ENS 40108
From kanterella
Revision as of 21:25, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ENS Event | |
|---|---|
07:01 Aug 22, 2003 | |
| Title | Invalid Actuation of the "a" Standby Service Water System |
| Event Description | On August 22,2003, at 0201 Central Time, while operating at 100 percent power, Grand Gulf Nuclear Station experienced an invalid actuation of the 'A' Standby Service Water (SSW) System. A failed DC/DC converter power supply in Panel 1H22P400 for the Division 1 Diesel Generator (DG) resulted in a faulty DG speed monitor signal indicating DG speed greater than 450 revolutions per minute (RPM). The DG was not running since it was already inoperable due to a planned outage. The event occurred during restoration activities to prepare the DG for retest. The invalid DG start signal caused the outside air fan and SSW 'A' to auto start as designed to support DG operation. SSW 'A' started and functioned as designed. No other actuations occurred and all support systems functioned properly.
The licensee notified the NRC Resident Inspector. |
| Where | |
|---|---|
| Grand Gulf Mississippi (NRC Region 4) | |
| Reporting | |
| 10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
| Time - Person (Reporting Time:+133.67 h5.57 days <br />0.796 weeks <br />0.183 months <br />) | |
| Opened: | Gary Ingram 20:41 Aug 27, 2003 |
| NRC Officer: | Arlon Costa |
| Last Updated: | Aug 27, 2003 |
| 40108 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 40108\u003C/a\u003E - \u003Ca href=\"/Grand_Gulf\" title=\"Grand Gulf\"\u003EGrand Gulf\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EInvalid Actuation of the \"a\" Standby Service Water System\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 40108 - Grand Gulf\n","link":"","lat":32.009233333333334,"lon":-91.04695833333334,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (100 %) |
WEEKMONTHYEARENS 402662003-09-27T06:18:00027 September 2003 06:18:00
[Table view]10 CFR 50.73(a)(1), Submit an LER Invalid High Pressure Core Spray (Hpcs) Actuation During Surveillance Testing ENS 401082003-08-22T07:01:00022 August 2003 07:01:00 10 CFR 50.73(a)(1), Submit an LER Invalid Actuation of the "a" Standby Service Water System 2003-09-27T06:18:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_40108&oldid=429014"