ML113570486
ML113570486 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 12/21/2011 |
From: | Florida Power & Light Co |
To: | NRC/RGN-II |
References | |
05-335/11-302, 05-389/11-302 JPM NRC S-1, Rev. 0 | |
Download: ML113570486 (116) | |
Text
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO LOSS OF RCP CONTROLLED BLEEDOFF AND FAILED RCP SEALS ON THE 2B1 RCP NRC S-1 Applicant Examiner JPM NRC S-1 Rev 0 SIMULATOR Page 1 of 8
JOB PERFORMANCE MEASURE Task: Respond to loss of RCP controlled bleedoff and failed RCP seals on the 2B1 RCP Alternate Path JPM? Yes Facility JPM #: N/A K/A: 003 A2.01 / 3.5 Ability to (a) predict the impacts of the following malfunctions or operations on the RCPS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:
Problems with RCP seals, especially rates of seal leak-off.
Duty Area(s): N/A Task Information: N/A Task Standard:
This JPM is complete when RCP Bleedoff flow has been established to the QT, the Reactor has been tripped and the 2B1 RCP has been stopped.
Evaluation Location: Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
- 2-0120034 Reactor Coolant Pump Validation Time: 10 minutes Time Critical: No Tools/Equipment/Procedures Needed:
- 2-0120034 Reactor Coolant Pump Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-1 Rev 0 SIMULATOR Page 2 of 8
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is: Re-establish RCP bleedoff flow.
The performance level to be used for this JPM is PERFORM.
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
The Unit is at 100%. RCP controlled bleedoff flow has been lost.
INITIATING CUES:
The US directs you to investigate the loss of RCP controlled bleedoff, in accordance with 2-0120034 Reactor Coolant Pump.
JPM NRC S-1 Rev 0 SIMULATOR Page 3 of 8
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
2-0120034 Reactor Coolant Pump STEP 1: (6.3.5.A) IF Controlled Bleedoff flow is Lost or Low, Then ENSURE: FAULTED V2505 RCP Bleedoff Cntmt Isol. Is open. STEP
_____ SAT STANDARD: ATTEMPT to OPEN V2505 RCP Bleedoff Cntmt Isol.
_____ UNSAT EXAMINERS NOTE: V2505 will not open COMMENTS:
STEP 2: (6.3.5.B) IF Controlled Bleedoff flow is Lost or Low, Then ENSURE:
V2524 RCP Bleedoff Cntmt Isol. Is open. _____ SAT STANDARD: VERIFIES V2524 RCP Bleedoff Cntmt Isol is open. _____ UNSAT EXAMINERS CUE:
COMMENTS:
JPM NRC S-1 Rev 0 Simulator Page 4 of 8
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CONTINGENCY ACTION FAULTED STEP STEP 3 (6.3.5.1) IF normal Controlled Bleedoff can NOT be VERIFIED, Then open V2507 RCP Bleedoff Relief Stop Vlv.
_____ SAT STANDARD: OPEN V2507 RCP Bleedoff Relief Stop Vlv. Recognize multiple seal failures and cavity leakage rising / alarm. _____ UNSAT EXAMINERS NOTE: Upon opening V2507, three seals fail on 2B1 RCP. One minute later Reactor Cavity leakage increases and cavity leakage alarm annunciates.
EXAMINERS CUE:
COMMENTS:
STEP 4: (6.3.7) IF three seals have failed Then: CRITICAL STEP A. TRIP the Reactor
_____ SAT STANDARD: TRIP the Reactor
_____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 5: (6.3.7) IF three seals have failed Then:
_____ SAT B. TRIP the Turbine
_____ UNSAT STANDARD: TRIP the Turbine EXAMINERS CUE:
COMMENTS:
JPM NRC S-1 Rev 0 Simulator Page 5 of 8
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6: (6.3.7) Done IF three seals have failed Then: CRITICAL STEP C. STOP the affected RCP(s)
_____ SAT STANDARD: STOP the 2B1 RCP EXAMINERS CUE: The JPM is complete when the 2B1 RCP has been stopped. _____ UNSAT COMMENTS:
END OF TASK STOP TIME: ____________
JPM NRC S-1 Rev 0 Simulator Page 6 of 8
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
The Unit is at 100%. RCP controlled bleedoff flow has been lost.
INITIATING CUES:
The US directs you to investigate the loss of RCP controlled bleedoff, in accordance with 2-0120034 Reactor Coolant Pump.
NRC S-1 7 of 8
JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET
- 1. Restore IC-1
NRC S-1 8 of 8
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESTORE POWER TO 2B3 4.16KV BUS FROM OFFSITE - UNIT 2 NRC S-2 Applicant Examiner
JOB PERFORMANCE MEASURE Task: 07052015, RESTORE A 4160 V BUS NORMAL POWER SUPPLY 07052140, RESPOND TO A LOSS OF OFF-SITE POWER Faulted JPM? No Facility JPM #: 0821118 K/A: 062 A4.07 / 3.1 Ability to manually operate and/or monitor in the control room: synchronizing and paralleling of different ac supplies.
Duty Area(s): N/A Task Information: N/A Task Standard:
This JPM is complete when offsite power has been restored to the 2B3 4.16KV bus.
Evaluation Location: Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
2-EOP-99, Appendix D Validation Time: 15 minutes Time Critical: No Tools/Equipment/Procedures Needed:
2-EOP-99, Appendix D Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None NRC S-2 Simulator Page 2 of 10
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is: Restore Power to 2B3 4.16KV Bus From Offsite - Unit 2 The performance level to be used for this JPM is Perform.
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
A Loss of Offsite Power has occurred at Unit 2.
Both EDGs were supplying the vital buses when offsite power was restored.
Table 6, 2-EOP-99 has been completed.
INITIATING CUES:
You are the Desk RCO. The US has directed you to restore the 2B3 bus from offsite IAW 2-EOP-99, Appendix D. Offsite power is available.
NRC S-2 Simulator Page 3 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
STEP 1: 1. ENSURE Table 6, Vital Power Breaker Configuration (LOOP), has been completed for the electrical train(s) supplied by a Unit 2 EDG(s).
