ML113570486
ML113570486 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 12/21/2011 |
From: | Florida Power & Light Co |
To: | NRC/RGN-II |
References | |
05-335/11-302, 05-389/11-302 JPM NRC S-1, Rev. 0 | |
Download: ML113570486 (116) | |
Text
JPM NRC S-1 Rev 0 SIMULATOR Page 1 of 8
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO LOSS OF RCP CONTROLLED BLEEDOFF AND FAILED RCP SEALS ON THE 2B1 RCP NRC S-1
Applicant Examiner JOB PERFORMANCE MEASURE JPM NRC S-1 Rev 0 SIMULATOR Page 2 of 8 Task: Respond to loss of RCP controlled bleedoff and failed RCP seals on the 2B1 RCP Alternate Path JPM? Yes Facility JPM #:
N/A K/A: 003 A2.01 / 3.5 Ability to (a) predict the impacts of the following malfunctions or operations on the RCPS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:
Problems with RCP seals, especially rates of seal leak
-off. Duty Area(s):
N/A Task Information:
N/A Task Standard:
This JPM is complete when RCP Bleedoff flow has been established to the QT, the Reactor has been tripped and the 2B1 RCP has been stopped.
Evaluation Location:
Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
2-0120034 Reactor Coolant Pump Validation Time:
1 0 minutes Time Critical:
No Tools/Equipment/Procedures Needed:
2-0120034 Reactor Coolant Pump Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS JPM NRC S-1 Rev 0 SIMULATOR Page 3 of 8 SPECIFIC DIRECTIONS:
The task you are to perform is:
Re-establish RCP bleedoff flow
. The performance level to be used for this JPM is PERFORM. This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs: All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
The Unit is at 100%. RCP controlled bleedoff flow has been lost.
INITIATING CUES:
The US directs you to investigate the loss of RCP controlled bleedoff
, in accordance with 2
-0120034 Reactor Coolant Pump.
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-1 Rev 0 Simulator Page 4 of 8 START TIME: __________
2-0120034 Reactor Coolant Pump STEP 1: (6.3.5.A) IF Controlled Bleedoff flow is Lost or Low, Then ENSURE: V2505 RCP Bleedoff Cntmt Isol. Is open.
STANDARD: ATTEMPT to OPEN V2505 RCP Bleedoff Cntmt Isol.
EXAMINERS NOTE: V2505 will not open COMMENTS:
FAULTED STEP _____ SAT _____ UNSAT STEP 2: (6.3.5.B) IF Controlled Bleedoff flow is Lost or Low, Then ENSURE: V2524 RCP Bleedoff Cntmt Isol. Is open.
STANDARD: VERIFIES V25 24 RCP Bleedoff Cntmt Isol is open. EXAMINERS CUE:
COMMENTS:
_____ SAT
_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-1 Rev 0 Simulator Page 5 of 8 CONTINGENCY ACTION STEP 3 (6.3.5.1) IF normal Controlled Bleedoff can NOT be VERIFIED, Then open V2507 RCP Bleedoff Relief Stop Vlv.
STANDARD: OPEN V2507 RCP Bleedoff Relief Stop Vlv.
Recognize multiple seal failures and cavity leakage rising / alarm.
EXAMINERS NOTE: Upon opening V2507, three seals fail on 2B1 RCP. One minute later Reactor Cavity leakage increases and cavity leakage alarm annunciates.
EXAMINERS CUE:
COMMENTS:
FAULTED STEP _____ SAT _____ UNSAT STEP 4: (6.3.7) IF three seals have failed Then: A. TRIP the Reactor STANDARD: TRIP the Reactor EXAMINERS CUE:
COMMENTS:
CRITICAL STEP
_____ SAT
_____ UNSAT STEP 5: (6.3.7) IF three seals have failed Then: B. TRIP the Turbine
STANDARD: TRIP the Turbine EXAMINERS CUE:
COMMENTS:
_____ SAT
_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-1 Rev 0 Simulator Page 6 of 8 STEP 6: (6.3.7) Done IF three seals have failed Then: C. STOP the affected RCP(s)
STANDARD: STOP the 2B1 RCP
EXAMINERS CUE:
The JPM is complete when the 2B1 RCP has been stopped.
COMMENTS:
END OF TASK CRITICAL STEP _____ SAT _____ UNSAT STOP TIME: ____________
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET NRC S-1 7 of 8 (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
The Unit is at 100%. RCP controlled bleedoff flow has been lost.
INITIATING CUES:
The US directs you to investigate the loss of RCP controlled bleedoff, in accordance with 2
-0120034 Reactor Coolant Pump.
JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET NRC S-1 8 of 8 1. Restore IC
-1 2. Execute S-1 RCP.lsn Step 2B1 RCP seals fail will auto trigger.
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESTORE POWER TO 2B3 4.16KV BUS FROM OFFSITE
- UNIT 2 NRC S-2
Applicant Examiner JOB PERFORMANCE MEASURE NRC S-2 Simulator Page 2 of 10 Task: 07052015, RESTORE A 4160 V BUS NORMAL POWER SUPPLY 07052 140, RESPOND TO A LOSS OF OFF
-SITE POWER Faulted JPM?
N o Facility JPM #:
0821118 K/A: 062 A4.07 / 3.1 Ability to manually operate and/or monitor in the control room:
synchronizing and paralleling of different ac supplies
. Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when offsite power has been restored to the 2B3 4.16KV bus.
Evaluation Location:
Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
2-EOP-99, Appendix D Validation Time:
15 minutes Time Critical:
No Tools/Equipment/Procedures Needed:
2-EOP-99, Appendix D Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS NRC S-2 Simulator Page 3 of 10 SPECIFIC DIRECTIONS:
The task you are to perform is:
Restore Power to 2B3 4.16KV Bus From Offsite
- Unit 2 The performance level to be used for this JPM is Perform. This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
A Loss of Offsite Power has occurred at Unit 2.
Both EDGs were supplying the vital buses when offsite power was restored.
Table 6, 2-EOP-99 has been completed.
INITIATING CUES:
You are the Desk RCO. The US has directed you to restore the 2B3 bus from offsite IAW 2
-EOP-99, Appendix D. Offsite power is available.
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plan
- t. NRC S-2 Simulator Page 4 of 10 START TIME: __________
STEP 1: 1. ENSURE Table 6, Vital Power Breaker Configuration (LOOP), has been completed for the electrical train(s) supplied by a Unit 2 EDG(s).
STANDARD: Student may VERIFY that Table 6 is COMPLETE. EXAMINER'S CUE:
EVALUATOR'S NOTE: The student may want to verify Table 6. That is acceptable.
COMMENTS: _____ SAT _____ UNSAT STEP 2: 2. INSERT sync plug and PLACE in the desired ST position. STANDARD: POSITION 2B S/U XFMR sync plug to ST
-2B2. EXAMINER'S CUE:
COMMENTS:
CRITICAL STEP _____ SAT _____ UNSAT STEP 3: 3. To ENERGIZE the non-vital 4.16 KV bus, CLOSE the associated Startup Transformer breaker
. STANDARD: POSITION breaker 20302 to the CLOSED position. EXAMINER'S CUE:
COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plan
- t. NRC S-2 Simulator Page 5 of 10 STEP 4: 4. CLOSE breaker 4.16 KV bus tie 2A2 -2A3 (2B2 - 2B3). STANDARD: POSITION breaker 20309 to the CLOSED position. EXAMINER'S CUE:
COMMENTS:
CRITICAL STEP _____ SAT _____ UNSAT STEP 5: 5. ENSURE that the amber light is lit on the EDG governor control.
STANDARD: ENSURE Diesel governor control amber light is ON. EXAMINER'S CUE:
COMMENTS:
_____ SAT _____ UNSAT STEP 6: 6. INSERT sync plug and PLACE in the Tie position. STANDARD: 2B DG Breaker sync plug is POSITIONED to Tie-2B3. EXAMINER'S CUE:
COMMENTS:
CRITICAL STEP _____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plan
- t. NRC S-2 Simulator Page 6 of 10 STEP 7: 7. MATCH voltage using the EDG voltage control.
STANDARD: Adjusts Voltage control as necessary to ENSURE Voltage is POSITIONED to MATCH DG (running) to Grid (incoming) voltage.
EXAMINER'S CUE: COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT STEP 8: 8. Using EDG governor control, ADJUST sync hroscope to SLOW in the COUNTER CLOCKWISE direction.
STANDARD: Governor control POSITIONED until rotating SLOW in the COUNTER-CLOCKWISE direction.
EXAMINER'S CUE: COMMENTS: CRITICAL STEP _____ SAT _____ UNSAT STEP 9: 9. W hen the synchroscope is in the 12 O'CLOCK position, CLOSE breaker 4.16 KV bus tie 2A3-2A2 (2B3-2B2). STANDARD: Breaker 20411 is in the CLOSED position at 12 O'clock. EXAMINER'S CUE:
COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plan
- t. NRC S-2 Simulator Page 7 of 10 STEP 10: 10. PLACE EDG governor control to RAISE position UNTIL load is greater than 100 KW (50 amps) to avoid reverse power trip.
STANDARD: Governor control is HELD until load is >100 KW (50 amps) and then released. EXAMINER'S CUE:
COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT STEP 11: 11. ENSURE 2A (2B) EDG load is 100 KW (50 amps) and OPEN breaker DG 4.16 KV BREAKER.
STANDARD: ENSURE Governor control is POSITIONED to UNLOAD DG to 100 KW (50 amps), THEN open breaker 20401. EXAMINER'S CUE: COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT STEP 12: 12. REMOVE the sync plug.
STANDARD: Sync plug is REMOVED. EXAMINER'S CUE: COMMENTS: _____ SAT
_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plan
- t. NRC S-2 Simulator Page 8 of 10 STEP 1 3: 1 3. ENSURE proper restart conditions by amber light indication on BOTH voltage regulator and governor controls.
STANDARD: OBSERVES amber light illuminated on voltage regulator and governor controls. EXAMINER'S CUE:
EXAMINERS NOTE: Applicant may have to raise governor control to obtain Amber light.
COMMENTS:
_____ SAT
_____ UNSAT STEP (done): 1 4. If no ESFAS start signal is present, T hen STOP the EDG(s). (The EDG will cooldown at 450 rpm for 10 minutes and then stop)
STANDARD: PLACES 2B EDG start / stop switch to the STOP position.
EXAMINER'S CUE:
COMMENTS:
END OF TASK
_____ SAT _____ UNSAT STOP TIME: __________
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-2 Simulator Page 9 of 10
- 1. RESTORE JPM IC-33.
- 2. NO lesson is needed for this JPM. 3. UNFREEZE the Simulator when the student is ready.
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET NRC S-2 Page 10 of 10 (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
A Loss of Offsite Power has occurred at Unit 2.
Both EDGs were supplying the vital buses when offsite power was restored.
Table 6 of 2
-EOP-99 has been completed.
INITIATING CUES:
You are the Desk RCO. The US has directed you to restore the 2B3 bus from offsite IAW 2
-EOP-99, Appendix D. Offsite power is available.
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO HIGH RADIATION ALARM ON SPENT FUEL MONITORS
- UNIT 2 NRC S-3 Simulator
Applicant Examiner JOB PERFORMANCE MEASURE PSL OPS 0821117A/R10 Simulator or U2 Control Room Page 2 of 10 Task: 07025090, Align S FP Ventilation Trains 07067430, Respond To Fuel Handling Accident (Dropped/Damaged Fuel)
Faulted JPM?
Yes Facility JPM #:
0821117A K/A: 072 A3.01 / 2.9 Ability to monitor automatic operation of the ARM system, including : Changes in ventilation alignment.
Duty Area(s
): N/A Task Information:
N/A Task Standard:
This JPM is complete when the US has been notified that the Fuel Handling Building ventilation line
-up has been verified including contingency actions in accordance with 2
-AOP-26.02. Evaluation Location:
Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
2-AOP-26.02, Area Radiation Monitors Validation Time:
10 minutes Time Critical:
No Tools/Equipment/Procedures Needed:
2-AOP-26.02, "Area Radiation Monitors" Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS PSL OPS 0821117A/R10 Simulator or U2 Control Room Page 3 of 10 SPECIFIC DIRECTIONS:
The task you are to perform is: Respond to High Radiation Alarm on Spent Fuel Monitors
- Unit 2 The performance level to be used for this JPM is Perform. This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 2 is at 100% power.
