V. C. Summer Construction Status and Lesson Learned AD Torres
ML13309A859
Person / Time
Site: Summer  South Carolina Electric & Gas Company icon.png
Issue date: 11/05/2013
From:
South Carolina Electric & Gas Co
To:
Office of New Reactors
Bloom S, NRO/DCIP/IGCB, 415-2431
References
Download: ML13309A859 (26)


Text

VCSummerConstructionStatus V C Summer Construction Status and Lesson LearnedAD Torres Unit 2 & 3 Construction Status jil Ma j or M ilestones*Completed Unit 2 Concrete Basemat

  • Unit 2 Pouring of Major Auxiliary Building Walls
  • Set U2 containment vessel bottom head FbiddSU2CddTbi Bld Sl*F a b r i cate d an d Set U2 C on densers an d T ur bi ne Bld Stee l*Fabricated and Set Reactor Cavity Module
  • ReceivedUnit2Reactorvesselonsite
  • Received Unit 2 Reactor vessel on site*Installed Unit 3 basematrebar and completed BasematPour iil()Un i t 2 F irst Nuc lear Concrete (FNC)*First safety-related nuclearconcrete nuclear concrete placed in over 30 years*7,000 yds 3 of continuously placed concreteconcrete*Placement began on March 9, 2011 and ltditl l as t e d approx i ma t e l y 52 hours6.018519e-4 days <br />0.0144 hours <br />8.597884e-5 weeks <br />1.9786e-5 months <br /> Setting of U2 CR10 Settin g of Unit2 Containment Vessel Bottom Head g (CVBH)*Set Date: 05/22/13
  • Design Weight: 936 Tons
  • Linear Feet of Weld: 2,253LiFtfRidWld22
  • Li near F ee t o f R epa i re d W e ld: 22*Weld Acceptance Rate: 99.02%

Settin g of U2 CVBH g

U2ContainmentVessel(CV)Rings U2 Containment Vessel (CV) RingsCV Lower Ring is made up of:

FC*F our Courses*A lower and an Upper Equipment Hatch

  • A lower and an Upper Personnel Hatch ff*An external Sti ff enerCVLower RingCV Middle Ring is made up of
  • Four Courses
  • AninternalStiffenerCV Middle Ring An internal Stiffener U2 Containment Vessel Rin g 1 Coatin g s ggSteel surface preparation for inorganic zinc applicationInorganic zinc application in progress on U2 CV Ring 1 Unit3ContainmentVesselBottomHead(CVBH)

Unit 3 Containment Vessel Bottom Head (CVBH)June 2013October2013October 2013 Inside Containment CB65RtCltDiTkR CB66RCDT/RtCttP CB65 -R eac t or C oo l an t D ra i n T an k R oom CB66 -RCDT/ R eac t or C ompar t men t Passageway CB65 CA04 CB66 Unit 2 CA04 Module

  • Reactor Vessel Cavity
  • Dimensions: 21'-0" W x 26'-6" H
  • Approx. Design Weight: 90,000 lbs.
  • Approx. 7,661 linear feet of weld
  • Installed1436shearstudsInstalled 1 , 436 shear studs Unit 2 CA04 Module
  • Lift and set with the Heavy Lift Derrick (HLD)
  • Date:09/27/13Date: 09/27/13 Ui2AiliWllPl U n i t 2 A ux iliary W a ll Placements*16feettall3feetthick
  • 16 feet tall , 3 feet thick*Top Elevation is 82'6"
  • Line I, Area 5 completed 8/24/13*Line I, Area 2-3 completed 9/28/13 9/28/13*Line I, Area 4-7 completed 10/17/13 Unit 2 Aux Building Rebar InstallationColumn Lines I, 2, 4, 5, 11, and Q, up to El 82' 6" is substantially complete ColumnLineQColumnLine11lookingeasttowest Column Line Q Column Line 11 , looking east to west.

U2 TB Ma j or Com ponent Installation jpCondenser B Lower Shell July 2013700 TonsSouthTGSupportCH80August2013 South TG Support CH80 August 2013650 Tons U2 TB Ma j or Com ponent Installation jpCenterTGSupportCH81ACtTGStCH81BCenter TG Support CH81A October 2013220 Tons C en t er TG S uppor t CH81B October 2013220 Tons U2 TB Ma j or E q ui pment DeliveriesjqpDeaerator MSRLP Turbine Rotor Unit3Basemat Unit 3 BasematUnit 3 Basemat in June 2013Unit 3 Basemat in Oct 2013 Ui3BRbIlli U n i t 3 Basemat R e b ar Insta ll at i onShield Building Rebar, looking NorthtoSouthBattery Room Rebar , looking westtoeast North to Southwest to east Ui3B U n i t 3 Base mat pour Unit2CA20Module Unit 2 CA20 Module*Approx. 85% of sub-modules have been dlid d e livere d*Assembly is ongoing within the Module Assembly Building (MAB)

  • To date 11 wall sub-modules have been erected on the platen ToshibaMainStepUpTransformers

-230/26kVToshiba Main Step Up Transformers 230/26kVAssembly weight with oil -529,800lbs eachMain Tanks

  • 3 in service, 1 spare
  • 12,720 gallons each
  • StoredAirFilledConservator Tanks
  • Oil reservoir
  • 730 gallons each
  • StoredAirFilledStored Air FilledStored Air Filled VCSummerUnits2and3Switchyard VC Summer Units 2 and 3 Switchyard
  • Online February 12, 2013
  • Connection of 230kV transmission lines for SCE&G, and Santee Cooper
  • Lar gest switch yard in the SCE&G S ystemgyy LLd L esson L earne dCditifthldtd
  • C oor di na tion o f groups t o h e l p un ders t an d ITAAC*Strengthening the procedural controls of ITAAC programs-Roles and responsibilities for groups

-Stakeholder buy in

  • Review of corrective action programs LLd L esson L earne dUdtdidditifITAACi
  • U n ders t an ding an d coor di na tion o f ITAAC i ssues away from site.

-Vendor inspections(NRC and Consortium)

-Vendor corrective actions that have a material ffITAAC e ff ect ITAAC*Development of a common understanding of what is meant by material effects on an ITAAC's acceptance criteria.