_____ SAT STANDARD: Student may VERIFY that Table 6 is COMPLETE.
EXAMINERS CUE: _____ UNSAT EVALUATORS NOTE: The student may want to verify Table 6. That is acceptable.
COMMENTS:
STEP 2: 2. INSERT sync plug and PLACE in the desired ST position. CRITICAL STEP STANDARD: POSITION 2B S/U XFMR sync plug to ST-2B2.
_____ SAT EXAMINERS CUE:
COMMENTS: _____ UNSAT STEP 3: 3. To ENERGIZE the non-vital 4.16 KV bus, CLOSE the associated CRITICAL Startup Transformer breaker. STEP STANDARD: POSITION breaker 20302 to the CLOSED position. _____ SAT EXAMINERS CUE:
_____ UNSAT COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-2 Simulator Page 4 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4: 4. CLOSE breaker 4.16 KV bus tie 2A2 -2A3 (2B2 - 2B3). CRITICAL STEP STANDARD: POSITION breaker 20309 to the CLOSED position.
_____ SAT EXAMINERS CUE:
COMMENTS: _____ UNSAT STEP 5: 5. ENSURE that the amber light is lit on the EDG governor control.
STANDARD: ENSURE Diesel governor control amber light is ON. _____ SAT EXAMINERS CUE:
_____ UNSAT COMMENTS:
STEP 6: 6. INSERT sync plug and PLACE in the Tie position. CRITICAL STEP STANDARD: 2B DG Breaker sync plug is POSITIONED to Tie-2B3.
_____ SAT EXAMINERS CUE:
COMMENTS: _____ UNSAT
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-2 Simulator Page 5 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 7: 7. MATCH voltage using the EDG voltage control. CRITICAL STEP STANDARD: Adjusts Voltage control as necessary to ENSURE Voltage is POSITIONED to MATCH DG (running) to Grid (incoming) voltage.
_____ SAT EXAMINERS CUE:
COMMENTS: _____ UNSAT STEP 8: 8. Using EDG governor control, ADJUST synchroscope to SLOW in the CRITICAL COUNTER CLOCKWISE direction. STEP STANDARD: Governor control POSITIONED until rotating SLOW in the COUNTER- _____ SAT CLOCKWISE direction.
EXAMINERS CUE: _____ UNSAT COMMENTS:
STEP 9: 9. When the synchroscope is in the 12 OCLOCK position, CLOSE breaker CRITICAL 4.16 KV bus tie 2A3-2A2 (2B3-2B2). STEP STANDARD: Breaker 20411 is in the CLOSED position at 12 Oclock. _____ SAT EXAMINERS CUE:
_____ UNSAT COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-2 Simulator Page 6 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 10: 10. PLACE EDG governor control to RAISE position UNTIL load is greater CRITICAL than 100 KW (50 amps) to avoid reverse power trip. STEP STANDARD: Governor control is HELD until load is >100 KW (50 amps) and then _____ SAT released.
EXAMINERS CUE: _____ UNSAT COMMENTS:
STEP 11: 11. ENSURE 2A (2B) EDG load is 100 KW (50 amps) and OPEN breaker CRITICAL DG 4.16 KV BREAKER. STEP STANDARD: ENSURE Governor control is POSITIONED to UNLOAD DG to 100 KW (50 _____ SAT amps), THEN open breaker 20401.
EXAMINERS CUE: _____ UNSAT COMMENTS:
STEP 12: 12. REMOVE the sync plug.
STANDARD: Sync plug is REMOVED. _____ SAT EXAMINERS CUE:
_____ UNSAT COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-2 Simulator Page 7 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13: 13. ENSURE proper restart conditions by amber light indication on BOTH voltage regulator and governor controls.
_____ SAT STANDARD: OBSERVES amber light illuminated on voltage regulator and governor controls.
_____ UNSAT EXAMINERS CUE:
EXAMINERS NOTE: Applicant may have to raise governor control to obtain Amber light.
COMMENTS:
STEP (done): 14. If no ESFAS start signal is present, Then STOP the EDG(s). (The EDG will cooldown at 450 rpm for 10 minutes and then stop)
_____ SAT STANDARD: PLACES 2B EDG start / stop switch to the STOP position.
EXAMINERS CUE: _____ UNSAT COMMENTS:
END OF TASK STOP TIME: __________
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-2 Simulator Page 8 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
- 1. RESTORE JPM IC-33.
- 2. NO lesson is needed for this JPM.
- 3. UNFREEZE the Simulator when the student is ready.
NRC S-2 Simulator Page 9 of 10
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
A Loss of Offsite Power has occurred at Unit 2.
Both EDGs were supplying the vital buses when offsite power was restored.
Table 6 of 2-EOP-99 has been completed.
INITIATING CUES:
You are the Desk RCO. The US has directed you to restore the 2B3 bus from offsite IAW 2-EOP-99, Appendix D. Offsite power is available.
NRC S-2 Page 10 of 10
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO HIGH RADIATION ALARM ON SPENT FUEL MONITORS - UNIT 2 NRC S-3 Simulator Applicant Examiner
JOB PERFORMANCE MEASURE Task: 07025090, Align SFP Ventilation Trains 07067430, Respond To Fuel Handling Accident (Dropped/Damaged Fuel)
Faulted JPM? Yes Facility JPM #: 0821117A K/A: 072 A3.01 / 2.9 Ability to monitor automatic operation of the ARM system, including :
Changes in ventilation alignment.
Duty Area(s): N/A Task Information: N/A Task Standard:
This JPM is complete when the US has been notified that the Fuel Handling Building ventilation line-up has been verified including contingency actions in accordance with 2-AOP-26.02.
Evaluation Location: Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
2-AOP-26.02, Area Radiation Monitors Validation Time: 10 minutes Time Critical: No Tools/Equipment/Procedures Needed:
2-AOP-26.02, Area Radiation Monitors Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None PSL OPS 0821117A/R10 Simulator or U2 Control Room Page 2 of 10
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is: Respond to High Radiation Alarm on Spent Fuel Monitors - Unit 2 The performance level to be used for this JPM is Perform.