Refueling preparations are being made in the Fuel Handling Building with spent fuel movement in the spent fuel pool. Spent Fuel Pool Radiation Monitors, GAG007, GAG008, GAG009, GAG010, GAG011, and GAG012 are in High Alarm.
2-AOP-26.02 is being implemented. The alarms have been verified valid. The fuel movement has been suspended and the FHB has been evacuated.
INITIATING CUES:
You are the Desk RCO.
The US has directed you to verify proper Fuel Handling Building ventilation line
-up in accordance with 2-AOP-26.02, "Area Radiation Monitors", section 4.2.4, step 4.
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-3 Simulator Page 4 of 10 START TIME: __________
4.2.4 Fuel Handling Building Radiation Monitor Alarm
- 4. IF more than one HIGH Alarm in a train actuated, THEN VERIFY FHB ventilation transfer to SBVS as follows:
STEP 1(4.2.4.4): A. VERIFY the following fans STOPPED:
HVS-6, Fuel Pool Supply Fan.
HVS-7, Fuel Handling Bldg Supply Fan.
HVE-15, Fuel Handling Bldg Exhaust Fan.
HVE-16A, Fuel Pool Exhaust Fan HVE-16B, Fuel Pool Exhaust Fan HVE-17, Fuel BLDG H&V Room Exhaust Fan (FHB/52/FH6
/E-RAC) STANDARD: ENSURES Fans are OFF. EXAMINERS NOTE: Applicant must call SNPO to verify HVE
-17 is OFF EXAMINER'S CUE:
SNPO reports HVE
-17 is STOPPED COMMENTS:
_____ SAT _____ UNSAT STEP 2 (4.2.4.4)
- B. VERI FY the following FHB dampers CLOSED:
D-33, Fuel Hdlg Bldg Inlet Damper D-35, Fuel Hdlg Bldg Outlet Damper D-29, Fuel Pool Inlet Damper D-31, Fuel Pool Outlet Damper D-34, Fuel Hdlg Bldg Inlet Damper D-36, Fuel Hdlg Bldg Outlet Damper D-30, Fuel Pool Inlet Damper D-32, Fuel Pool Outlet Damper STANDARD: VERIFY Dampers D-29 through D
-36 are CLOSED by observation of Red light off, Green light on
. EXAMINER'S CUE:
COMMENTS:
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-3 Simulator Page 5 of 10 STEP 3 (4.2.4.4)
- C. VERIFY FCV-25-30, Fuel Handling Emerg Vent Vlv, OPEN.
STANDARD: OBSERVE FCV-25-30 CLOSED. EXAMINER'S CUE:
EVALUATOR'S NOTE:
Faulted Step FCV-25-30 failed to auto OPEN.
COMMENTS: FAULTED STEP
_____ SAT _____ UNSAT CONTINGENCY ACTION:
STEP 4 (4.2.4.4)
- C.1 OPEN FCV-25-30, Fuel Handling Emerg Vent Vlv.
STANDARD: POSITION FCV-25-30 control switch to OPEN. *EXAMINER'S CUE:
FCV-25-30 indicates Green light OFF, Red Light ON.
X-4 Alarms as delta
-P lowers. COMMENTS: CRITICAL STEP
_____ SAT _____ UNSAT STEP 5 (4.2.4.4)
- D. VERIFY FCV-25-32, SBVS Isolation Valve, is CLOSED.
STANDARD: OBSERVE FCV-25-32 OPEN. EXAMINER'S CUE:
EVALUATOR'S NOTE:
Faulted Step FCV-25-32 failed to auto CLOSE.
COMMENTS:
FAULTED STEP _____ SA T _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-3 Simulator Page 6 of 10 CONTINGENCY ACTION:
STEP 6 (4.2.4.4)
- D.1 CLOSE FCV-25-32, SBVS Isolation Valve.
STANDARD: POSITION FCV-25-32 control switch to CLOSE.
EXAMINER'S CUE:
COMMENTS: CRITICAL STEP
_____ SAT _____ UNSAT STEP 7 (4.2.4.4)
- E. VERIFY HVE-6A, SBVS Exhaust Fan, is ON.
STANDARD: ENSURE HVE-6A is ON. EXAMINER'S CUE:
COMMENTS:
_____ SAT _____ UNSAT STEP 8 (4.2.4.4)
- F. VERIFY FCV-25-31, Fuel Handling Emerg Vent Vlv, OPEN.
STANDARD: OBSERVE FCV-25-31 CLOSED. EXAMINER'S CUE: EVALUATOR'S NOTE:
Faulted Step FCV-25-31 failed to auto OPEN.
COMMENTS:
FAULTED STEP
_____ SAT
_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-3 Simulator Page 7 of 10 CONTINGENCY ACTION:
STEP 9 (4.2.4.4)
- F.1 OPEN FCV-25-31, Fuel Handling Emerg Vent Vlv.
STANDARD: POSITION FCV-25-31 control switch to OPEN. EXAMINER'S CUE:
COMMENTS: CRITICAL STEP
_____ SAT _____ UNSAT STEP 10 (4.2.4.4)
- G. VERIFY FCV-25-33, SBVS Isolation Valve, is CLOSED.
STANDARD: OBSERVE FCV-25-33 OPEN. EXAMINER'S CUE:
EVALUATOR'S NOTE:
Faulted Step FCV-25-33 failed to auto CLOSE.
COMMENTS: FAULTED STEP
_____ SAT _____ UNSAT CONTINGENCY ACTION:
STEP 11 (4.2.4.4)
- G.1 CLOSE FCV-25-33, SBVS Isolation Valve.
STANDARD: POSITION FCV-25-33 control switch to CLOSE. EXAMINER'S CUE:
EXAMNERS NOTE: Annunciator V-21 , B SBVS INLET ISOL FCV 33 OVRLD/CLOSED Alarms. COMMENTS: CRITICAL STEP _____ SAT _____ UNSAT STEP 12 (4.2.4.4)
- H. VERIFY HVE-6B, SBVS Exhaust Fan, is ON.
STANDARD: ENSURE HVE-6B is ON. EXAMINER'S CUE:
Communicate to Applicant task is complete. Applicant should notify US task is complete and discrepancies found. COMMENTS:
_____ SAT
_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-3 Simulator Page 8 of 10 STEP (done):
FCV-25-30 and FCV 31 had to be manually opened, FCV 32 and FCV-25-33 had to be manually closed.
NOTIFY the US that the Fuel Handling Building ventilation line
-up has been verified in accordance with 2-AOP-26.02, section 4.2.4, step 4.
STANDARD: NOTIFY the US that the Fuel Handling Building ventilation line
-up has been VERIFIED and FCV-25-30 and FCV-25-31 had to be manually OPENED and FCV-25-32 and FCV 33 had to be manually CLOSED. EXAMINER'S CUE:
US ACKNOWLEDGES.
COMMENTS: END OF TASK
_____ SAT _____ UNSAT STOP TIME: __________
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP NRC S-3 Simulator Page 9 of 10 1. RESTORE IC-1. 2. UNFREEZE the Simulator.
- 3. SELECT the JPM Lesson File Folder.
- 4. OPEN and EXECUTE the lesson for S-3 SFP Rm.Lsn
. 5. FREEZE the Simulator.
. 7. The lesson will NOT need to be stopped and re
-executed for each student after restoring the IC.
- 8. UNFREEZE the Simulator when the student is ready to begin.
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET NRC S-3 (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 2 is at 100% power.
Refueling preparations are being made in the Fuel Handling Building with spent fuel movement in the spent fuel pool. Spent Fuel Pool Radiation Monitors, GAG007, GAG008, GAG009, GAG010, GAG011, and GAG012 are in High Alarm.
2-AOP-26.02 is being implemented. The alarms have been verified valid. The fuel movement has been suspended and the FHB has been evacuated.
INITIATING CUES:
You are the Desk RCO.
The US has directed you to verify proper Fuel Handling Building ventilation line
-up in accordance with 2-AOP-26.02, "Area Radiation Monitors", section 4.2.4, step 4.
NRC JPM S-4 Rev 0 Simulator Page 1 of 10
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE TRANSFER LETDOWN LEVEL CONTROL TO THE ALTERNATE LCV
- UNIT 2 NRC S-4
Applicant Examiner JOB PERFORMANCE MEASURE NRC JPM S-4 Rev 0 Simulator Page 2 of 10 Task: Transfer Letdown Level Control to Alternate LCV Faulted JPM?
No Facility JPM #:
0821040 K/A : 004 A2.22 / 3.2 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:
Mismatch of letdown and changing flows
. Duty Area(s):
N/A Task Information:
N/A Task Standard:
This JPM is complete when Letdown Level Control is transferred to the Alternate Level Control valve.
Evaluation Location: Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
2-NOP-02.02 "Charging and Letdown" Validation Time:
15 minutes Time Critical: No Tools/Equipment/Procedures Needed:
2-NOP-02.02 "Charging and Letdown" Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS NRC JPM S-4 Rev 0 Simulator Page 3 of 10 SPECIFIC DIRECTIONS:
The task you are to perform is:
Transfer Letdown Level Control to the Alternate Level Control Valve
- Unit 2 The performance level to be used for this JPM is Perform. This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 2 is operating at 100% power, steady state, MOL conditions. The in
-service letdown level control valve (LCV
-2110P) has begun to operate erratically
, indicating a problem with the valve control circuitry.
INITIATING CUES:
The US has directed you to place the alternate level control valve in service IAW 2
-NOP-02.02, "Charging and Letdown."
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 Simulator Page 4 of 10 START TIME: __________
2-NOP-02.02 Charging and Letdown Section 4.8 Swap Level control valves STEP 1 (4.8.1): IF in MODE 1 or 2, THEN PLACE V2520 ION EXCHANGER BYPASS VALVE, in BYPASS RESET to minimize reactivity effects of changing letdown temperature.
STANDARD: PLACE V2520 to Bypass Reset. EXAMINER'S CUE:
COMMENTS: Critical Step
_____ SAT _____ UNSAT STEP 2 (4.8.2): Slowly REDUCE PIC-2201, LTDN PRESSURE, controller setpoint to 250 psig. STANDARD: Slowly ADJUST PIC-2201 to LOWER pressure to 250 psig.
EXAMINER'S CUE:
EXAMINERS NOTE: Annunciator M
-5 "Letdown Pressure High/Low" is an expected alarm.
COMMENTS: Critical Step
_____ SAT
_____ UNSAT STEP 3 (4.8.3): If in AUTO, Then PLACE HIC-1110, LEVEL controller in MANUAL as follows: A. Using the lower Manual controller knob, MATCH HIC-1110, LEVEL, manual and auto controller output signals.
. STANDARD: PREVIEW signal by DEPRESSING the Green 'B' pushbutton and ADJUST HIC-1110 manual signal to MATCH auto EXAMINER'S CUE:
COMMENTS:
Critical Step
_____ SAT
_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 Simulator Page 5 of 10 STEP 4 (4.8.3): If in AUTO, Then PLACE HIC
-1110, LEVEL controller in MANUAL as follows: B. SHIFT HIC-1110, LEVEL, controller to MANUAL.
STANDARD: PLACE HIC-1110 to MANUAL by DEPRESSING the Yellow 'M' pushbutton EXAMINER'S CUE:
COMMENTS:
Critical Step
_____ SAT _____ UNSAT NOTE With only one Charging Pump running, dual indication may not be received on both Letdown Level Control valves STEP 5 (4.8.4): PLACE LEVEL CONTROL VALVE switch to BOTH.
