0CAN061604, Confirmatory Action Letter

From kanterella
Revision as of 01:31, 20 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Confirmatory Action Letter
ML16174A082
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 06/22/2016
From: Bakken A
Entergy Services
To: Dapas M
Document Control Desk, NRC Region 4
References
0CAN061604
Download: ML16174A082 (2)


Text

Entergy Services, Inc. 1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5440 A. Christopher Bakken, III Executive Vice President, Nuclear Operations & Chief Nuclear Office

0CAN061604

June 22, 2016

Mr. Marc L. Dapas

Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511

Subject:

Confirmatory Action Letter Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6

Reference:

1. NRC Letter to Entergy, Confirmatory Action Letter, dated June 17, 2016 (0CNA061604) (ML16169A193) 2. Entergy Letter to NRC, ANO Comprehensive Recovery Plan, dated May 17, 2016 (0CAN051602) (ML16139A059)

Dear Mr. Dapas:

On June 17, 2016, the Nuclear Regulatory Commission (NRC) issued a Confirmatory Action Letter for Arkansas Nuclear One (ANO), Units 1 and 2 (Reference 1). This letter acknowledges receipt of the Confirmatory Action Letter on behalf of Entergy Operations, Inc. (Entergy).

On May 17, 2016, Entergy transmitted a Comprehensive Recovery Plan to address the issues that have led to the decline in ANO performance. This plan is based upon a thorough evaluation of those weaknesses, their causes, and related safety culture aspects, as well as insights from the NRC 95003 inspection. The goal of the plan is to return ANO to excellent performance, with a focus on nuclear safety as the overriding priority. The plan includes measures to ensure that it is rigorously implemented and closely monitored for effectiveness, and contains elements designed to achieve sustainable improvement for the long term.

As discussed in your June 17, 2016 telephone call with Jeremy Browning, ANO Site Vice President, Entergy acknowledges the commitments to implement the actions in the following six inspection focus areas as outlined in the Confirmatory Action Letter by the specified dates.

0CAN061604 Page 2 of 2

1. Significant Performance Deficiencies - October 2017
2. Identification, Assessment, and Correction of Performance Deficiencies - October 2017
3. Human Performance - June 2018
4. Equipment Reliability and Engineering Programs - June 2018
5. Safety Culture - December 2016 6. Service Water System Self-Assessment - December 2016

We will keep you fully informed of our progress as we implement this plan. Additionally, Entergy acknowledges that written notification is required if for any reason Entergy cannot complete the actions in these six inspection focus areas within the specified schedule or if the actions cannot be completed as outlined.

The safety, security, and reliability of our nuclear plants is our top priority and the entire Entergy corporation is committed to return Arkansas Nuclear One to one of the industry's strongest performers. If you need any additional information, please contact me.

This letter contains no new commitments.

Sincerely,

ORIGINAL SIGNED BY A.CHRISTOPHER BAKKEN, III

ACB/slp cc: U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847

U. S. Nuclear Regulatory Commission Attn: Mr. Stephen Koenick MS O8B1A One White Flint North 11555 Rockville Pike

Rockville, MD 20852