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 2 is at 100% power.
Refueling preparations are being made in the Fuel Handling Building with spent fuel movement in the spent fuel pool. Spent Fuel Pool Radiation Monitors, GAG007, GAG008, GAG009, GAG010, GAG011, and GAG012 are in High Alarm.
2-AOP-26.02 is being implemented. The alarms have been verified valid. The fuel movement has been suspended and the FHB has been evacuated.
INITIATING CUES:
You are the Desk RCO.
The US has directed you to verify proper Fuel Handling Building ventilation line-up in accordance with 2-AOP-26.02, Area Radiation Monitors, section 4.2.4, step 4.
PSL OPS 0821117A/R10 Simulator or U2 Control Room Page 3 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
4.2.4 Fuel Handling Building Radiation Monitor Alarm
- 4. IF more than one HIGH Alarm in a train actuated, THEN VERIFY FHB ventilation transfer to SBVS as follows:
STEP 1(4.2.4.4): A. VERIFY the following fans STOPPED:
- HVS-6, Fuel Pool Supply Fan.
- HVS-7, Fuel Handling Bldg Supply Fan.
- HVE-15, Fuel Handling Bldg Exhaust Fan. _____ SAT
- HVE-16A, Fuel Pool Exhaust Fan
- HVE-16B, Fuel Pool Exhaust Fan
- HVE-17, Fuel BLDG H&V Room Exhaust Fan (FHB/52/FH6/E-RAC) _____ UNSAT STANDARD: ENSURES Fans are OFF.
EXAMINERS NOTE: Applicant must call SNPO to verify HVE-17 is OFF EXAMINERS CUE: SNPO reports HVE-17 is STOPPED COMMENTS:
STEP 2 (4.2.4.4): B. VERIFY the following FHB dampers CLOSED:
- D-33, Fuel Hdlg Bldg Inlet Damper
- D-35, Fuel Hdlg Bldg Outlet Damper
- D-31, Fuel Pool Outlet Damper
- D-34, Fuel Hdlg Bldg Inlet Damper
- D-36, Fuel Hdlg Bldg Outlet Damper _____ UNSAT
- D-30, Fuel Pool Inlet Damper
- D-32, Fuel Pool Outlet Damper STANDARD: VERIFY Dampers D-29 through D-36 are CLOSED by observation of Red light off, Green light on.
EXAMINERS CUE:
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-3 Simulator Page 4 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3 (4.2.4.4): C. VERIFY FCV-25-30, Fuel Handling Emerg Vent Vlv, OPEN. FAULTED STEP STANDARD: OBSERVE FCV-25-30 CLOSED.
_____ SAT EXAMINERS CUE:
EVALUATORS NOTE: Faulted Step FCV-25-30 failed to auto OPEN. _____ UNSAT COMMENTS:
CONTINGENCY ACTION: CRITICAL STEP STEP 4 (4.2.4.4): C.1 OPEN FCV-25-30, Fuel Handling Emerg Vent Vlv.
_____ SAT STANDARD: POSITION FCV-25-30 control switch to OPEN.
_____ UNSAT
- EXAMINERS CUE: FCV-25-30 indicates Green light OFF, Red Light ON.
X-4 Alarms as delta-P lowers.
COMMENTS:
STEP 5 (4.2.4.4): D. VERIFY FCV-25-32, SBVS Isolation Valve, is CLOSED. FAULTED STEP STANDARD: OBSERVE FCV-25-32 OPEN.
EXAMINERS CUE: _____ SAT EVALUATORS NOTE: Faulted Step FCV-25-32 failed to auto CLOSE.
_____ UNSAT COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-3 Simulator Page 5 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CONTINGENCY ACTION: CRITICAL STEP STEP 6 (4.2.4.4): D.1 CLOSE FCV-25-32, SBVS Isolation Valve.
_____ SAT STANDARD: POSITION FCV-25-32 control switch to CLOSE.
_____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 7 (4.2.4.4): E. VERIFY HVE-6A, SBVS Exhaust Fan, is ON.
STANDARD: ENSURE HVE-6A is ON.
_____ SAT EXAMINERS CUE:
COMMENTS: _____ UNSAT FAULTED STEP 8 (4.2.4.4): F. VERIFY FCV-25-31, Fuel Handling Emerg Vent Vlv, OPEN. STEP STANDARD: OBSERVE FCV-25-31 CLOSED.
_____ SAT EXAMINERS CUE:
EVALUATORS NOTE: Faulted Step FCV-25-31 failed to auto OPEN. _____ UNSAT COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-3 Simulator Page 6 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CONTINGENCY ACTION: CRITICAL STEP STEP 9 (4.2.4.4): F.1 OPEN FCV-25-31, Fuel Handling Emerg Vent Vlv.
_____ SAT STANDARD: POSITION FCV-25-31 control switch to OPEN.
EXAMINERS CUE: _____ UNSAT COMMENTS:
FAULTED STEP 10 (4.2.4.4): G. VERIFY FCV-25-33, SBVS Isolation Valve, is CLOSED. STEP STANDARD: OBSERVE FCV-25-33 OPEN.
_____ SAT EXAMINERS CUE:
EVALUATORS NOTE: Faulted Step FCV-25-33 failed to auto CLOSE. _____ UNSAT COMMENTS:
CONTINGENCY ACTION: CRITICAL STEP STEP 11 (4.2.4.4): G.1 CLOSE FCV-25-33, SBVS Isolation Valve.
_____ SAT STANDARD: POSITION FCV-25-33 control switch to CLOSE.
EXAMINERS CUE: _____ UNSAT EXAMNERS NOTE: Annunciator V-21, B SBVS INLET ISOL FCV-25-33 OVRLD/CLOSED Alarms.
COMMENTS:
STEP 12 (4.2.4.4): H. VERIFY HVE-6B, SBVS Exhaust Fan, is ON.
STANDARD: ENSURE HVE-6B is ON.