STANDARD: POSITION the Letdown Level selector switch to the BOTH position. EXAMINER'S CUE:
COMMENTS:
Critical Step
_____ SAT _____ UNSAT STEP 6 (4.8.5): VERIFY a rise in letdown flow, as indicated on FIA
-2202, FLOW. STANDARD: VERIFY increasing flow on FIA-2202 EXAMINER'S CUE:
COMMENTS:
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 Simulator Page 6 of 10 STEP 7 (4.8.6): POSITION LEVEL CONTROL VAL VE switch to one of the following positions: (circle one)
LCV-2110 P LCV-2110Q STANDARD: POSITION Letdown Level Control valve selector switch to PCV-2 1 1 0Q EXAMINER'S CUE:
COMMENTS: Critical Step
_____ SAT _____ UNSAT STEP 8 (4.8.7): PERFORM the following:
A. ADJUST HIC-1110, LEVEL, controller for minimum flow.
STANDARD: ADJUST to MINIMUM letdown flow as observed on FIA
-2202 EXAMINER'S CUE:
COMMENTS:
Critical Step
_____ SAT _____ UNSAT STEP 9 (4.8.7): PERFORM the following:
B. IF letdown flow is NOT 28-30 gpm, THEN REQUEST I&C to adjust LY-1110, Signal Limiter for Pressurizer Level control, per Section 5.8, Letdown Limiter Adjustment
. STANDARD: Informs I&C of the current minimum letdown flow value and directs them to adjust LY1110, Pressurizer Level control signal limiter
. EXAMINER'S CUE:
EVALUATOR'S NOTE:
On the Simulator the letdown flow is not exactly 28 gpm, direct the student to c ontinue with the task after I&C is contacted
. The procedure does not require waiting for I&C to complete the task.
COMMENTS:
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 Simulator Page 7 of 10 STEP 10 (4.8.8): PLACE HIC-1110, LEVEL controller in AUTO by performing the following:
A. Using upper BIAS control knob and previewing auto signal BALANCE HIC-1110, LEVEL, controller auto and manual output signals
. STANDARD: PREVIEW signal by DEPRESSING the Green 'B' pushbutton and ADJUST HIC-1110 auto signal to MATCH manual using the upper BIAS kno
- b. EXAMINER'S CUE:
COMMENTS:
_____ SAT _____ UNSAT STEP 11 (4.8.8): PLACE HIC-1110, LEVEL controller in AUTO by performing the following:
B. SHIFT HIC-1110, LEVEL controller to AUTO.
STANDARD: PLACE HIC-1110 in AUTO by DEPRESSING the White 'A' pushbutton EXAMINER'S CUE:
COMMENTS: Critical Step
_____ SAT _____ UNSAT STEP 12 (4.8.9): Slowly RAISE PIC-2201, PRESSURE, setpoint to 430 psig.
STANDARD: Slowly Adjust PIC-2201 setpoint to RAISE pressure to 430 psig and ENSURE that red needle follows and MATCHES the black needle EXAMINER'S CUE:
COMMENTS:
Critical Step
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 Simulator Page 8 of 10 STEP 13 (4.8.10): ADJUST HIC
-1110, LEVEL, controller for a flow consistent wit h current plant conditions.
STANDARD: ADJUST HIC-1110 to current plant conditions with the BIAS knob.
EXAMINER'S CUE:
EVALUATO R'S NOTE: Adjustment is not needed if pressurizer level is at setpoint. COMMENTS:
_____ SAT _____ UNSAT STEP 14 (4.8.11): When temperature on TIC
-2224, BYPASS TEMPERATURE, returns to normal, THEN ENSURE V2520, ION EXCHANGER BYPASS VALVE is in AUTO. STANDARD: PLACES V2520 to AUTO.
EXAMINER'S CUE:
COMMENTS: Critical Step
_____ SAT
_____ UNSAT
STEP (done): NOTIFY the US that the Letdown Level Control has been transferred to the Alternate Level Control valve, LCV
-211 0Q and that I&C Department has been notified to adjust LY1110, Pressurizer Level control signal limiter.
STANDARD: NOTIFY the US that the Letdown Level Control has been TRANSFERRED to LCV-211 0 Q. EXAMINER'S CUE:
US Acknowledges.
COMMENTS:
END OF TASK
_____ SAT
_____ UNSAT
STOP TIME: __________
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP NRC JPM S-4 Simulator Page 9 of 10 1. RESTORE IC-1. 2. UNFREEZE the Simulator.
- 3. No Lesson is needed for this JPM.
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET NRC JPM S-4 Page 10 of 10 (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 2 is operating at 100% power, steady state, MOL conditions. The in
-service letdown level control valve (LCV
-2110P) has begun to operate erratically
, indicating a problem with the valve control circuitry.
INITIATING CUES:
You are the DRCO. The US has directed you to place the alternate level control valve in service IAW 2
-NOP-02.02, "Charging and Letdown."
JPM NRC S-5 Rev 0 SIMULATOR Page 1 of 14
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESTORE AFW FLOW TO THE 2A AND 2 B SG USING 2C AFW PUMP NRC S-5
Applicant Examiner JOB PERFORMANCE MEASURE JPM NRC S-5 Rev 0 SIMULATOR Page 2 of 14 Task: Start the 2C AFW pump and feed the 2A and 2 B SG. Alternate Path JPM? Yes Facility JPM #:
N/A K/A: 061 A2.04 / 3.4 Ability to (a) predict the impacts of the following malfunctions or operations on the AFW; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: pump failure or improper operation Duty Area(s):
N/A Task Information:
N/A Task Standard:
This JPM is completed when the 2C AFW pump mechanical overspeed trip is reset and the 2C AFW pump is feeding the 2A and 2 B SG at 200-220 gpm. Evaluation Location:
Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
2-AOP-09.02 AUXILIARY FEEDWATER 2-NOP-09.02 AUXILIARY FEEDWATER Annunciator G
-46 Validation Time:
15 minutes Time Critical:
No Tools/Equipment/Procedures Needed:
2-AOP-09.02 AUXILIARY FEEDWATER
. 2-NOP-09.02 AUXILIARY FEEDWATE R Annunciator G
-46 Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS JPM NRC S-5 Rev 0 SIMULATOR Page 3 of 14 SPECIFIC DIRECTIONS:
The task you are to perform is:
Start the 2C AFW Pump and feed the 2A and 2 B SG. The performance level to be used for this JPM is PERFORM. This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you. SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
The Unit is in Mode 3 NOP/NOT
. 2 B AFW pump throttle valve MV 10 breaker tripped. The 2 A AFW pump motor tripped when started. The 2C AFW pump is ready to be started to feed the 2A and 2 B SG. INITIATING CUES:
The US directs you to start the 2C AFW using 2
-NOP-09.02 Auxiliary Feedwater step 4.3.6 and feed the 2A and 2 B SG.
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 4 of 14 START TIME:
__________
2-NOP-09.02 Auxiliary Feedwater STEP 1: (4.3.6) START the 2C Auxiliary Feedwater Pump
STANDARD: OPEN MV-08-12, SG 2B STM To AFW PP 2C
. AND/OR OPEN MV-08-13, SG 2A STM To AFW PP 2C.
EXAMINERS NOTE: 2C AFW will trip on mechanical overspeed COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT STEP 2: (4.3.7) VERIFY turbine speed is stable between 3700 and 3800 rpm AND the governor is NOT hunting / oscillating.
STANDARD: RECOGNIZE 2C AFW pump has tripped on mechanical overspeed.
Refers to Annunciator summary for G
-46 EXAMINERS NOTE: Applicant should recognize mechanical overspeed by:
MV-08-3 in closed position AND annunciator G
-46 LOCKED IN. (If this was a electrical overspeed, annunciator G
-46 would have came in and then cleared).
EXAMINERS CUE:
COMMENTS:
FAULTED STEP
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 5 of 14 STEP 3: Refer to Annunciator summary for G
-46, 2C AFW Pump Turbine Failure/Trip/OVRLD/SS Isol.
STANDARD: RECOGNIZE directions from Annunciator summary If 2C AFW Pump Tripped, Then GO TO 2-AOP-09.02 AUXILIARY FEEDWATER
EXAMINERS CUE:
COMMENTS:
_____ SAT _____ UNSAT 2-AOP-09.02 AUXILIARY FEEDWATER STEP 4: (4.2.5.1)
IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM Attachment 1, Resetting 2C AFW Pump Following Overspeed Trip.
STANDARD: REFERS to Attachment 1 of 2
-AOP-09.02 AUXILIARY FEEDWATER
EXAMINERS CUE:
COMMENTS:
_____ SAT _____ UNSAT 2-AOP-09.02 AUXILIARY FEEDWATER ATTACHMENT 1 STEP 5: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
A. CLOSE MV-08-12, SG 2B STM TO AFW PP 2C (RTGB
-202)
STANDARD: CLOSE MV-08-12 SG 2B Ste am to AFW P P 2C.
EXAMINERS CUE: COMMENTS: CRITICAL STEP _____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 6 of 14 STEP 6: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
B. CLOSE MV-08-13, SG 2A STM TO AFW PP 2C (RTGB
-202) STANDARD: CLOSE MV-08-13 SG 2A Ste am to AFW Pp 2C
. EXAMINERS CUE:
COMMENTS:
CRITICAL STEP _____ SAT _____ UNSAT STEP 7: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
C. PERFORM the following to reset and OPEN MV 3, 2C PUMP:
(1) CLOSE MV-08-3, 2C PUMP (RTGB
-202 - Key 78) STANDARD: CLOSE MV-08-3, 2C PUMP using Key 78 EXAMINERS CUE:
COMMENTS:
CRITICAL STEP
_____ SAT
_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 7 of 14 STEP 8 (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
C. PERFORM the following to reset and OPEN MV 3, 2C PUMP:
(2) If 2C AFW pump tripped due to mechanical overspeed trip, THEN PERFOR M the following:
- a. RESET the 2C Auxiliary Feedwater Pump mechanical overspeed linkage.
STANDARD: CALL Field Operator to reset the mechanical overspeed linkage
EXAMINERS CUE:
Field Operator calls back and states mechanical linkage on MV-08-3 has been reset.
COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT STEP 9 (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
C. PERFORM the following to reset and OPEN MV 3, 2C PUMP:
(2) If 2C AFW pump tripped due to mechanical overspeed trip, THEN PERFORM the following:
- b. VERIFY top surface of trip tappet nut is in line with the line marked on the head lever to ensure full engagement. STANDARD: VERIFY with the field operator the proper trip tappet nut engagement
. EXAMINERS CUE:
Field operator states the trip tappet nut is in line with the line marked on the head lever.
COMMENTS:
_____ SAT
_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 8 of 14 STEP 10: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
C. PERFORM the following to reset and OPEN MV 3, 2C PUMP:
(3) PLACE MV-08-3, 2C PUMP (2C Auxiliar Feedwater Pump), in OPEN STANDARD: TURNS KEY 78 for MV-08-3 to the open position.
EXAMINERS CUE:
COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT STEP 11: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
C. PERFORM the following to reset and OPEN MV 3, 2C PUMP:
(4) VERIFY MV
-0 8-3, THROTTLE / TRIP VALVE FOR AFW PUMP 2C is OPEN. STANDARD: OBSERVES MV-08-3 red light on green light off.
EXAMINERS CUE:
COMMENTS: _____ SAT
_____ UNSAT STEP 1 2: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
D. IF 2C AFW pump is rotating, THEN perform the following:
STANDARD: CALLS field operator to determine if 2C AFW pump is rotating EXAMINERS CUE:
Field Operator reports back, 2C AFW pump is NOT rotating.
COMMENTS:
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 9 of 14 STEP 1 3: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
E. PERFORM one of the following to drain oil from the underside of the governor main speed piston.
(1) WAIT 3 minutes after the pump stops rotating OR (2) PERFORM the following:
- a. PLACE manual control knob on the side of the turbine governor in the FULLY COUNTER
-CLOCKWISE idle speed position.
- b. RETURN manual control knob on the turbine governor to FULLY CLOCKWISE maximum speed position.
STANDARD: DETERMINE time since pump stopped rotating. If >3 minutes step 2.a and 2.b not performed. If <3 minutes call field operator to perform step 2.a and 2.b EXAMINERS CUE:
If field operator called, state step 2.a and 2.b has been performed.
If less than 3 minutes step E.
(2) should be performed.
