relationship was addressed
satisfactorily during conference calls between the NRC staff reviewer, ANO-2 Project Manager (PM), Westinghouse and Entergy personnel.
Based upon the understanding of the relationship between the large number (10) of core operating limit report (COLR) references that presently exist in TS 6.6.5 and the additional
five (5) references being proposed, the NRC Staff requested Entergy to commit to evaluate the COLR references and propose a TS change within the next 12 months to minimize the number of references. As an example, there are four COLR references that have a relationship with the COLR parameter limit of Shutdown Margin (TS 3.1.1.1.and 3.1.1.2), in that, three of the references describe current methodology being used. However, the other reference associated with Shutdown Margin has been superseded by more recently implemented methodology and thus, can be evaluated for deletion.
Therefore, to satisfy this condition, Enterg y commits to evaluate other similar plant's Technical Specification (TS) methodology references that reflect NRC approved methods used in establishing the COLR parameter limits. Based on that evaluation, Entergy will propose a change to TS 6.6.5, to minimize the number of references consistent with the guidance provided in Generic Letter 88-16, "Removal of Cycle-Specific Parameter Limits from Technical Specifications." This proposed TS change will be submitted within 12 months following NRC issuance of the approved amendm ent for the current requested change to TS 6.6.5. This regulatory commitment is contained in Attachment 2.
ATTACHMENT 2 2CAN030801 LIST OF REGULATORY COMMITMENTS to 2CAN030801
Page 1 of 1 LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Entergy in this document.
Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
TYPE (Check one) COMMITMENT ONE-TIME ACTION CONTINUING COMPLIANCE SCHEDULED COMPLETION DATE Entergy commits to evaluate other similar plant's Technical Specification (TS) methodology references that reflect NRC approved methods used in establishing the COLR parameter limits. Based on that evaluation, Entergy will propose a change to
TS 6.6.5, to minimize the number of references consistent with the guidance
provided in Generic Letter 88-16, "Removal of
Cycle-Specific Parameter Limits from Technical Specifications." This proposed TS change will be submitted within 12 months
following NRC issuance of the approved amendment for the current requested change
to TS 6.6.5.
X Within 12 months following NRC issuance of the approved amendment for
the current
requested change to TS 6.6.5.