_____ SAT EXAMINERS CUE: Communicate to Applicant task is complete. Applicant should notify US task is complete and discrepancies found. _____ UNSAT COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-3 Simulator Page 7 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP (done): NOTIFY the US that the Fuel Handling Building ventilation line-up has been verified in accordance with 2-AOP-26.02, section 4.2.4, step 4.
FCV-25-30 and FCV-25-31 had to be manually opened, FCV-25-32 and FCV-25-33 had to be manually closed. _____ SAT STANDARD: NOTIFY the US that the Fuel Handling Building ventilation line-up has been VERIFIED and FCV-25-30 and FCV-25-31 had to be manually OPENED _____ UNSAT and FCV-25-32 and FCV-25-33 had to be manually CLOSED.
EXAMINERS CUE: US ACKNOWLEDGES.
COMMENTS:
END OF TASK STOP TIME: __________
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC S-3 Simulator Page 8 of 10
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP
- 1. RESTORE IC-1.
- 2. UNFREEZE the Simulator.
- 3. SELECT the JPM Lesson File Folder.
- 4. OPEN and EXECUTE the lesson for S-3 SFP Rm.Lsn.
- 5. FREEZE the Simulator.
- 7. The lesson will NOT need to be stopped and re-executed for each student after restoring the IC.
- 8. UNFREEZE the Simulator when the student is ready to begin.
NRC S-3 Simulator Page 9 of 10
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 2 is at 100% power.
Refueling preparations are being made in the Fuel Handling Building with spent fuel movement in the spent fuel pool. Spent Fuel Pool Radiation Monitors, GAG007, GAG008, GAG009, GAG010, GAG011, and GAG012 are in High Alarm.
2-AOP-26.02 is being implemented. The alarms have been verified valid. The fuel movement has been suspended and the FHB has been evacuated.
INITIATING CUES:
You are the Desk RCO.
The US has directed you to verify proper Fuel Handling Building ventilation line-up in accordance with 2-AOP-26.02, Area Radiation Monitors, section 4.2.4, step 4.
NRC S-3
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE TRANSFER LETDOWN LEVEL CONTROL TO THE ALTERNATE LCV - UNIT 2 NRC S-4 Applicant Examiner NRC JPM S-4 Rev 0 Simulator Page 1 of 10
JOB PERFORMANCE MEASURE Task: Transfer Letdown Level Control to Alternate LCV Faulted JPM? No Facility JPM #: 0821040 K/A : 004 A2.22 / 3.2 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Mismatch of letdown and changing flows.
Duty Area(s): N/A Task Information: N/A Task Standard: This JPM is complete when Letdown Level Control is transferred to the Alternate Level Control valve.
Evaluation Location: Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
2-NOP-02.02 Charging and Letdown Validation Time: 15 minutes Time Critical: No Tools/Equipment/Procedures Needed:
2-NOP-02.02 Charging and Letdown Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None NRC JPM S-4 Rev 0 Simulator Page 2 of 10
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is: Transfer Letdown Level Control to the Alternate Level Control Valve -
Unit 2 The performance level to be used for this JPM is Perform.
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 2 is operating at 100% power, steady state, MOL conditions. The in-service letdown level control valve (LCV-2110P) has begun to operate erratically, indicating a problem with the valve control circuitry.
INITIATING CUES:
The US has directed you to place the alternate level control valve in service IAW 2-NOP-02.02, Charging and Letdown.
NRC JPM S-4 Rev 0 Simulator Page 3 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
2-NOP-02.02 Charging and Letdown Section 4.8 Swap Level control valves STEP 1 (4.8.1): IF in MODE 1 or 2, THEN PLACE V2520 ION EXCHANGER BYPASS Critical Step VALVE, in BYPASS RESET to minimize reactivity effects of changing letdown temperature. _____ SAT STANDARD: PLACE V2520 to Bypass Reset.
_____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 2 (4.8.2): Slowly REDUCE PIC-2201, LTDN PRESSURE, controller setpoint to 250 psig. Critical Step STANDARD: Slowly ADJUST PIC-2201 to LOWER pressure to 250 psig. _____ SAT EXAMINERS CUE:
EXAMINERS NOTE: Annunciator M-5 Letdown Pressure High/Low is an _____ UNSAT expected alarm.
COMMENTS:
STEP 3 (4.8.3): If in AUTO, Then PLACE HIC-1110, LEVEL controller in MANUAL as follows: Critical Step A. Using the lower Manual controller knob, MATCH HIC-1110, LEVEL, _____ SAT manual and auto controller output signals. .
STANDARD: PREVIEW signal by DEPRESSING the Green B pushbutton and ADJUST _____ UNSAT HIC-1110 manual signal to MATCH auto EXAMINERS CUE:
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 Simulator Page 4 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4 (4.8.3): If in AUTO, Then PLACE HIC-1110, LEVEL controller in MANUAL as follows: Critical Step B. SHIFT HIC-1110, LEVEL, controller to MANUAL. _____ SAT STANDARD: PLACE HIC-1110 to MANUAL by DEPRESSING the Yellow M pushbutton
_____ UNSAT EXAMINERS CUE:
COMMENTS:
NOTE With only one Charging Pump running, dual indication may not be received on both Critical Step Letdown Level Control valves
_____ SAT STEP 5 (4.8.4): PLACE LEVEL CONTROL VALVE switch to BOTH.
STANDARD: POSITION the Letdown Level selector switch to the BOTH position. _____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 6 (4.8.5): VERIFY a rise in letdown flow, as indicated on FIA-2202, FLOW.
STANDARD: VERIFY increasing flow on FIA-2202 _____ SAT EXAMINERS CUE:
_____ UNSAT COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 Simulator Page 5 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 7 (4.8.6): POSITION LEVEL CONTROL VALVE switch to one of the following positions: (circle one) Critical Step LCV-2110P LCV-2110Q
_____ SAT STANDARD: POSITION Letdown Level Control valve selector switch to PCV-2110Q EXAMINERS CUE: _____ UNSAT COMMENTS:
STEP 8 (4.8.7): PERFORM the following:
Critical Step A. ADJUST HIC-1110, LEVEL, controller for minimum flow.