COMMENTS:
_____ SAT _____ UNSAT STEP 1 4: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
F. ENSURE MV-09-11, PUMP 2C TO SG 2A is CLOSED (RTGB-202) STANDARD: VERIFIES MV-09-11 green light on, red light off. EXAMINERS CUE:
COMMENTS:
_____ SAT
_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 10 of 14 STEP 1 5: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
G. ENSURE MV-09-12, PUMP 2C TO SG 2B is CLOSED (RTGB-202) STANDARD: VERIFIES MV-09-12 green light on, red light off.
EXAMINERS CUE:
COMMENTS:
_____ SAT _____ UNSAT STEP 1 6: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
H. IF both Steam Generators are intact AND NOT faulted, THEN OPEN the following valves simultaneously:
(1) MV-08-13 SG 2A STM TO AFW PP 2C (2) MV-08-12 SG 2B STM TO AFW PP 2C STANDARD: USING two handed operation open MV 13 MV-08-12 simultaneously and verifies valves open.
EXAMINERS CU E: COMMENTS:
CRITICAL STEP
_____ SAT
_____ UNSAT STEP 1 7: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
I. IF either SG is faulted THE OPEN steam supply valve from the NON
-FAULTED S/G STANDARD: DETERMINES step N/A EXAMINERS CUE:
COMMENTS: _____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 11 of 14 STEP 1 8: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
J. IF flow is to be restored to 2A S/G THEN ENSURE SE-09-4, 2C PUMP DISCH to 2A S/G is OPEN STANDARD: OPENS SE-09-4 EXAMINERS CUE:
COMMENTS: CRITICAL STEP _____ SAT _____ UNSAT STEP 1 9: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following
- K. IF flow is to be restored to 2 B S/G THEN ENSURE SE 5, 2C PUMP DISCH to 2 B S/G is OPEN STANDARD: OPENS SE-09-5 EXAMINERS CUE:
CAUTION Excessive Feedwater to a Steam Generator following a Total Loss of Feedwater can result in water hammer and thermal shock when the feed ring is uncovered (level <33% NR). Following a Total Loss of Feedwater, initial Feedwater flow should be controlled as follows:
If using Main Feedwater OR Condensate, 'As low as possible' for the first 5 minutes OR until SG level has risen.
COMMENTS: CRITICAL STEP _____ SAT _____ UNSAT STEP 20: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
L. Throttle MV-09-11, PUMP 2C to S/G 2A, to establish required flowrate t o the 2A steam generator.
STANDARD: THROTTLES MV-09-11, PUMP 2C to S/G 2A, to establish required flowrate to the 2A steam generator. Adjusts flow to 2A SG at 200 gpm to 220 gpm EXAMINERS CUE:
COMMENTS:
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST JPM NRC S-5 Rev 0 Simulator Page 12 of 14 STEP 21: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following:
M. Throttle MV-09-1 2, PUMP 2C to S/G 2 B to establish required flowrate to the 2B steam generator.
STANDARD: THROTTLES MV-09-1 2, PUMP 2C to S/G 2 B, to establish required flowrate to the 2 B steam generator. Adjusts flow to 2B SG at 200 gpm to 220 gpm EXAMINERS CUE:
Advise JPM is complete.
COMMENTS: END OF TASK CRITICAL STEP
_____ SAT
_____ UNSAT
STOP TIME: ____________
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET Page 13 of 14 NRC S-5 (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
The Unit is in Mode 3 NOP/NOT. 2B AFW pump throttle valve MV 10 breaker tripped. The 2A AFW pump motor tripped when started. The 2C AFW pump is ready to be started to feed the 2A and 2B SG.
INITIATING CUES:
The US directs you to start the 2C AFW using 2
-NOP-09.02 Auxiliary Feedwater step 4.3.6 and feed the 2A and 2B SG.
JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET Page 14 of 14 NRC S-5 1. Restore IC
-50 2. Execute S-5 AFW.Lsn NOTE: 'C' AFW Mechanical Overspeed will trigger automatically
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE ESTABLISH ONCE
-THROUGH COOLING
- UNIT 2 NRC S-6 Simulator
Applicant Examiner JOB PERFORMANCE MEASURE NRC S-6 Simulator Page 2 of 17 Task: Establish Once
-Through Cooling Faulted JPM?
Yes Facility JPM #:
K/A: 006 ECCS A4.02 / 4.0 Ability to manually operate and/or monitor in the control room: Valves Duty Area(s):
N/A Task Information:
N/A Task Standard:
This JPM is complete when once-through cooling has been established
, safety injection flow to the RCS has been verified and US has been informed that the task is complete
. Evaluation Location:
Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
2-EOP-15, Functional Recovery, RCS and Core Heat Removal, Success Path 3 2-EOP-99, Figure 2
Validation Time:
20 minutes Time Critical:
No Tools/Equipment/Procedures Needed:
2-EOP-15, Functional Recovery, RCS and Core Heat Removal, Success Path 3 2-EOP-99, Figure 2 Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS NRC S-6 Simulator Page 3 of 17 SPECIFIC DIRECTIONS:
The task you are to perform is:
Establish Once
-Through Cooling on Unit 2 The performance level to be used for this JPM is Perform This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 2 is experiencing a total loss of feedwater event. All attempts to restore main and auxiliary feedwater have been unsuccessful, and both steam generator levels indicate less than 15% wide range. The US has determined that once
-through cooling will be established.
INITIATING CUES:
You are the Desk RCO. The US has directed you to establish once
-through-cooling IAW 2-EOP-15, RCS and Core Heat Removal
- HR-3, Success Path 3
- Once-Through-Cooling, and verify SI flow IAW 2
-EOP-99, Figure 2.
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 4 of 17 START TIME: __________ 2-EOP-15, Functional Recovery, RCS & Core Heat Removal HR
-3, Success Path 3, Once
-Through-Cooling STEP 1 (4.6.1A): DE-ENERGIZE ALL Pressurizer Heaters.
STANDARD: POSITION all Pressurizer Heaters control switches to OFF. EXAMINER'S CUE:
EVALUATOR'S NOTE:
COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT STEP 2 (4.6.1B): If Main Condenser is available, Then PERFORM BOTH the following:
- 1. BLOCK MSIS STANDARD: DETERMINE that Main Condenser is AVAILABLE. When MSIS BLOCK permissive annunciates, block MSIS.
EXAMINER'S CUE:
EXAMINERS NOTE: MSIS BLOCK will not be in at this time. Applicant will need to monitor plant conditions and be aware of block annunciator as SBCS valves and ADV's are opened. COMMENTS:
CRITICA L STEP
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 5 of 17 STEP 3 (4.6.1B):
If Main Condenser is available, Then PERFORM BOTH the following:
- 2. ENSURE ALL Steam Bypass Valves are OPEN.
STANDARD: POSITION SBCS controllers to manual and open all five SBCS valves EXAMINER'S CUE: EXAMINERS NOTE: Although not procedurally driven, SBCS permissive switch should be taken to 'on' at this time. If this is not performed, the SBCS valves will close when SG pressure reaches 806 psia.
COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT
STEP 4 (4.6.1.C)
ENSURE ALL available Atmospheric Dump Valves are OPEN.
STANDARD: POSITION all four ADVs to OPEN. EXAMINER'S CUE:
COMMENTS:
CRITICAL STEP _____ SAT _____ UNSAT
STEP 5 (4.6.1.D)
- ENSURE ALL RCPs are STOPPED.
STANDARD: DETERMINE that all RCPs are STOPPED. EXAMINER'S CUE:
COMMENTS:
_____ SAT
_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 6 of 17 STEP 6 (4.6.1.E)
- ENSURE SIAS and CIAS are ACTUATED.
STANDARD: DEPRESS the "think" pushbutton above each switch and POSITION SIAS Train A and Train B actuation switches to SIAS ON. VERIFY SIAS and CIAS Trains A and B have ACTUATED. EXAMINER'S CUE:
EVALUATOR'S NOTE:
SIAS and CIAS may AUTO Actuate prior to MANUAL Actuation. If AUTO actuation has occurred, this is not a CRITICAL STEP.
COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT STEP 7 (4.6.1.F)
- ENSURE BOTH of the following
- 1. BOTH HPSI pumps are RUNNING.
. STANDARD: OBSERVE HPSI Pump 2A and 2B are running
. EXAMINER'S CUE:
COMMENTS:
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 7 of 17 STEP 8 (4.6.1.F): ENSURE BOTH of the following:
- 2. ALL cold leg injection valves are OPEN.
STANDARD: OBSERVE that all cold leg injection valves are OPEN. EXAMINER'S CUE:
COMMENTS:
_____ SAT
_____ UNSAT STEP 9 (4.6.1.G): ENSURE ALL available charging pumps are RUNNING.
STANDARD: POSITION all available charging pump control switches to START, if not already running.
EXAMINER'S CUE:
EVALUATOR'S NOTE: 2C Charging pump must be manually STARTED and is the critical step
. COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT
STEP 10 (4.6.1.H)
- ENSURE BOTH PORV block valves are OPEN.
STANDARD: POSITION PORV block valve V1477 control switch to OPEN. Identifies breaker tripped on V1477 EXAMINER'S CUE:
If field operator called to reset breaker, wait until end of steps to call that breaker is reset.
EXAMINERS NOTE: PORV block valve V1476 is already open. PORV block valve V1477 breaker will trip as soon as the switch is taken to open. Applicant may call the field operator at this time to reset breaker.
COMMENTS:
FAULTED STEP _____ SAT
_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 8 of 17 STEP 11(4.6.1.H.1)
- IF ONE PORV Block Valve is OPEN Then continue steps to initiate Once Through Cooling.
STANDARD: DETERMINES V1476 block valve is open and continues with procedure.
EXAMINER'S CUE:
COMMENTS:
_____ SAT _____ UNSAT STEP 12 (4.6.1.I): WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, and BOTH PORV block valves are open, Then OPEN BOTH PORV s. 1. ENSURE PORV control switches are in OFF.
STANDARD: VERIFY V1474 and V1475 control switches are in OFF. EXAMINER'S CUE:
EVALUATOR'S NOTE: Both PORV switches should already be in OFF.
COMMENTS:
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 9 of 17 STEP 13 (4.6.1.I): WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, and BOTH PORV block valves are open, Then OPEN BOTH PORVs. 2. PULL at least TWO RPS Hi Pzr Press bistables.
STANDARD: Unscrews and pulls at least two RPS Hi Pzr Press bistables
. EXAMINER'S CUE:
COMMENTS:
_____ SAT
_____ UNSAT STEP 1 4 (4.6.1.I): WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, and BOTH PORV block valves are open, Then OPEN BOTH PORVs. 3. VERIFY BOTH PORVS OPEN.
STANDARD: Determine PORV V1475 and PORV V1474 did not open
. EXAMINER'S CUE:
EXAMINERS NOTE: PORV 1475 will NOT open until it's block valve V1477 is open due to P of 50 psia across valve.
COMMENTS:
FAULTED STEP _____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 10 of 17 STEP 1 5 (4.6.1.I.1):
WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, and at least ONE PORV block valve is OPEN, Then PERFORM the following:
D. CONTINUE efforts to OPEN the second PORV and PORV Block Valve. STANDARD: CALL the field operator to determine the status of the Breaker for Block Valve V1477 (breaker 2
-42002 (secondary isol.) and 2
-42007 (Reg. Guide 1.63 Isol.)
at 480V MCC 2B5)
When breaker reset and block valve V1477 open, verifies PORV V1475 opens.
EXAMINER'S CUE: Call as field operator and state breaker 2
-4200 2 is in the tripped condition. Reset breaker when requested by Applicant. EXAMINERS NOTE: There is no way to remotely open PORV V1474 if pulling RPS bistables did not open valve.
COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT STEP 1 6 (4.6.1.I.1):
WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, and at least ONE PORV block valve is OPEN, Then PERFORM th e following:
D. CONTINUE efforts to OPEN the second PORV and PORV Block Valve. STANDARD: OPEN PORV block valve V1477 when breaker 2
-42001 is reset.
EXAMINER'S CUE:
COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 11 of 17 STEP 1 7 (4.6.1.J):
Whe n once through cooling has been established, Then: 1. Close Atmosphere Dump Valves (ADV's).
STANDARD: POSITION both ADV's to CLOSE. If controller is AUTO / MANUAL, use pushbutton on controller and set to '0'. If manual switches used hold switch to closed position until red light off and green light on.
