AO 75-09:on 750410,control Rod Cap K-7 Inspected Due to Leak Indication & Pinhole Leak Discovered.Cap to Be Replaced
ML20084A811
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/11/1975
From: Platt C
ROCHESTER GAS & ELECTRIC CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20084A805 List:
References
AO-75-09, AO-75-9, NUDOCS 8304050618
Download: ML20084A811 (1)


Text

-.

7

@h%.U k s %

. :: u r;r:r

';m:.,

O Q

. M*

/

~

ROCHESTER GA5 AND ELECTRIC CORPORATION = 89 EAST AVENUE, ROCNESTER. N.Y.1.tS49 i

.... a.x... s.s e.

co Ginna Station April 11,1975 Mr. James P. O'Reilly Director U.S. Nuclear Regulatory Co::ssission

~

Region 1 631 Park Avenue s

King of Prussin Pa.

19t.05

~ -.

Subject:

Abnorcal Occurrence 475-09:

Pinhole leak in cap attached to Magnetic Control Rod Drive Rod Travel Housing K-7

Dear Mr. O'Reilly:

'ihie is to confirn ny phone call to Mr. Paul Kellcgg yesterday to report

~ Abnormal Occurrence 475-09 at Cinna Station.*

At the beginning of the refueling shutdewn that started on March 10, 1975,.

there was en indication of a leak frco K-7 centrol rod housing cap.

This was found by visual inspection. A dye penetrant check of the area did not shcv any lenk.

The head was recoved fron the reaccor and placed on the miwd ou the up.u m. iu ;. fisur uf the evacuit.:uat.

Iu this luc iluu

  • t u.s not possible to do any further checking of the area.

On April 10, 1975, with the head back on the reactor, the K-7 control rod cap was inspected further. The area was cledned with a file and polished with e.nery cloth. Another dye penetrant examinatien of the area shcued a pinhole leak approxinately 1/4" to 3/S" above the seal weld that seals the screwed cap to the Rod Travel llousing.

The PORC net and recoccended that a new cap be purchased and installed.

If a ncv cap is not availabic in time for plant startup, a weld repair procedure will be developed to repair the leak.

, 2. W Charles E. Platt Superintendent CEP:bg cc:

C. J. S*.ra r th cut ISSE Corp.

s..

L. D. White, Jr..KrA' E Corp.

-J; M J. F."Svect, RG6E Corp.

4 8304050618 750422 gDRADDCK 05000244 e

f PDR l<