_____ SAT STANDARD: ADJUST to MINIMUM letdown flow as observed on FIA-2202 EXAMINERS CUE: _____ UNSAT COMMENTS:
STEP 9 (4.8.7): PERFORM the following:
B. IF letdown flow is NOT 28-30 gpm, THEN REQUEST I&C to adjust LY-1110, Signal Limiter for Pressurizer Level control, per Section 5.8, Letdown _____ SAT Limiter Adjustment.
STANDARD: Informs I&C of the current minimum letdown flow value and directs _____ UNSAT them to adjust LY1110, Pressurizer Level control signal limiter.
EXAMINERS CUE:
EVALUATORS NOTE: On the Simulator the letdown flow is not exactly 28 gpm, direct the student to continue with the task after I&C is contacted. The procedure does not require waiting for I&C to complete the task.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 Simulator Page 6 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 10 (4.8.8): PLACE HIC-1110, LEVEL controller in AUTO by performing the following:
_____ SAT A. Using upper BIAS control knob and previewing auto signal BALANCE HIC-1110, LEVEL, controller auto and manual output signals.
_____ UNSAT STANDARD: PREVIEW signal by DEPRESSING the Green B pushbutton and ADJUST HIC-1110 auto signal to MATCH manual using the upper BIAS knob.
EXAMINERS CUE:
COMMENTS:
STEP 11 (4.8.8): PLACE HIC-1110, LEVEL controller in AUTO by performing the following: Critical Step B. SHIFT HIC-1110, LEVEL controller to AUTO. _____ SAT STANDARD: PLACE HIC-1110 in AUTO by DEPRESSING the White A pushbutton
_____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 12 (4.8.9): Slowly RAISE PIC-2201, PRESSURE, setpoint to 430 psig.
Critical Step STANDARD: Slowly Adjust PIC-2201 setpoint to RAISE pressure to 430 psig and _____ SAT ENSURE that red needle follows and MATCHES the black needle EXAMINERS CUE: _____ UNSAT COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 Simulator Page 7 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13 (4.8.10): ADJUST HIC-1110, LEVEL, controller for a flow consistent with current plant conditions.
_____ SAT STANDARD: ADJUST HIC-1110 to current plant conditions with the BIAS knob.
EXAMINERS CUE: _____ UNSAT EVALUATORS NOTE: Adjustment is not needed if pressurizer level is at setpoint.
COMMENTS:
STEP 14 (4.8.11): When temperature on TIC-2224, BYPASS TEMPERATURE, Critical Step returns to normal, THEN ENSURE V2520, ION EXCHANGER BYPASS VALVE is in AUTO.
_____ SAT STANDARD: PLACES V2520 to AUTO.
EXAMINERS CUE: _____ UNSAT COMMENTS:
STEP (done): NOTIFY the US that the Letdown Level Control has been transferred to the Alternate Level Control valve, LCV-2110Q and that I&C Department has been notified to adjust LY1110, Pressurizer Level control signal limiter. _____ SAT STANDARD: NOTIFY the US that the Letdown Level Control has been TRANSFERRED to LCV-2110Q. _____ UNSAT EXAMINERS CUE: US Acknowledges.
COMMENTS:
END OF TASK STOP TIME: __________
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 Simulator Page 8 of 10
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP
- 1. RESTORE IC-1.
- 2. UNFREEZE the Simulator.
- 3. No Lesson is needed for this JPM.
NRC JPM S-4 Simulator Page 9 of 10
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 2 is operating at 100% power, steady state, MOL conditions. The in-service letdown level control valve (LCV-2110P) has begun to operate erratically, indicating a problem with the valve control circuitry.
INITIATING CUES:
You are the DRCO. The US has directed you to place the alternate level control valve in service IAW 2-NOP-02.02, Charging and Letdown.
NRC JPM S-4 Page 10 of 10
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESTORE AFW FLOW TO THE 2A AND 2B SG USING 2C AFW PUMP NRC S-5 Applicant Examiner JPM NRC S-5 Rev 0 SIMULATOR Page 1 of 14
JOB PERFORMANCE MEASURE Task: Start the 2C AFW pump and feed the 2A and 2B SG.
Alternate Path JPM? Yes Facility JPM #: N/A K/A: 061 A2.04 / 3.4 Ability to (a) predict the impacts of the following malfunctions or operations on the AFW; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: pump failure or improper operation Duty Area(s): N/A Task Information: N/A Task Standard:
This JPM is completed when the 2C AFW pump mechanical overspeed trip is reset and the 2C AFW pump is feeding the 2A and 2B SG at 200-220 gpm.
Evaluation Location: Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
- 2-AOP-09.02 AUXILIARY FEEDWATER
- 2-NOP-09.02 AUXILIARY FEEDWATER
- Annunciator G-46 Validation Time: 15 minutes Time Critical: No Tools/Equipment/Procedures Needed:
- 2-AOP-09.02 AUXILIARY FEEDWATER.
- 2-NOP-09.02 AUXILIARY FEEDWATER
- Annunciator G-46 Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-5 Rev 0 SIMULATOR Page 2 of 14
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is: Start the 2C AFW Pump and feed the 2A and 2B SG.
The performance level to be used for this JPM is PERFORM.
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
The Unit is in Mode 3 NOP/NOT. 2B AFW pump throttle valve MV-09-10 breaker tripped. The 2A AFW pump motor tripped when started. The 2C AFW pump is ready to be started to feed the 2A and 2B SG.
INITIATING CUES:
The US directs you to start the 2C AFW using 2-NOP-09.02 Auxiliary Feedwater step 4.3.6 and feed the 2A and 2B SG.
