| Q | CCA | Title |
---|
05000306/FIN-2013011-01 | 2014Q1 | H.7 | Steam Generator Blowdown (SGBD) Pipe Support Anchorages Failure to Meet Design Requirements |
05000306/FIN-2013011-02 | 2014Q1 | H.6 | Outside Lift System (OlS) Girder Failure to Meet American Institute of Steel Construction (AISC) Requirements |
05000282/FIN-2014002-01 | 2014Q1 | H.14 | Failure to Implement the Scaffolding, Ladders and Cable Trays Platforms Procedure |
05000282/FIN-2014008-01 | 2014Q2 | H.8 | No Compensatory Measure were established for Lack of Fuses Coordination associated with Safe Shutdown Power Supplies |
05000282/FIN-2014007-01 | 2014Q2 | P.6 | Failure to Implement the CAP Action Request Process Procedure |
05000282/FIN-2014007-03 | 2014Q2 | H.13 | Failure to Evaluate Past Operability and Reportability of the Cooling Water System |
05000282/FIN-2014007-04 | 2014Q2 | H.7 | Failure to Update the UFSAR for Pressure Isolation Valves |
05000282/FIN-2014003-04 | 2014Q2 | | Failure to Meet Alternate Source Term Amendment Implementing Requirement |
05000306/FIN-2014004-01 | 2014Q3 | H.4 | Failure to Perform Operability Determination as Required by Procedure |
05000282/FIN-2014004-02 | 2014Q3 | H.1 | Failure to have Adequate Procedures to Address Low Bus Voltage Conditions |
05000282/FIN-2014004-03 | 2014Q3 | | D1 EDG Reverse Power Trip |
05000282/FIN-2014005-01 | 2014Q4 | H.14 | Failure to Implement the Winter Plant Operation Procedure |
05000282/FIN-2014005-03 | 2014Q4 | H.12 | Failure to Follow Procedures during EDG 24 Hour Load Test |
05000282/FIN-2014406-01 | 2014Q4 | | Security |
05000282/FIN-2014005-02 | 2014Q4 | H.2 | Unqualified Reactor Vessel Examination Procedures |