EXAMINER'S CUE:
COMMENTS: CRITICAL STEP
_____ SAT _____ UNSAT STEP 1 8 (4.6.1.J):
When once through cooling has been established, Then: 2. Close Main Steam Isolation Valves.
STANDARD: POSITION both MSIVs to CLOSE. EXAMINER'S CUE:
EVALUATOR'S NOTE:
COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 12 of 17 STEP 1 9 (4.6.1.J):
When once through cooling has been established, Then: 3. Close Main Steam Isolation Bypass Valves.
STANDARD: DETERMINE that both MSIV Bypass Valves are CLOSED. EXAMINER'S CUE:
COMMENTS:
_____ SAT _____ UNSAT STEP 20 (4.6.1.J):
When once through cooling has been established, Then: 4. Close Steam Generator Blowdown Isolation Valves.
STANDARD: DETERMINE that all 4 Blowdown Isolation Valves are CLOSED.
EXAMINER'S CUE:
COMMENTS: _____ SAT _____ UNSAT STEP 2 1 (4.6.1.J):
When once through cooling has been established, Then: 5. Verify Steam Generator Safety Valves are CLOSED.
STANDARD: DETERMINE from NPO report that all Steam Generator Safety Valves are CLOSED.
EXAMINER'S CUE:
When contacted, the NPO reports that NO Steam Generator Safety Valves are open.
COMMENTS:
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 13 of 17 STEP 2 2 (4.6.1.K); If Steam Generator pressure approaches 985 psig (1000 psia), Then OPERATE ADVs as necessary to maintain S/G pressure between 835 and 915 psig (850 and 930 psia).
STANDARD: DETERMINE that both Steam Generator pressures are below 985 psig and are STABLE. EXAMINER'S CUE:
COMMENTS:
_____ SAT _____ UNSAT STEP 2 3 (4.6.2): Maximize SI Flow PERFORM ALL of the following:
A. ENSURE ALL available SI Pumps are RUNNING.
STANDARD: DETERMINE that SI pumps are RUNNING. EXAMINER'S CUE:
COMMENTS:
_____ SAT
_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 14 of 17 STEP 2 4 (4.6.2): Maximize SI Flow PERFORM ALL of the following:
B. VERIFY adequate SI flow. REFER TO Figure 2, Safety Injection Flow vs. RCS Pressure.
STANDARD: SUM safety injection flows and VERIFY total flow is to RIGHT of "2 Full Train s in Operation" curve on Figure 2 in 2
-EOP-99. EXAMINER'S CUE:
COMMENTS:
_____ SAT _____ UNSAT STEP 2 5 (4.6.2): Maximize SI Flow PERFORM ALL of the following:
C. ENSURE ALL available Charging Pumps are RUNNING.
STANDARD: VERIFY all available charging pumps are RUNNING. EXAMINER'S CUE:
COMMENTS:
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC S-6 Simulator Page 15 of 17 STEP (done):
NOTIFY the US that the task is COMPLETE.
STANDARD: NOTIFY the US that once
-through-cooling has been ESTABLISHED IAW EOP-15, RCS and Core Heat Removal
- HR-3, Success Path 3. Through PORV V1475 only.
EXAMINER'S CUE:
US ACKNOWLEDGES.
COMMENTS:
END OF TASK
_____ SAT _____ UNSAT STOP TIME: __________
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP NRC S-6 Page 16 of 17 1. RESTORE IC-2 5 from the JPM IC Set Group.
- 2. DO NOT UNFREEZE the Simulator. 3. SELECT JPM Lesson File Folder.
- 4. SELECT Lesson S-6, OTC.Lsn and EXECUTE the Lesson.
- 5. UNFREEZE the Simulator
- 6. Make a Temporary STOREPOINT if more than one student will perform the JPM.
- 7. The lesson does NOT need to be stopped and re
-executed for subsequent students.
- 8. UNFREEZE the Simulator when the student is ready.
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET NRC S-6 (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 2 is experiencing a total loss of feedwater event. All attempts to restore main and auxiliary feedwater have been unsuccessful, and both steam generator levels indicate less than 15% wide range. The US has determined that once
-through cooling will be established.
INITIATING CUES:
You are the Desk RCO. The US has directed you to establish once-through-cooling IAW 2-EOP-15, RCS and Core Heat Removal
- HR-3, Success Path 3
- Once-Through-Cooling, and verify SI flow IAW 2
-EOP-99, Figure 2.
JPM S-7 SIMULATOR Page 1 of 12 St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE PERFORM EMERGENCY BORATION NRC S-7
Applicant Examiner JPM S-7 SIMULATOR Page 2 of 12 JOB PERFORMANCE MEASURE ST LUCIE NUCLEAR PLANT Task: Emergency Borate Faulted JPM?
Ye s Facility JPM #:
K/A: 004 A2.14 / 3.8 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:
Emergency boration Duty Area(s):
N/A Task Information:
N/A Task Standard:
Evaluation Location:
Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
Validation Time:
10 minutes Time Critical:
No Tools/Equipment/Procedures Needed:
2-EOP-01 "Standard Post Trip Actions" 2-AOP-02.2 "Emergency Boration" Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task. None Radiological Protection and RWP Requirements:
None
JPM S-7 SIMULATOR Page 3 of 12 Read to Candidate Directions to candidate for In
-Plant or Control Room JPMs:
I will explain the initial conditions and state the task to be performed. All in
-plant or control room JPM steps, including any communications, shall be simulated for this JPM. Under no circumstances, unless directed by the examiner, are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you finish your assigned task by returning the handout sheet I provided you.
Directions to candidate for Simulator JPMs:
I will explain the initial conditions and state the task to be performed. All simulator JPM steps, including any communications, shall be performed for this JPM. You are to operate any plant equipment that is necessary for the completion of this JPM. The simulator will provide the cues as you perform this JPM.
Ensure you indicate to me when you finish your assigned task by returning the handout sheet I provided you.
Initial Conditions:
A reactor trip on Unit 2 has just occurred following a 45
-day run at 100% power.
Initiating Cues:
You are the Board RCO. The US has directed you to perform the actions of 2-EOP-01, 'Standard Post Trip Action s' Reactivity Control Safety Function.
JPM S-7 SIMULATOR Page 4 of 12 START TIME: __________
- 1. DETERMINE Reactivity Control acceptance criteria are met:
STEP 1 (1A): Reactor power is lowering STANDARD: VERIFY reactor power LOWERING using redundant Nuclear Instrumentation EXAMINER'S CUE:
EVALUATOR NOTE:
During this scenario, an instructor should play the part of the Desk RCO and keep the annunciators acknowledged to allow the candidate to focus on the task at hand COMMENTS:
_____ SAT
_____ UNSAT STEP 2 (1B): Verify Startup Rate is negative.
STANDARD: VERIFY Startup Rate is NEGATIVE using redundant Nuclear Instrumentation indications EXAMINER'S CUE:
COMMENTS:
_____ SAT
_____ UNSAT STEP 3 (1C): VERIFY ALL CEA's are fully inserted..
STANDARD: Using Core Mimic, ADS CRT, and CEDS Control Panel, DETERMINE that CEAs 37, and 45 are FULLY WITHDRAWN
EXAMINER'S CUE:
COMMENTS:
_____ SAT
_____ UNSAT
JPM S-7 SIMULATOR Page 5 of 12 STEP 4.1(1.C.1): Contingency Actions INITIATE Emergency Boration to achieve adequate SDM
. STANDARD: ENTER 2-AOP-02.02, 'Emergency Boration' EXAMINER'S CUE:
EXAMINERS NOTE: Applicant may elect to perform steps from memory. If so, when lineup is complete he should refer to the procedure to verify proper lineup.
COMMENTS:
_____ SAT
_____ UNSAT 2-AOP-02.02 EMERGENCY BORATION STEP 5 (4.2.1): VERIFY at least one charging pump is running with control switch in START STANDARD: OBSERVES at least one charging pump running with 44 gpm flow and switch position in RUN
. EXAMINER'S CUE:
COMMENTS:
_____ SAT
_____ UNSAT STEP 6 (4.2.2): VERIFY the MAKEUP MODE SELECTOR switch is in MANUAL.
STANDARD: OBSERVES Makeup Mode Selector Switch to MANUAL EXAMINER'S CUE:
COMMENTS:
_____ SAT
_____ UNSAT STEP 7 (4.2.3): VERIFY V2525, BORON LOAD CONTROL VALVE is CLOSED.
STANDARD: OBSERVES V2525 is CLOSED EXAMINER'S CUE:
COMMENTS:
_____ SAT
_____ UNSAT
JPM S-7 SIMULATOR Page 6 of 12 STEP 8 (4.2.4): PERFORM the following to Emergency Borate using V2514, EMERGENCY BORATE: A. Start at least one of the following:
2A (BORIC ACID PUMP) 2B (BORIC ACID PUMP)
STANDARD: POSITION 2A or 2B BAM Pump control switch to RUN EXAMINER'S CUE:
EVALUATOR NOTE:
Since the procedure doesn't specify which pump to run, either one is acceptable. Optimally, however, the candidate should start the pump associated with the Tech Spec designated BAM tank COMMENTS: _____ SAT
_____ UNSAT STEP 9 (4.2.4): PERFORM the following to Emergency Borate using V2514, EMERGENCY BORATE: B. IF 2A BORIC ACID PUMP was started, THEN CLOSE V2650, TANK 2A RECIRC VALVE
. STANDARD: POSITION V2650 control switch to CLOSE if 2A BORIC ACID PUMP was started. EXAMINER'S CUE:
COMMENTS:
_____ SAT
_____ UNSAT STEP 10 (4.2.4)
- PERFORM the following to Emergency Borate using V2514, EMERGENCY BORATE:
C. IF 2B BORIC ACID PUMP was started, THEN CLOSE V2651, TANK 2B RECIRC VALVE.
STANDARD: POSITION V2651 control switch to CLOSE if 2B BORIC ACID PUMP was started EXAMINER'S CUE:
COMMENTS:
_____ SAT
_____ UNSAT
JPM S-7 SIMULATOR Page 7 of 12 STEP 11 (4.2.4)
- PERFORM the following to Emergency Borate using V2514, EMERGENCY BORATE: D. OPEN V2514 EMERGENCY BORATE
. STANDARD: POSITION V2514 control switch to OPEN and OBSERVE that valve does NOT open. EXAMINER'S CUE:
EVALUATOR NOTE:
COMMENTS: FAULTED STEP
_____ SAT
_____ UNSAT STEP 12 (4.1): Contingency Actions STANDARD: GO TO Section 4.2 Step 5 EXAMINER'S CUE:
COMMENTS:
_____ SAT
_____ UNSAT STEP 13 (4.2.5)
- IF unable to Emergency Borate using V2514, THEN PERFORM the following:
A. STOP the running BORIC ACID PUMPS STANDARD: POSITIONS the control switch for the 2A and 2B BORIC ACID PUMPS to the STOP position EXAMINER'S CUE:
COMMENTS:
_____ SAT
_____ UNSAT STEP 14 (4.2.5)
- IF unable to Emergency Borate using V2514, THEN PERFORM the following:
B. OPEN V2508 VALVE (BA Gravity Feed B)
STANDARD: POSITION V250 8 VALVE (BA Gravity Feed B) to OPEN and observes the valve does not open.
EXAMINER'S CUE:
COMMENTS:
FAULTED STEP
_____ SA T
_____ UNSAT
JPM S-7 SIMULATOR Page 8 of 12 STEP 15 (4.2.5)
- IF unable to Emergency Borate using V2514, THEN PERFORM the following C. OPEN V2509 VALVE (BA Gravity Feed A)
STANDARD: POSITION V250 9 VALVE (BA Gravity Feed A) to OPEN and observes the valve does not open. EXAMINER'S CUE:
COMMENTS: FAULTED STEP
_____ SAT
_____ UNSAT STEP 15 (4.2.5)
- IF unable to Emergency Borate using V2514, THEN PERFORM the following
D. CLOSE V2501, VCT OUTLET VALVE.
STANDARD: GO TO Section 4.2 Step 6 prior to closing V2501 EXAMINER'S CUE:
EXAMINERS NOTE:
If applicant closes V2501 at this time the Charging pumps will trip within a few seconds due to low suction pressure. Applicant should NOT close V2501 at this time.