JPM NRC S-5 Rev 0 SIMULATOR Page 3 of 14
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
2-NOP-09.02 Auxiliary Feedwater STEP 1: (4.3.6) START the 2C Auxiliary Feedwater Pump CRITICAL STEP
_____ SAT STANDARD: OPEN MV-08-12, SG 2B STM To AFW PP 2C.
AND/OR OPEN MV-08-13, SG 2A STM To AFW PP 2C. _____ UNSAT EXAMINERS NOTE: 2C AFW will trip on mechanical overspeed COMMENTS:
STEP 2: (4.3.7) VERIFY turbine speed is stable between 3700 and 3800 rpm AND the FAULTED governor is NOT hunting / oscillating. STEP
_____ SAT STANDARD: RECOGNIZE 2C AFW pump has tripped on mechanical overspeed. Refers to Annunciator summary for G-46
_____ UNSAT EXAMINERS NOTE: Applicant should recognize mechanical overspeed by:
MV-08-3 in closed position AND annunciator G-46 LOCKED IN. (If this was a electrical overspeed, annunciator G-46 would have came in and then cleared).
EXAMINERS CUE:
COMMENTS:
JPM NRC S-5 Rev 0 Simulator Page 4 of 14
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3: Refer to Annunciator summary for G-46, 2C AFW Pump Turbine Failure/Trip/OVRLD/SS Isol. _____ SAT STANDARD: RECOGNIZE directions from Annunciator summary If 2C AFW Pump _____ UNSAT Tripped, Then GO TO 2-AOP-09.02 AUXILIARY FEEDWATER EXAMINERS CUE:
COMMENTS:
2-AOP-09.02 AUXILIARY FEEDWATER STEP 4: (4.2.5.1) IF 2C AFW pump tripped due to mechanical or electrical overspeed _____ SAT trip, THEN PERFORM Attachment 1, Resetting 2C AFW Pump Following Overspeed Trip.
_____ UNSAT STANDARD: REFERS to Attachment 1 of 2-AOP-09.02 AUXILIARY FEEDWATER EXAMINERS CUE:
COMMENTS:
2-AOP-09.02 AUXILIARY FEEDWATER CRITICAL ATTACHMENT 1 STEP STEP 5: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT A. CLOSE MV-08-12, SG 2B STM TO AFW PP 2C (RTGB-202)
_____ UNSAT STANDARD: CLOSE MV-08-12 SG 2B Steam to AFW PP 2C.
EXAMINERS CUE:
COMMENTS:
JPM NRC S-5 Rev 0 Simulator Page 5 of 14
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, CRITICAL THEN PERFORM the following: STEP B. CLOSE MV-08-13, SG 2A STM TO AFW PP 2C (RTGB-202) _____ SAT STANDARD: CLOSE MV-08-13 SG 2A Steam to AFW Pp 2C.
_____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 7: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, CRITICAL THEN PERFORM the following: STEP
_____ SAT C. PERFORM the following to reset and OPEN MV-08-3, 2C PUMP:
(1) CLOSE MV-08-3, 2C PUMP (RTGB-202 - Key 78) _____ UNSAT STANDARD: CLOSE MV-08-3, 2C PUMP using Key 78 EXAMINERS CUE:
COMMENTS:
JPM NRC S-5 Rev 0 Simulator Page 6 of 14
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 8 (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, CRITICAL THEN PERFORM the following: STEP
_____ SAT C. PERFORM the following to reset and OPEN MV-08-3, 2C PUMP:
(2) If 2C AFW pump tripped due to mechanical overspeed trip, _____ UNSAT THEN PERFORM the following:
- a. RESET the 2C Auxiliary Feedwater Pump mechanical overspeed linkage.
STANDARD: CALL Field Operator to reset the mechanical overspeed linkage EXAMINERS CUE: Field Operator calls back and states mechanical linkage on MV-08-3 has been reset.
COMMENTS:
STEP 9 (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT C. PERFORM the following to reset and OPEN MV-08-3, 2C PUMP: _____ UNSAT (2) If 2C AFW pump tripped due to mechanical overspeed trip, THEN PERFORM the following:
- b. VERIFY top surface of trip tappet nut is in line with the line marked on the head lever to ensure full engagement.
STANDARD: VERIFY with the field operator the proper trip tappet nut engagement .
EXAMINERS CUE: Field operator states the trip tappet nut is in line with the line marked on the head lever.
COMMENTS:
JPM NRC S-5 Rev 0 Simulator Page 7 of 14
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 10: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, CRITICAL THEN PERFORM the following: STEP C. PERFORM the following to reset and OPEN MV-08-3, 2C PUMP: _____ SAT (3) PLACE MV-08-3, 2C PUMP (2C Auxiliar Feedwater Pump), in OPEN
_____ UNSAT STANDARD: TURNS KEY 78 for MV-08-3 to the open position.
EXAMINERS CUE:
COMMENTS:
STEP 11: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT C. PERFORM the following to reset and OPEN MV-08-3, 2C PUMP:
_____ UNSAT (4) VERIFY MV-08-3, THROTTLE / TRIP VALVE FOR AFW PUMP 2C is OPEN.
STANDARD: OBSERVES MV-08-3 red light on green light off.
EXAMINERS CUE:
COMMENTS:
STEP 12: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT D. IF 2C AFW pump is rotating, THEN perform the following:
_____ UNSAT STANDARD: CALLS field operator to determine if 2C AFW pump is rotating EXAMINERS CUE: Field Operator reports back, 2C AFW pump is NOT rotating.
COMMENTS:
JPM NRC S-5 Rev 0 Simulator Page 8 of 14
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT E. PERFORM one of the following to drain oil from the underside of the governor main speed piston. _____ UNSAT (1) WAIT 3 minutes after the pump stops rotating OR (2) PERFORM the following:
- a. PLACE manual control knob on the side of the turbine governor in the FULLY COUNTER-CLOCKWISE idle speed position.
- b. RETURN manual control knob on the turbine governor to FULLY CLOCKWISE maximum speed position.
STANDARD: DETERMINE time since pump stopped rotating. If >3 minutes step 2.a and 2.b not performed. If <3 minutes call field operator to perform step 2.a and 2.b EXAMINERS CUE: If field operator called, state step 2.a and 2.b has been performed.
If less than 3 minutes step E.(2) should be performed.
