MONTHYEARML0803500372008-01-28028 January 2008 Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C Project stage: Request NOC-AE-800230, Submittal of Cycle 15 Core Operating Limits Report2008-05-0707 May 2008 Submittal of Cycle 15 Core Operating Limits Report Project stage: Request ML0814006472008-05-27027 May 2008 Request for Additional Information, License Amendment Request, Revise TS 3.3.1, Reactor Trip Instrumentation, to Establish Required Action for Inoperable Extended Range Neutron Flux Instrumentation Project stage: RAI NOC-AE-08002319, Response to RAI Revision to Proposed Amendment to TS 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C2008-07-28028 July 2008 Response to RAI Revision to Proposed Amendment to TS 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C Project stage: Response to RAI ML0821802302008-07-28028 July 2008 Response to RAI Revision to Proposed Amendment to TS 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C Project stage: Response to RAI NOC-AE-08002351, Revision 2 to Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C2008-09-25025 September 2008 Revision 2 to Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C Project stage: Other ML0827700682008-09-25025 September 2008 To Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C Project stage: Other NOC-AE-08002354, Request to Defer Part of Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C2008-09-30030 September 2008 Request to Defer Part of Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C Project stage: Other ML0827601312008-09-30030 September 2008 Generic Fundamentals Examination Results Project stage: Request ML0828001782008-09-30030 September 2008 Request to Defer Part of Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action C Project stage: Other ML0828102862008-10-16016 October 2008 License Amendment Nos. 187 and 174, Revise TS 3.3.1, Reactor Trip Instrumentation, to Establish Required Action for Inoperable Extended Range Neutron Flux Instrumentation Project stage: Other ML0831804402008-11-17017 November 2008 Corrections to Amendments 187 and 174 Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Project stage: Other NOC-AE-08002363, Supplement to Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation2008-11-24024 November 2008 Supplement to Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation Project stage: Supplement ML0833703062008-11-24024 November 2008 Supplement to Proposed Amendment to Technical Specification 3.3.1 Required Action for Inoperable Extended Range Neutron Flux Instrumentation Project stage: Supplement ML0901206542009-01-28028 January 2009 License Amendment Nos. 189 and 177, Revise Action 5 in TS Table 3.3-1 to Add Remedial Actions, Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Project stage: Other 2008-05-27
[Table View] |
Text
Nuclear Operating Company South Teams Project EFectn'c Generabtng Stabton PO. Box 28Y9 Wadsworth, Texas 77483 xVVV September 30, 2008 NOC-AE-08002354 1OCFR50.90 U. S. Nuclear Regulatory Commission Attention:
Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Request to Defer Part of Proposed Amendment to Technical Specification
3.3.1 Required
Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Snecification 3.4.1.4.2 Action c (TAC Nos. MD8003. MID8004)
Reference:
- 1. Letter dated September 25, 2008, from Charles T. Bowman, STPNOC, to the NRC Document Control Desk, "Revision to Proposed Amendment to Technical Specification
3.3.1 Required
Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action c" (NOC-AE-0800235 1)2. Letter dated January 28, 2008, from Charles T. Bowman, STPNOC, to the NRC Document Control Desk, "Proposed Amendment to Technical Specification
3.3.1 Required
Action for Inoperable Extended Range Neutron Flux Instrumentation and Technical Specification 3.4.1.4.2 Action c" (NOC-AE-07002234, ML080350037)
In Reference 1, STP Nuclear Operating Company submitted a revised License Amendment Request (LAR) for approval by the Nuclear Regulatory Commission (NRC). In order to support the STP Unit 2 Fall Outage, this letter-requests that the NRC approve proposed ACTION 5.a. to, Technical Specification 3.3.1, Functional Unit 7 for the extended range neutron flux instrumentation for the one less than minimum channels operable condition and approve the proposed change to ACTION c. to Technical Specification 3.4.1.4.2.
The change to Technical Specification TS 3.4.1.4.2 is an administrative change that does not affect any technical requirements.
STPNOC requests that approval of proposed ACTION 5.b. to Technical Specification 3.3.1, Functional Unit 7 for the two less than minimum channels operable condition be deferred until additional information is provided to the staff.32366875 NOC-AE-08002354 Page 2 of 3 This change to defer approval of part of the proposed amendment does not affect the determination of no significant hazards provided in the original LAR (Reference 2).There are no commitments in this submittal.
If there are any questions regarding the proposed amendment, please contact Ken Taplett at (361) 972-8416 or me at (361) 972-7298.kjt NOC-AE-08002354 Page 3 of 3 cc: (paper copy)(electronic copy)Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 612 East Lamar Blvd, Suite 400 Arlington, Texas 76011-4125 Mohan C. Thadani Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (MS 7 D1)11555 Rockville Pike Rockville, MID 20852 Senior Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MNl16 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 Richard A. Ratliff Bureau of Radiation Control Texas Department of State Health Services 1100 West 49th Street Austin, TX 78756-3189 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP Mohan C. Thadani U. S. Nuclear Regulatory Commission Kevin Howell Catherine Callaway Jim von Suskil NRG South Texas LP Ed Alarcon J. J. Nesrsta R. K. Temple Kevin Pollo City Public Service Jon C. Wood Cox Smith Matthews C. Kirksey City of Austin