COMMENTS:
_____ SAT
_____ UNSAT STEP 1 6 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following:
A. OPEN V2504, REFUEL WATER TO CHARGING PUMPS STANDARD: POSITION V2504 to OPEN EXAMINER'S CUE:
COMMENTS:
CRITICAL STEP
_____ SAT
_____ UNSAT
JPM S-7 SIMULATOR Page 9 of 12 STEP 17 (4.2.6):
IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following:
B. ENSURE V2501, VCT Outlet Valve Closed STANDARD: POSITION V2501 to CLOSE.
EXAMINER'S CUE:
COMMENTS:
CRITICAL STEP
_____ SAT
_____ UNSAT STEP 1 8 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following:
C. CLOSE V2508, BA GRAVITY FEED B
STANDARD: POSITION V2508 to CLOSE or determines valve did not open from previous step. EXAMINER'S CUE:
COMMENTS:
_____ SAT
_____ UNSAT STEP 1 8 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following
D. CLOSE V2509 BA GRAVITY FEED A STANDARD: POSITION V2509 to CLOSE or determines valve did not open from previous step. EXAMINER'S CUE:
COMMENTS:
_____ SAT
_____ UNSAT
JPM S-7 SIMULATOR Page 10 of 12 STEP 20 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following
E. CLOSE V2514 EMERGENCY BORATE STANDARD: POSITION V2514 to CLOSE or determines valve did not open from previous step. EXAMINER'S CUE:
COMMENTS:
_____ SAT
_____ UNSAT STEP (done):
Notify US that task is complete.
STANDARD: NOTIFY ANPS that Reactivity Control has been verified and is being met with contingencies
, emergency boration is in progress via RWT to suction of charging pumps.
EXAMINER'S CUE:
US ACKNOWLEDGES. THIS JPM IS COMPLETE.
COMMENTS:
END OF TASK
_____ SAT
_____ UNSAT STOP TIME: __________
S-7 Page 11 of 12 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
A reactor trip on Unit 2 has just occurred following a 45
-day run at 100% power.
Initiating Cues:
You are the Board RCO. The US has directed you to perform the actions of 2-EOP-01, 'Standard Post Trip Actions' Reactivity Control Safety Function.
S-7 Page 12 of 12 SIMULATOR JPM SETUP
- 1. RESTORE IC-1, 100% power, MOL.
- 2. UNFREEZE simulator.
- 3. SELECT CONFIGURE and CHANGE to JPM. 4. SELECT Lesson S-7 EB Lesson and START the lesson.
- 5. TRIGGER the step to stick out 2CEAs and fail V2514, V2509 and V2508 fail closed
. 6. TRIGGER the step for reactor trip. The simulator will automatically freeze after 10 seconds.
- 7. MAKE a SNAPSHOT if more than one student will be performing the JPM.
- 8. FREEZE simulator until student is ready. The audible alarms will be reinstated when the simulator is placed in RUN.
NRC C-1 Unit 1 Control Room Page 1 of 6
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE PUMP ECCS AREA SUMPS TO RDT POST LOCA
- UNIT 1 NRC C-1 Unit 1 Control Room
Applicant Examiner Reminder to the TPE Evaluator Refer to the OJT/TPE Procedure and follow the instructions.
JOB PERFORMANCE MEASURE NRC C-1 Unit 1 Control Room Page 2 of 6 Task: 07006020, Pump ECCS Area Sumps to the Containment (Pump ECCS Area Sumps to the Reactor Drain Tank post LOCA
- Unit 1). Faulted JPM?
No Facility JPM #:
0821089 K/A Rating(s):
A.0 4.0 2, (4.1) ECCS: Ability to manually operate and/or monitor in the control room: Valves Duty Area(s):
N/A Task Information:
N/A Task Standard:
This JPM is complete when the US is notified that the ECCS Area Sumps are aligned to the Reactor Drain Tank.
Evaluation Location:
Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
1-EOP-03, "Loss of Coolant Accident
" Validation Time:
5 minutes Time Critical:
No Tools/Equipment/Procedures Needed:
1-EOP-03, "Loss of Coolant Accident
", (Step 40)
Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS NRC C-1 Unit 1 Control Room Page 3 of 6 SPECIFIC DIRECTIONS:
The task you are to perform is:
Align ECCS Area Sumps to the Reactor Drain Tank post LOCA
- Unit 1. The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 1 has experienced a LOCA. RAS has occurred and all normal post
-trip power is available.
INITIATING CUES:
You are the Desk RCO. The Unit Supervisor has directed you to align the ECCS Sumps to the Reactor Drain Tank in accordance with 1
-EOP-03, "Loss of Coolant Accident."
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC C-1 Unit 1 Control Room Page 4 of 6 START TIME: __________
1-EOP-03, "Loss of Coolant Accident" Step 4 0 Align ECCS Sumps to RDT I f RAS is present, Then ALIGN the ECCS sumps to the reactor drain tank by performing ALL of the following:
STEP 1 (40.A): PLACE the ECCS Area Leakage System control switch, located on CRAC panel, to the RDT POSITION. STANDARD: POSITION the ECCS Area Leakage System control switch to RDT. EXAMINER'S CUE:
ECCS Area Leakage System control switch indicates RDT COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT STEP 2 (40.B): VERIFY ALL of the following:
- 1. HCV-06-9, RDT Pump Suction, CLOSES
- 2. HCV-06-7, Sump Pump to EDT, CLOSES
- 3. HCV-06-8, Sump Pump to RDT, OPENS STANDARD: VERIFY HCV-06-9 and HCV-06-7 are CLOSED and HCV-06-8 is OPEN. EXAMINER'S CUE:
HCV-06-9 indicates Green light ON, Red light OFF
, HCV-06-7 indicates Green light ON, Red light OFF
, HCV-06-8 indicates Green light OFF, Red light ON COMMENTS:
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC C-1 Unit 1 Control Room Page 5 of 6 STEP 3 (40.C): PERFORM BOTH of the following on RTGB 105:
- 1. PLACE V6301, Rx Drn Tk Cntmt Isol, to RESET and then to OPEN.
STANDARD: POSITION V6301 control switch to RESET, then to OPEN. EXAMINER'S CUE:
V6301 indicates Green light OFF, Red light ON COMMENTS: CRITICAL STEP
_____ SAT _____ UNSAT STEP 4 (40.C): PERFORM BOTH of the following on RTGB 105:
- 2. PLACE V6302, Rx Drain Tank Cntmt Isolation, to RESET and THEN to OPEN. STANDARD: POSITION V6302 control switch to RESET, then to OPEN. EXAMINER'S CUE:
V6302 indicates Green light OFF, Red light ON COMMENTS: CRITICAL STEP _____ SAT _____ UNSAT STEP 5: VERIFY Annunciator Y
-19, ECCS Pump Room Leakage Valves Misaligned, is LIT. STANDARD: VERIFY Annunciator Y
-19 is LIT. EXAMINER'S CUE:
-19 is LIT COMMENTS:
_____ SAT _____ UNSAT STEP (done):
NOTIFY the US that the ECCS Sumps have been ALIGNED to the RDT.
STANDARD: NOTIFY the US that the ECCS Sumps have been ALIGNED to the RDT.
EXAMINER'S CUE
- Unit Supervisor ACKNOWLEDGES COMMENTS: END OF TASK
_____ SAT _____ UNSAT STOP TIME: __________
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET Page 6 of 6 NRC C-1 (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 1 has experienced a LOCA. RAS has occurred and all normal post
-trip power is available.
INITIATING CUES:
You are the Desk RCO. The Unit Supervisor has directed you to align the ECCS Sumps to the Reactor Drain Tank in accordance with 1
-EOP-03, "Loss of Coolant Accident."
NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 1 of 9
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE ALIGN UNIT 2 CST TO SUPPLY 1C AFW PUMP NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Applicant Examiner Job Performance Measure NRC P-1 NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 2 of 9 Task Number: 03105050 and 07009055 Task Title:
Align AFW System in Response to Component Malfunction/Failure Faulted JPM:
Yes No Facility JPM #
N/A K/A Knowledge of AFW design feature(s) and/or interlock(s) which provide for the followi ng: K4.01 Water sources and priority of use 4.1 Duty Areas:
N/A Task Information:
N/A Task Standard:
N/A Evaluation Location Performance Level Simulator In Plant Perform Simulat e Discuss Lab Other References
- 1-A OP-09.02, "Auxiliary Feedwater" Validation Time:
15 Minutes Time Critical Yes No Tools/Equipment/Procedures Needed:
Standard Personal Protective Equipment Flashlight Radio Watch Stander Key Ring for Locked Valves 1-A OP-09.02, "Auxiliary Feedwater" Specific Safety Concerns, PPE and Hazards associated with the task:
None. Radiological Protection and RWP Requirements:
None Job Performance Measure NRC P-1 NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 3 of 9 Specific Directions:
The Task you are to perform is
- Align Unit 2 CST to Supply 1C AFW Pump The performance level to be used for this JPM is Perform or Simulate. (Circle the performance level being used for this implementation of the JPM.)
This Is Not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs
. Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
Initial Conditions:
Unit 1 is experiencing a Total Loss of Feedwater event. Unit 1 CST in unavailable, Unit 2 CST level is 43 Feet.
Initiating Cues:
You are the Unit 1 NPO. The Unit 1 Unit Supervisor has directed you to line up the Unit 2 CST to supply the 1C AFW Pump IAW 1
-A OP-09.02, "Auxiliary Feedwater
," Attachment 5 , Steps 1.A through 1.D, and 1.F.1 through 1.
F.4.
Job Performance Measure NRC P-1 NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 4 of 9 PERFORMANCE CHECKLIST Start Time:
1-A OP-09.02, "Auxiliary Feedwater
," Attachment 5 STEP 1(1.A). Notify Unit 2 Control Room.
_____ Sat
_____ Unsat Standard: NOTIFY Unit 2 Control Room that Unit 2 CST will be ALIGNED to supply the 1C AFW Pump.
Examiner's Cue: Unit 2 Control Room ACKNOWLEDGES Comments: NOTE In the event Unit 2 CST is utilized to supply condensate to Unit 1, a minimum of 182,000 gallons (19'6") must be maintained in the Unit 2 CST unless Unit 2 is in Modes 4, 5, or 6. This is to ensure that Unit 2 has the capability to cool the RCS to less than 350 degrees.
CAUTION During the performance of this attachment, close communications with the Unit 2 Control Room must be maintained to ensure administrative requirements and safety issues are considered in regards to both units. In the event the Unit 1 AFW Pump suction pressure decreases to 3 psig during the performance of this attachment, the AFW Pump discharge valves must be throttled to maintain suction pressure.
Performance of this attachment will require Unit 1 to enter action statement for Tech. Spec. 3.7.1.2 and 3.7.1.3. Unit 2 will be in action statement for Tech. Spec. 3.7.1.3 and possibly 3.7.1.2 depending on valve selection in Attachment 5 Step 1.C.
Job Performance Measure NRC P-1 NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 5 of 9 STEP 2 (1.B). ENSURE all Unit 1 Auxiliary Feedwater pumps are OFF.
_____ Sat
_____ Unsat Standard: ENSURE all Unit 1 Auxiliary Feedwater pumps are OFF.
Examiner's Cue: All Unit 1 Auxiliary Feedwater pumps are OFF.
Comments: STEP 3 (1.C) At the Unit 2 CST, PERFORM one of the following to establish a flowpath from the Unit 2 CST to Unit 1 AFW pumps: 1. IF the Unit 2 CST level is greater than 40 feet, THEN OPEN V12803, CST INLET TO / FROM UNIT 1 ISOL.
(CST/23/N-6/E-21) Critical Step
_____ Sat
_____ Unsat Standard: UNLOCK and POSITION V12803 t o OPEN (counterclockwise) and then RELOCK. Examiner's Cue: V12803 is fully counter clockwise and LOCKED.
Comments: Initiating Cue gives Unit 2 CST level as 43 Feet. Valve does not have to be re
-locked to meet the Critical Step.