COMMENTS:
STEP 14: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT F. ENSURE MV-09-11, PUMP 2C TO SG 2A is CLOSED (RTGB-202)
_____ UNSAT STANDARD: VERIFIES MV-09-11 green light on, red light off.
EXAMINERS CUE:
COMMENTS:
JPM NRC S-5 Rev 0 Simulator Page 9 of 14
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 15: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT G. ENSURE MV-09-12, PUMP 2C TO SG 2B is CLOSED (RTGB-202)
_____ UNSAT STANDARD: VERIFIES MV-09-12 green light on, red light off.
EXAMINERS CUE:
COMMENTS:
STEP 16: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, CRITICAL THEN PERFORM the following: STEP H. IF both Steam Generators are intact AND NOT faulted, THEN OPEN the _____ SAT following valves simultaneously:
(1) MV-08-13 SG 2A STM TO AFW PP 2C _____ UNSAT (2) MV-08-12 SG 2B STM TO AFW PP 2C STANDARD: USING two handed operation open MV-08-13 MV-08-12 simultaneously and verifies valves open.
EXAMINERS CUE:
COMMENTS:
STEP 17: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT I. IF either SG is faulted THE OPEN steam supply valve from the NON-FAULTED S/G _____ UNSAT STANDARD: DETERMINES step N/A EXAMINERS CUE:
COMMENTS:
JPM NRC S-5 Rev 0 Simulator Page 10 of 14
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 18: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, CRITICAL THEN PERFORM the following: STEP J. IF flow is to be restored to 2A S/G THEN ENSURE SE-09-4, 2C PUMP _____ SAT DISCH to 2A S/G is OPEN STANDARD: OPENS SE-09-4 _____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 19: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, CRITICAL THEN PERFORM the following: STEP K. IF flow is to be restored to 2B S/G THEN ENSURE SE-09-5, 2C PUMP _____ SAT DISCH to 2B S/G is OPEN STANDARD: OPENS SE-09-5 _____ UNSAT EXAMINERS CUE:
CAUTION Excessive Feedwater to a Steam Generator following a Total Loss of Feedwater can result in water hammer and thermal shock when the feed ring is uncovered (level <33% NR).
Following a Total Loss of Feedwater, initial Feedwater flow should be controlled as follows:
- If using Main Feedwater OR Condensate, As low as possible for the first 5 minutes OR until SG level has risen.
COMMENTS:
STEP 20: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, THEN PERFORM the following: _____ SAT L. Throttle MV-09-11, PUMP 2C to S/G 2A, to establish required flowrate to the 2A steam generator. _____ UNSAT STANDARD: THROTTLES MV-09-11, PUMP 2C to S/G 2A, to establish required flowrate to the 2A steam generator. Adjusts flow to 2A SG at 200 gpm to 220 gpm EXAMINERS CUE:
COMMENTS:
JPM NRC S-5 Rev 0 Simulator Page 11 of 14
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 21: (1) IF 2C AFW pump tripped due to mechanical or electrical overspeed trip, CRITICAL THEN PERFORM the following: STEP
_____ SAT M. Throttle MV-09-12, PUMP 2C to S/G 2B to establish required flowrate to the 2B steam generator.
_____ UNSAT STANDARD: THROTTLES MV-09-12, PUMP 2C to S/G 2B, to establish required flowrate to the 2B steam generator. Adjusts flow to 2B SG at 200 gpm to 220 gpm EXAMINERS CUE: Advise JPM is complete.
COMMENTS:
END OF TASK STOP TIME: ____________
JPM NRC S-5 Rev 0 Simulator Page 12 of 14
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
The Unit is in Mode 3 NOP/NOT. 2B AFW pump throttle valve MV-09-10 breaker tripped. The 2A AFW pump motor tripped when started. The 2C AFW pump is ready to be started to feed the 2A and 2B SG.
INITIATING CUES:
The US directs you to start the 2C AFW using 2-NOP-09.02 Auxiliary Feedwater step 4.3.6 and feed the 2A and 2B SG.
Page 13 of 14 NRC S-5
JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET
- 1. Restore IC-50
Page 14 of 14 NRC S-5
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE ESTABLISH ONCE-THROUGH COOLING - UNIT 2 NRC S-6 Simulator Applicant Examiner
JOB PERFORMANCE MEASURE Task: Establish Once-Through Cooling Faulted JPM? Yes Facility JPM #:
K/A: 006 ECCS A4.02 / 4.0 Ability to manually operate and/or monitor in the control room: Valves Duty Area(s): N/A Task Information: N/A Task Standard:
This JPM is complete when once-through cooling has been established, safety injection flow to the RCS has been verified and US has been informed that the task is complete.
Evaluation Location: Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
2-EOP-15, Functional Recovery, RCS and Core Heat Removal, Success Path 3 2-EOP-99, Figure 2 Validation Time: 20 minutes Time Critical: No Tools/Equipment/Procedures Needed:
2-EOP-15, Functional Recovery, RCS and Core Heat Removal, Success Path 3 2-EOP-99, Figure 2 Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None NRC S-6 Simulator Page 2 of 17
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is: Establish Once-Through Cooling on Unit 2 The performance level to be used for this JPM is Perform This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 2 is experiencing a total loss of feedwater event. All attempts to restore main and auxiliary feedwater have been unsuccessful, and both steam generator levels indicate less than 15% wide range. The US has determined that once-through cooling will be established.
INITIATING CUES:
You are the Desk RCO. The US has directed you to establish once-through-cooling IAW 2-EOP-15, RCS and Core Heat Removal - HR-3, Success Path 3 - Once-Through-Cooling, and verify SI flow IAW 2-EOP-99, Figure 2.
NRC S-6 Simulator Page 3 of 17
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
2-EOP-15, Functional Recovery, RCS & Core Heat Removal HR-3, Success Path 3, Once-Through-Cooling STEP 1 (4.6.1A): DE-ENERGIZE ALL Pressurizer Heaters. CRITICAL STEP STANDARD: POSITION all Pressurizer Heaters control switches to OFF.
