Co., Submittal of Emergency Plan Revision
ML18065A202
Person / Time
Site: Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Byron, Three Mile Island, Braidwood, Limerick, Ginna, Clinton, Quad Cities, LaSalle, 07201036  Constellation icon.png
Issue date: 02/27/2018
From: David Helker
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
NMP1L3206, RS-18-024, TMl-18-030
Download: ML18065A202 (4)


Text

200 Exelon Way Exelon Generation Kennett Square. PA 19348 www.exeloncorp.com 1 O CFR 50.54(q)(5) 10 CFR 50.4 10 CFR 72.44(f) RS-18-024 NMP1L3206 TMl-18-030 February 27, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-72 and NPF-77 NRG Docket Nos. STN 50-456, 50-457, and 72-73 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRG Docket Nos. 50-454, 50-455, and 72-68 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRG Docket Nos. 50-317 and 50-318 Calvert Cliffs Independent Spent Fuel Storage Installation Materials License No. SNM-2505 NRG Docket No. 72-8 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRG Docket No. 50-461 Dresden Nuclear Power Station, Units 1, 2, and 3 Facility Operating License No. DPR-2 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRG Docket Nos.50-010, 50-237. 50-249. and 72-37 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 NRG Docket Nos. 50-373. 50-374. and 72-70 )ftf!S . ;Jfvf 55 Z-0 ;ville (Jfvl 55 L_ U.S. Nuclear Regulatory Commission Emergency Plan Revision February 27, 2018 Page 2

Subject:

Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 NRG DocketNos.

50-352, 50-353,.and 72-65 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 NRG Docket Nos. 50-220, 50-410, and 72-1036 Peach Bottom Atomic Power Station, Units 1, 2, and 3 Facility Operating

[Possession Only]Ucense No. DPR-12 Renewed Facility Operating,Ucense Nos. DPR-44 and DPR-56 NRG Docket Nos. 50-171, 50-277, 50-278 and 72-79 Quad*Cities Nuclear Power Station,,Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRG Docket Nos. 50-254, 50-265, and 72-53 R.E. Ginna Nuclear Power Plant Renewed Facility Operating_

License No. DPR-18 NRG Docket Nos. 50-244 and 72-67 Three Mile Island Nuclear Station,_Uhit 1 Renewed Facility Operating.

License No. DPR-50 NRG Docket No. 50-289 Three Mile Island Nuclear Station, Unit 2 Facility Possession-Only License No. DPR-73 NRG Docket No. 50-320 Exelon Generation Company Emergency Plan Revision In accordance with 1 O CFR 50.4(b)(5), "Emergency Plan and related submissions," Exelon Generation Company, LLC (EGG) is submitting the Emergency Plan revision listed in the table below for the cited facilities.

  • I Procedure No. Revision Title EP-AA-1000 29 Exelon Nuclear Standardized Radiological Emergency Plan The changes to the Emergency Plan were evali.lated*i.mder the requirements of 1 O CFR 50.54(q) and were determined not to result in a reduction in the effectiveness of the Emergency Plan for the cited plants. This notification is befng submitted within 30 days of implementation of the Emergency Plan changes as required by 1 O CFR 50.54(q)(5).

The changes continue to meet the applicable planning standards established in 1 O CFR 50.47(b) and 1 O CFR 50, Appendix E. '

U.S. Nuclear Regulatory Commission Emergency Plan Revision February 27, 2018 Page 3 This submittal also satisfies the reporting requirements associated with 1 O CFR 72.44(f), which stipulates that within six months after any change is made to the Emergency Plan, the licensee shall submit a report containing a description of the changes to the Director, D.ivision of Spent Fuel Management.

In addition, as required by 10 CFR 50.54(q)(5), this submittal includes a summary analysis of the changes to the Emergency Plan in Attachment

1. Attachment 2 includes a copy of the Emergency Plan revision.

There are no regulatory commitments in this submittal.

If you have any questions or require additional information, please contact Richard Gropp at (610) 765-5557.

Respectfully, David P. Helker Manager, Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments:

1. 1 O CFR 50.54(q)(5)

Change Summary Analysis 2. EP-AA-1000, Revision 29, "Exelon Nuclear Standardized Radiological Emergency Plan" cc: w/ Attachment 1 only Regional Administrator

-NRC Region .Ill Regional Administrator-NRC Region I Director, NRC Division of Spent Fuel Management, ONMSS NRC Senior Resident Inspector

-Braidwood Station NRC*Senior Resident Inspector

-Byron Station NRC Senior Resident Inspector

-Calvert Cliffs Nuclear Power Plant NRC Senior Resident Inspector

-Clinton Power Station NRC Senior Resident Inspector

-Dresden Nuclear Power Station NRC Senior Resident Inspector

-LaSalle County Station NRC Senior Resident Inspector

-Limerick Generating Station NRC Senior Resident Inspector

-Nine Mile Point Nuclear Station NRC Senior Resident Inspector

-Peach Bottom Atomic Power Station NRC Senior Resident Inspector

-Quad Cities Nuclear Power Station NRC Senior Resident Inspector

-R. E. Ginna Nuclear Power Plant NRC Senior Resident Inspector

-Three Mile Island Nuclear Station NRC Project Manager, NRR -Braidwood Station NRC Project Manager, NRR -Byron Station NRC Project Manager, NRR -Calvert Cliffs Nuclear Power Plant NRC Project Manager, NRR -Clinton Power Station NRC Proj~ct Manager, NRR -Dresden-Nuclear Power Station U.S. Nuclear Regulatory Commission Emergency Plan Revision February 27, 2018 Page 4 cc: w/ Attachment 1 only (continued)

NRG Project Manager, NRR -LaSalle County Station NRG Project Manager, NRR -Limerick Generating Station NRG Project Manager, NRR -Nine Mile Point Nuclear Station NRG Project Manager, NRR -Peach Bottom Atomic Power Station NRG Project Manager, NRR -Quad Cities Nuclear Power Station NRG Project Manager, NRR -R. E. Ginna Nuclear Power Plant NRG Project Manager, NRR -Three Mile Island Nuclear Station Illinois Emergency Management Agency -Division of Nuclear Safety Director, Bureau of Radiation Protection

-Pennsylvania Department of Environmental Resources R. R. Janati, Commonwealth of Pennsylvania S. T. Gray -State of Maryland A. L. Peterson, NYSERDA