STEP 4 (1.C) At the Unit 2 CST, PERFORM one of the following to establish a flowpath from the Unit 2 CST to Unit 1 AFW pumps: 2. IF the Unit 2 CST level is less than or equal to 40 feet, THEN PERFORM one of the following:
OPEN V12801, 2C AFW PUMP SUCT TO / FROM UNIT 1 ISOL.
(CST/23/N-14/E-20) OPEN V12802, 2A/2B AFW PUMP SUCT TO / FROM UNIT 1 ISOL. (CST/23/N-14/E-20)
_____ Sat
_____ Unsat Standard: Determined to be NA, due to initiating cue.
Examiner's Cue: Initiating Cue gives Unit 2 CST level as 43 Feet.
Comments:
Job Performance Measure NRC P-1 NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 6 of 9 STEP 5. (1.D) OPEN V12805, CST CROSSTIE TO UNIT 1 ISOL.
(CST/24/N-685/E-1191) Critical Step
_____ Sat
_____ Unsat Standard: UNLOCK and POSITION V12805 fully counter clockwise. Examiner's Cue: V12805 is Fully counter clockwise Comments: Valve does not have to be re
-locked to meet the Critical Step. STEP 6. (1.F) To supply 1C AFW pump, PERFORM the following:
(1) CLOSE V12506, CST OUTLET TO 1C AFW PUMP SUCT ISOL at the Unit 1 CST. (CST/23/N
-9/E-19) Critical Step
_____ Sat
_____ Uns at Standard: UNLOCK and POSITION V12506 fully clockwise
. Examiner's Cue: V12506 is fully clockwise.
Comments: Valve does not have to be re
-locked to meet the Critical Step. STEP 7 (1.F). To supply 1C AFW pump, PERFORM the following:
(2) OPEN V12175, TO/FROM UNIT 2 FROM 1C AFW PUMP SUCT LINE ISOL, at the Unit 1 CST. (CST/21/N
-13/E-24) Critical Step
_____ Sat
_____ Unsat Standard: UNLOCK and POSITION V12175 fully counter clockwise. Examiner's Cue: V12175 is fully counter clockwise
. Comments: Valve does not have to be re
-locked to meet the Critical Step.
Job Performance Measure NRC P-1 NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 7 of 9 STEP 8 (1.F). To supply 1C AFW pump, PERFORM the following:
(3) ENSURE PI-12-18C, 1C AFW PUMP SUCT PRESS, instrument isolation valve is OPEN. (TRSL/27/N
-T3/W-TA) _____ Sat
_____ Un sat Standard: POSITION Pl-12-18C instrument isolation to fully counter clockwise
. Examiner's Cue: PI-12-18C instrument isolation valve is fully counter clockwise.
Comments: STEP 9 (1.F). To supply 1C AFW pump, PERFORM the following:
(4) VERIFY greater than 3 psig suction pressure on PI 18C, 1C AFW PUMP SUCTION PRESSURE.
_____ Sat
_____ Unsat Standard: VERIFY GREATER THAN 3 psig on PI 18C. Examiner's Cue: PI-12-18C INDICATES 15 psig.
Comments:
Job Performance Measure NRC P-1 NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 8 of 9 STEP 10 (1.F).
IF feeding S/Gs with 1C Auxiliary Feedwater Pump, THEN PERFORM the following (5) CLOSE V09399, 1C AFW PUMP RECIRC ISOL (TRSL/23/N
-T3/W-TA) Critical Step
_____ Sat
_____ Unsat Standard: POSITION V09399 to the fully clockwise position. Examiner's Cue: V09399 is fully clockwise.
Comments:
STEP 6. Notify Unit 1 Unit Supervisor that the task is complete.
_____ Sat
_____ Unsat Standard: NOTIFY Unit 1 Unit Supervisor that 1C AFW Pump is lined up to take a suction on the Unit 2 CST IAW 1
-A OP-09.02, "Auxiliary Feedwater".
Examiner's Cue: Unit 1 Unit Supervisor ACKNOWLEDGES.
Comments: If candidate continues onward, then inform him "This JPM is complete."
END OF TASK St op Time:
Job Performance Measure NRC P-1 NRC P-1 Page 9 of 9 CANDIDATE CUE SHEET Initial Conditions:
Unit 1 is experiencing a Total Loss of Feedwater event. Unit 1 CST in unavailable, Unit 2 CST level is 43 Feet.
Initiating Cues:
You are the Unit 1 NPO. The Unit 1 Unit Supervisor has directed you to line up the Unit 2 CST to supply the 1C AFW Pump IAW 1-AOP-09.02, "Auxiliary Feedwater," Attachment 5, Steps 1.A through 1.D, and 1.F.1 through 1.F.
- 5.
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 1 of 11
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE HYDROGEN PURGE SYSTEM OPERATION
- UNIT 1 Unit 1 RAB 43' FAN ROOM NRC P-2
Applicant Examiner NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 2 of 11
Task: Hydrogen Purge System Operation
- Unit 1 Faulted JPM?
No Facility JPM #:
0821098 K/A Rating(s):
028 A2.02 / 3.5 Malfunctions or operations on the HRPS; and (b) based on those predictions, use procedures to correct, control or mitigate the consequences of those malfunctions or operations:
LOCA condition and related concern over hydrogen Duty Area(s):
N/A Task Information:
N/A Task Standard:
This JPM is complete when the Hydrogen Purge System is in operation with a 100 CFM flowrate established.
Evaluation Location:
Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
1-EOP-99, Appendix N, Hydrogen Purge System Operation Validation Time:
20 minutes Time Critical:
No Tools/Equipment/Procedures Needed:
1-EOP-99, Appendix N, Hydrogen Purge System Operation Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
RWP Required
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 3 of 11 SPECIFIC DIRECTIONS:
The task you are to perform is:
Hydrogen Purge System Operation
- Unit 1 The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
The unit is engaged in mitigating a LOCA. SIAS has been reset and RAB Main Exhaust Fan, HVE-10B is running. The TSC and Chemistry have given permission to place the Hydrogen Purge System in operation to ventilate the Containment.
INITIATING CUES:
You are the SNPO. You have been directed by the Unit Supervisor to locally operate the Hydrogen Purge system IAW 1
-EOP-99, Appendix N. Establish a 100CFM flowrate using HVE
-7B. NOTE TO EXAMINER:
Initiating cue identifies student as SNPO. No key will be required due to cues provided in steps 9 and 10.
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 4 of 11 START TIME: __________
Operate the Containment Hydrogen Purge System as follows:
STEP 1 (1): ENSURE ONE RAB Main Exhaust Fan, HVE
-10A (B), is RUNNING, if available.
STANDARD: ENSURE HVE-10A or HVE
-10B is RUNNING EXAMINER'S CUE:
HVE-10B is RUNNING (from initiating cue)
COMMENT S: _____ SAT _____ UNSAT STEP 2 (2) : VERIFY the following valves are LOCKED CLOSED:
V25015, Pen.58 to HVE
-7A / 7B Gate
- Filter Bypass STANDARD: VERIFY V25015 is LOCKED CLOSED EXAMINER'S CUE:
V25015 handwheel ROTATED CLOCKWISE until hard stop REACHED and LOCKED.
EVALUATOR'S NOTE:
Penetration 58 is between filter train and containment wall COMMENTS:
_____ SAT
_____ UNSAT STEP 3 (2) : VERIFY the following valves are LOCKED CLOSED:
V-25-16, Pen. 58 to HVE
-7A / 7B Gate
- Filter Bypass STANDARD: VERIFY V-25-16 is LOCKED CLOSED EXAMINER'S CUE: V 16 handwheel ROTATED CLOCKWISE until hard stop REACHED and LOCKED EVALUATOR'S NOTE:
Penetration 58 is between filter train and containment wall COMMENTS:
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 5 of 11 STEP 4 (3) : CLOSE FCV-25-9, Pen-57 to HVE-7 Intake STANDARD: DEPRESS the CLOSE pushbutton for FCV-25-9 until FCV-25-9 indicates CLOSED. EXAMINER'S CUE:
FCV-25-9 MECHANICAL POINTER INDICATES '0'
. Light indication is GREEN EVALUATOR'S NOTE: The pushbutton for FCV 9 is located inside Junction Box B1117 on the column south west of FCV-25-9. The valve position indicator is located on the outside cover of Junction Box B1117. Position indication can also be verified by using the dial indicator and mechanical pointer located on FCV-25-9.
COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT STEP 5 (4) : UNLOCK and OPEN the following valves:
V25013, Pen. 57 to HVE
-7A / 7B Gate Suction STANDARD: UNLOCK and OPEN V25013 EXAMINER'S CUE:
V25013 handwheel UNLOCKED and ROTATED COUNTER CLOCKWISE until hard stop REACHED EVALUATOR'S NOTE:
Penetration 57 is between filter train and containment wall COMMENTS:
CRITICAL STEP
_____ SAT
_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 6 of 11 STEP 6 (4) : UNLOCK and OPEN the following valves:
V-25-14, Pen. 57 to HVE
-7A / 7B Gate Suction STANDARD: UNLOCK and OPEN V-25-14 EXAMINER'S CUE: V 14 handwheel UNLOCKED and ROTATED COUNTER CLOCKWISE until hard stop REACHED EVALUATOR'S NOTE:
Penetration 57 is between filter train and containment wall COMMENTS:
CRITICAL STEP _____ SAT _____ UNSAT STEP 7 (5): VERIFY V-25-18, HVE-7A / 7B Disch. Gate to SBVS, is CLOSED.
STANDARD: VERIFY V-25-18 is CLOSED EXAMINER'S CUE: V 18 handwheel ROTATED CLOCKWISE until hard stop REACHED EVALUATOR'S NOTE:
V-25-18 is located next to V 17 in overhead COMMENTS:
_____ SAT _____ UNSAT STEP 8 (6): OPEN V-25-17, "HVE-7A/7B Disch. Gate to Vent Stack." STANDARD: POSITION V-25-17 to OPEN EXAMINER'S CUE: V 17 handwheel ROTATED COUNTER CLOCKWISE until hard stop REACHED EVALUATOR'S NOTE:
Valve is above HVE
-6B COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 7 of 11 STEP 9 (7): UNLOCK and OPEN the following valves:
V25011, Makeup Air Before Pen. 56 Gate (19.5' Elev.)
STANDARD: UNLOCK and OPEN V25011 EXAMINER'S CUE: When candidate reaches this step state that V25011 handwheel has been UNLOCKED and OPENED by an other operator. EVALUATOR'S NOTE:
Question the Applicant where the valve is located.
(Located in the Purge valve room, 19.5' between the RAB and Fuel Handling Bldg) When location identified, the above cue may be given.
COMMENTS:
CRITICAL STEP (location of valve) _____ SAT _____ UNSAT STEP 1 0 (7) : UNLOCK and OPEN the following valves:
V-25-12, Makeup Air Before Pen. 56 Gate (19.5' Elev.)
STANDARD: UNLOCK and OPEN V-25-12 EXAMINER'S CUE:
When candidate reaches this step state that V-25-12 handwheel has been UNLOCKED and OPEN ED by an other operator.
EVALUATOR'S NOTE:
Question the Applicant where the valve is located. (Located in the Purge valve room, 19.5' between the RAB and Fuel Handling Bldg) When location identified, the above cue may be given.
COMMENTS:
CRITICAL STEP (locatio n of valve) _____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 8 of 11 STEP 1 1 (8): ENSURE FCV 10, HVS-4 Plenum to HVE
-7 Intake, is THROTTLED OPEN.
STANDARD: POSITION FCV-25-10 to THROTTLED OPEN
. EXAMINER'S CUE:
FCV-25-10 IS ROTATED COUNTER CLOCKWISE, currently at 50%.
EVALUATOR'S NOTE:
Control panel is located on column near north end of the 6A filter train COMMENTS: CRITICAL STEP _____ SAT _____ UNSAT STEP 1 2 (9): START ONE Hydrogen Purge Fan.
HVE-7A OR HVE-7B STANDARD: DEPRESS START pushbutton for HVE-7B, (from initiating cue)
EXAMINER'S CUE:
HVE-7 B RED light ON, GREEN light OFF
.
