Official Exhibit - ENT000403-00-BD01 - Excerpt from NL-09-079, Letter from Fred Dacimo, Entergy, to NRC, Reply to Request for Additional Information Regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Ev
ML12339A716
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 06/12/2009
From: Dacimo F
Entergy Nuclear Northeast
To:
Office of Nuclear Reactor Regulation
SECY RAS
References
RAS 22426, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML12339A716 (4)


Text

ENT000403 Submitted: May 9, 2012 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of

Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3)

ASLBP #:07-858-03-LR-BD01 Docket #:05000247 l 05000286 Exhibit #:

Identified:

Admitted: Withdrawn:

Rejected: Stricken: Other: ENT000403-00-BD01 10/15/2012 10/15/2012

!¥" 0 >-o

",t$'r., --***'" ( .\

Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel (914) 788-2055 NL-09-079 June 12, 2009 Fred Dacimo Vice President License Renewal U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

REFERENCES:

Dear Sir or Madam:

Reply to Request for Additional Information Regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event Indian Point Nuclear Generating Unit Nos. 2 & 3 Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64 1. NRC Letter dated May 20, 2009, "Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application

-Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event Entergy Nuclear Operations, Inc is providing, in Attachment I, the additional information requested in the referenced letter pertaining to NRC review of the License Renewal Application for Indian Point 2 and Indian Point 3. The additional information provided in this transmittal addresses staff questions regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event. Attachment 2 consists of Revision 9 to the list of regulatory commitments.

If you have any questions, or require additional information, please contact Mr. Robert Walpole at 914-734-6710.

I declare under penalty of perjury that the foregoing is true and correct. Executed on lP/INo9 . Sincerely, --W (

f.

FRD/dmt NL-09-079 Page 2 of 2

Attachment:

1. Reply to for Additional Information Regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event 2. List of Regulatory Commitments, Revision 9 cc: Mr. Samuel J. Collins, Regional Administrator, NRC Region I . Mr. Sherwin E. Turk, NRC Office of General Counsel, Special Counsel Ms. Kimberly Green, NRC Safety Project Manager Mr. Kenneth Chang, NRC Branch Chief, Engineering Review Branch I Mr. John Boska, NRR Senior Project Manager Mr. Paul Eddy, New York State Department of Public Service NRC Resident Inspector's Office Mr. Francis J. Murray, President and CEO, NYSERDA ATTACHMENT 1 TO NL-09-079 Reply to Request for Additional Information Regarding Offsite Power, Refueling Cavity, and Unit 2 Auxiliary Feedwater Pump Room Fire Event ENTERGY NUCLEAR OPERATIONS, INC. INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286 Table 3.4.2-5-3-IP2 Circulating Water System (CIRC) Intended Aging Effect Component Type Function Material Environment Requiring Management Pressure Change of EXQansion joint bounda!:y Elastomer Air -outdoor (ext) material QroQerties Pressure NGAe Piping Carbon steel Soil (ext) boundary Loss of material Pressure NGAe Piping Carbon steel Air outdoor (ext) boundary Loss of material Piping Pressure Carbon steel Raw water (int) NGAe boundary Loss of material Pressure NGRe Pump casing boundary Carbon steel Air-outdoor (ext) Loss of material Pump casing Pressure Carbon steel Raw water (int) NGAe boundary Loss of material Pressure PumQ casing Carbon steel Raw water (ext) Loss of material bounda!:y Aging Management NUREG-Programs 1801 Vol. 2 Item Periodic Surveillance

--and Preventive Maintenance NGAe VIII.E-1 Buried PiQing And Tanks (S-01 ) InsQection NGAe VIII.H-8 External Surfaces (S-41 ) Monitoring NGAe VIII.G-36 Periodic Surveillance (S-12) and Preventive Maintenance NGAe VIII.H-8 External Surfaces (S-41 ) Monitoring NGAe VIII.G-36 Periodic Surveillance (S-12) and Preventive Maintenance Periodic Surveillance VIII.G-36 and Preventive (S-12) Maintenance Attachment 1 NL-09-079 Page 22 of 51 Table 1 Item Notes --400 -2 3.4.1-11 400 Q 3.4.1-28 400 3.4.1-8 400 3.4.1-28 400 3.4.1-8 400 3.4.1-8 400