EVALUATOR'S NOTE:
Control panel is located on column next to fans COMMENTS: CRITICAL STEP _____ SAT _____ UNSAT STEP 1 3 (10): THROTTLE OPEN FCV 9, Pen-57 to H VE-7 Intake, to obtain between 90 and 100 CFM on FR 1, Local Flow Recorder STANDARD: DEPRESS (and hold) THE OPEN PUSHBUTTON until the desired flowrate of between 90 and 100cfm is obtained.
EXAMINER'S CUE: FCV-25-9 rotating COUNTER CLOCKWISE, FR-25-1 INDICATES approximately 95cfm COMMENTS: CRITICAL STEP _____ SAT
_____ UNSAT NOTE Hydrogen Purge Fans will not operate if FCV 10 position is between full closed and approximately 10% open.
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 9 of 11
STEP 1 4 (11): MONITOR the following on TR 2 in the Control Room Channel 1, Before Hydrogen Purge Charcoal Absorber (TE 18) Channel 2, Hydrogen Purge Charcoal Absorber (TE 19) Channel 3, Hydrogen Purge Charcoal Absorber (TE 20) Channel 4, After Hydrogen Purge Charcoal Absorber (TE 21) STANDARD: REQUEST Control Room Monitor the above points on TR-25-2 EXAMINER'S CUE:
Control Room is MONITORING Channels 1, 2, 3 & 4
. COMMENTS:
_____ SAT
_____ UNSAT
STEP 1 5 (12): ADJUST FCV 10 to maintain charcoal absorber temperature below alarm set point on TR 2 (RTGB-106). STANDARD: OPEN FCV-25-10 as necessary to MAINTAIN temperature <190 F EXAMINER'S CUE:
Control Room informs you that TR 2 is Indicating 190F and Increasing. RCO DIRECTS you to ADJUST flow to MAINTAIN temperature at <190 F. If asked, Alarm Setpoint is 190 F. EXAMINER'S CUE:
Open Pushbutton DEPRESSED momentarily, Control Informs you that TR 2 is INDICATING 175F and Stable EVALUATOR'S NOTE:
Located on the east side of the filter train, Indications by local TE: TI HVE-7-1 and TI-25-HVE-7-2 COMMENTS:
CRITICAL STEP _____ SAT
_____ UNSAT NOTE Hydrogen Purge Fans will not operate if FCV 10 position is between full closed and approximately 10% open.
NOTE High charcoal temperatures are postulated to occur only as a result of restricted air flows rates less than 55 cf
- m. Iodine desorption occurs at approximately 300°F and charcoal ignition at approximately 640°F
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 10 of 11 STEP 16 (1 3): Monitor Plant Stack radiation levels and Containment hydrogen concentration during purge operation
. STANDARD: REQUEST Control Room to MONITOR radiation and hydrogen levels EXAMINER'S CUE: Control Room Informs you that they will Monitor Plant Vent Radiation levels, and containment hydrogen concentration.
COMMENTS: END OF TASK
_____ SAT
_____ UNSAT STOP TIME: __________
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET NRC P-2 Page 11 of 11 (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
The unit is engaged in mitigating a LOCA. SIAS has been reset and RAB Main Exhaust Fan, HVE-10B is running. The TSC and Chemistry have given permission to place the Hydrogen Purge System in operation to ventilate the Containment.
INITIATING CUES:
You are the SNPO. You have been directed by the Unit Supervisor to locally operate the Hydrogen Purge system IAW 1
-EOP-99, Appendix N. Establish a 100CFM flowrate using HVE
-7B.
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 1 of 9
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE DROPPED OR MISALIGNED CEA ABNORMAL OPERATIONS , PERFORM MANIPULATIONS OUTSIDE THE CONTROL ROOM
- UNIT 1 NRC P-3 Cable Spreading Room Unit 1
Applicant Examiner JOB PERFORMANCE MEASURE NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 2 of 9 Task: CEA AOP, Perform Manipulations Outside the Control Room
- Unit 1 Faulted JPM?
Yes Facility JPM #:
0821111 K/A: 001 K6.11 / 2.9 Knowledge of the effect of a loss or malfunction on the following CRDS components:
Location and operation of CRDS fault detection (trouble alarms) and reset system, including rod control annunciator. Duty Area(s):
N/A Task Information:
N/A Task Standard:
JPM is complete when IC/OPS notified CEA 62 power has been restored
. Evaluation Location:
Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
1-AOP-66.01 "Dropped or Misaligned CEA Abnormal Operations
". Validation Time:
20 minutes Time Critical:
No Tools/Equipment/Procedures Needed:
1-AOP-66.01 "Dropped or Misaligned CEA Abnormal Operations", Attachment
- 5. Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 3 of 9 SPECIFIC DIRECTIONS:
The task you are to perform is:
CEA ONOP, Perform Manipulations Outside the Control Room
- Unit 1 The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 1 was at 100% power late in core life. The operator was inserting CEAs for ASI control when CEA 62 dropped to the bottom of the core.
Reactor and turbine power were matched.
All attempts from the control room to operate CEA 62 have failed.
INITIATING CUES:
The US has directed the operator to check the status of CEDM coil power supply panels IAW 1-AOP-66.01, "Dropped or Misaligned CEA Abnormal Operations", Attachment 5, Section 3.0, "Troubleshooting Actions for Inoperable CEA(S)".
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 4 of 9 START TIME: __________
ATTACHMENT 5 Section 3.0 STEP 1: (3.0.1) INSPECT affected CEDM power supplies as follows
- (CPP cabinets, cable spreading room)
A. VERIFY red CIRCUIT BREAKER CLOSED light is ON.
STANDARD: VERIFY the RED CIRCUIT BREAKER CLOSED light is ILLUMINATED
. EXAMINER'S CUE:
RED "CIRCUIT BREAKER CLOSED" LIGHT IS EXTINGUISHED, NOT ILLUMINATED
. COMMENTS:
FAULTED STEP _____ SAT _____ UNSAT STEP 2: (3.0.1) INSPECT affected CEDM power supplies as follows
- (CPP cabinets, cable spreading room)
B. IF red CIRCUIT BREAKER CLOSED light is OFF AND affected CEA has been dropped, THEN OPEN and CLOSE affected CEA CIRCUIT BREAKER
. (behind the affected CEA's control panel door) STANDARD: OPEN CEA 62's control panel door, and POSITION the circuit breaker to OFF, then POSITION the breaker to ON. VERIFY the RED CIRCUIT BREAKER CLOSED light is ILLUMINATED
.
EXAMINER'S CUE:
When positioned, the breaker is OFF
. When positioned, the breaker is ON.
If asked, the red CIRCUIT BREAKER CLOSED light is ILLUMINATED
. COMMENTS:
CRITICAL STEP
_____ SAT
_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 5 of 9 STEP 3: (3.0.1) INSPECT affected CEDM power supplies as follows
- (CPP cabinets, cable spreading room)
C. VERIFY white CIRCUIT BREAKER OPEN light is OFF
. STANDARD: VERIFY the white CIRCUIT BREAKER OPEN light is NOT ILLUMINATED
. EXAMINER'S CUE:
WHITE "CIRCUIT BREAKER OPEN" LIGHT IS NOT ILLUMINATED
. COMMENTS:
_____ SAT _____ UNSAT STEP 4:(3.0.1) INSPECT affected CEDM power supplies as follows:
(CPP cabinets, cable spreading room)
D. On the affected ACTM, VERIFY green POWER LED is ON
. STANDARD: OBSERVE GREEN "Power On" LED on the Coil Power Programmer timer module ILLUMINATED
. EXAMINER'S CUE:
GREEN "POWER ON LED" IS ILLUMINATED
. COMMENTS:
_____ SAT _____ UNSAT STEP 5:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows
- A. VERIFY red power supply alarm lights are OFF
. (two lights per CEA on rear of CPP cabinets
) STANDARD: VERIFY the two red power supply lights for CEA 62 are EXTINGUISHED EXAMINER'S CUE: THE TWO POWER SUPPLY LIGHTS FOR CEA 62 ARE ILLUMINATED, ON
. COMMENTS:
FAULTED STEP
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 6 of 9 STEP 6:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:
B. IF any power supply alarm lights are ON, THEN RESET them as follows: 1) RECORD lights that are ON.
STANDARD: RECORDS the two red power supply lights for CEA 62 are ON EXAMINER'S CUE: NONE. COMMENTS: _____ SAT _____ UNSAT STEP 7:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:
B. IF any power supply alarm lights are ON, THEN RESET them as follows: 2) PRESS lights that are ON to reset them to OFF condition.
STANDARD: DEPRESS the two red power supply lights for CEA 62.
EXAMINER'S CUE: BOTH RED POWER SUPPLY LIGHTS ARE EXTINGUISHED
. COMMENTS:
CRITICAL STEP
_____ SAT _____ UNSAT STEP 8:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows
- C. TEST power supply alarm light bulbs on affected CEA as follows:
- 1) PRESS pushbutton for affected CEA on side of CEDM 15 V TRANSIENT MONITOR SYSTEM assembly to latch alarm lights ON for bulb
-check. STANDARD: DEPRESS the button on the side of the Transient Monitor System that corresponds to CEA 62, and VERIFY the two red power supply alarm lights are ILLUMINATED
. EXAMINER'S CUE: THE TWO RED LIGHTS FOR CEA 62 ARE ILLUMINATED
. COMMENTS: _____ SAT
_____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 7 of 9 STEP 9:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:
C. TEST power supply alarm light bulbs on affected CEA as follows:
- 2) RESET alarm lights to OFF condition by pressing them.
STANDARD: DEPRESS the two red alarm lights for CEA 62, and VERIFY the two red power supply alarm lights are EXTINGUISHED
. EXAMINER'S CUE: THE TWO RED LIGHTS FOR CEA 62 ARE EXTINGUISHED
. COMMENTS:
_____ SAT
_____ UNSAT STEP 10:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:
C. TEST power supply alarm light bulbs on affected CEA as follows:
- 3) IF alarm lights are still ON after being reset, THEN NOTIFY I&C.
STANDARD: DETERMINE step is N/A.
EXAMINER'S CUE: NONE. COMMENTS: _____ SAT _____ UNSAT STEP 1 1:(3.0.3) ENSURE HVA-4 and HVA-5 Cable Spreading Room A/C units are running
. STANDARD: VERIFY HVA-4 and HVA-5 Cable Spreading Room A/C units are running.
EXAMINER'S CUE: HVA-4 and HVA-5 Cable Spreading Room A/C units are running. COMMENTS:
_____ SAT _____ UNSAT
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 8 of 9 STEP 1 2:(3.0.4) VERIFY cooling fans for CPP cabinet sections 3 through 18 are RUNNING.
STANDARD: VERIFY either visually or by presence of air flow that the fans in sections 3 through 18 are runni ng. EXAMINER'S CUE: FANS IN SECTION 3 THROUGH 18 ARE RUNNING
. COMMENTS:
_____ SAT _____ UNSAT STEP 1 3:(3.0.5) EXAMINE CEAPDS and CEDS and CPP cabinets for abnormal conditions.
STANDARD: VERIFY no abnormal conditions on the cabinets by visual observations and comparing known normal indications to possible abnormal indications
. EXAMINER'S CUE: NO ABNORMAL CONDITIONS APPEAR TO EXIST
. COMMENTS:
_____ SAT
_____ UNSAT STEP 1 4(3.0.6) NOTIFY I&C of any problems fou n d. STANDARD: REPORT red CIRCUIT BREAKER ON light and power supply alarm light problems to I&C via telephone.
EXAMINER'S CUE: I&C ACKNOWLEDGES
. COMMENTS:
END OF TASK
_____ SAT _____ UNSAT
STOP TIME: __________
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET NRC P-3 Page 9 of 9 (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 1 was at 100% power late in core life.
The operator was inserting CEAs for ASI control when CEA 62 dropped to the bottom of the core.
Reactor and turbine power were matched.
All attempts from the control room to operate CEA 62 have failed.
INITIATING CUES:
The US has directed the operator to check the status of CEDM coil power supply panels IAW 1-AOP-66.01, "Dropped or Misaligned CEA Abnormal Operations", Attachment 5, Section 3.0, "Troubleshooting Actions for Inoperable CEA(S)".
.