_____ SAT EXAMINERS CUE:
EVALUATORS NOTE: _____ UNSAT COMMENTS:
STEP 2 (4.6.1B): If Main Condenser is available, Then PERFORM BOTH the following: CRITICAL STEP
- 1. BLOCK MSIS
_____ SAT STANDARD: DETERMINE that Main Condenser is AVAILABLE. When MSIS BLOCK permissive annunciates, block MSIS. _____ UNSAT EXAMINERS CUE:
EXAMINERS NOTE: MSIS BLOCK will not be in at this time. Applicant will need to monitor plant conditions and be aware of block annunciator as SBCS valves and ADVs are opened.
COMMENTS:
NRC S-6 Simulator Page 4 of 17
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3 (4.6.1B): If Main Condenser is available, Then PERFORM BOTH the following: CRITICAL STEP
- 2. ENSURE ALL Steam Bypass Valves are OPEN.
_____ SAT STANDARD: POSITION SBCS controllers to manual and open all five SBCS valves
_____ UNSAT EXAMINERS CUE:
EXAMINERS NOTE: Although not procedurally driven, SBCS permissive switch should be taken to on at this time. If this is not performed, the SBCS valves will close when SG pressure reaches 806 psia.
COMMENTS:
STEP 4 (4.6.1.C) ENSURE ALL available Atmospheric Dump Valves are OPEN. CRITICAL STEP STANDARD: POSITION all four ADVs to OPEN.
_____ SAT EXAMINERS CUE:
COMMENTS: _____ UNSAT STEP 5 (4.6.1.D): ENSURE ALL RCPs are STOPPED.
STANDARD: DETERMINE that all RCPs are STOPPED. _____ SAT EXAMINERS CUE:
_____ UNSAT COMMENTS:
NRC S-6 Simulator Page 5 of 17
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6 (4.6.1.E): ENSURE SIAS and CIAS are ACTUATED. CRITICAL STEP STANDARD: DEPRESS the think pushbutton above each switch and POSITION SIAS Train A and Train B actuation switches to SIAS ON.
_____ SAT VERIFY SIAS and CIAS Trains A and B have ACTUATED.
EXAMINERS CUE: _____ UNSAT EVALUATORS NOTE: SIAS and CIAS may AUTO Actuate prior to MANUAL Actuation. If AUTO actuation has occurred, this is not a CRITICAL STEP.
COMMENTS:
STEP 7 (4.6.1.F): ENSURE BOTH of the following:
- 1. BOTH HPSI pumps are RUNNING.
. _____ SAT STANDARD: OBSERVE HPSI Pump 2A and 2B are running.
EXAMINERS CUE: _____ UNSAT COMMENTS:
NRC S-6 Simulator Page 6 of 17
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 8 (4.6.1.F): ENSURE BOTH of the following:
- 2. ALL cold leg injection valves are OPEN. _____ SAT STANDARD: OBSERVE that all cold leg injection valves are OPEN. _____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 9 (4.6.1.G): ENSURE ALL available charging pumps are RUNNING. CRITICAL STEP STANDARD: POSITION all available charging pump control switches to START, if not already running. _____ SAT EXAMINERS CUE:
_____ UNSAT EVALUATORS NOTE: 2C Charging pump must be manually STARTED and is the critical step.
COMMENTS:
STEP 10 (4.6.1.H): ENSURE BOTH PORV block valves are OPEN. FAULTED STEP STANDARD: POSITION PORV block valve V1477 control switch to OPEN. Identifies breaker tripped on V1477 _____ SAT EXAMINERS CUE: If field operator called to reset breaker, wait until end of steps to call that breaker is reset. _____ UNSAT EXAMINERS NOTE: PORV block valve V1476 is already open. PORV block valve V1477 breaker will trip as soon as the switch is taken to open. Applicant may call the field operator at this time to reset breaker.
COMMENTS:
NRC S-6 Simulator Page 7 of 17
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 11(4.6.1.H.1): IF ONE PORV Block Valve is OPEN Then continue steps to initiate Once Through Cooling.
_____ SAT STANDARD: DETERMINES V1476 block valve is open and continues with procedure.
_____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 12 (4.6.1.I): WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, and BOTH PORV block valves are open, Then OPEN BOTH PORVs.
- 1. ENSURE PORV control switches are in OFF. _____ SAT STANDARD: VERIFY V1474 and V1475 control switches are in OFF.
_____ UNSAT EXAMINERS CUE:
EVALUATORS NOTE: Both PORV switches should already be in OFF.
COMMENTS:
NRC S-6 Simulator Page 8 of 17
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13 (4.6.1.I): WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, and BOTH PORV block valves are open, Then OPEN BOTH PORVs.
_____ SAT
- 2. PULL at least TWO RPS Hi Pzr Press bistables.
STANDARD: Unscrews and pulls at least two RPS Hi Pzr Press bistables . _____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 14 (4.6.1.I): WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, FAULTED and BOTH PORV block valves are open, Then OPEN BOTH PORVs. STEP
- 3. VERIFY BOTH PORVS OPEN.
_____ SAT STANDARD: Determine PORV V1475 and PORV V1474 did not open.
EXAMINERS CUE: _____ UNSAT EXAMINERS NOTE: PORV 1475 will NOT open until its block valve V1477 is open due to P of 50 psia across valve.
COMMENTS:
NRC S-6 Simulator Page 9 of 17
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 15 (4.6.1.I.1): WHEN at least ONE HPSI pump is RUNNING with a cold leg CRITICAL flowpath, and at least ONE PORV block valve is OPEN, Then PERFORM STEP the following:
D. CONTINUE efforts to OPEN the second PORV and PORV Block _____ SAT Valve.
STANDARD: CALL the field operator to determine the status of the Breaker for Block _____ UNSAT Valve V1477 (breaker 2-42002 (secondary isol.) and 2-42007 (Reg. Guide 1.63 Isol.) at 480V MCC 2B5) When breaker reset and block valve V1477 open, verifies PORV V1475 opens.
EXAMINERS CUE: Call as field operator and state breaker 2-42002 is in the tripped condition. Reset breaker when requested by Applicant.
EXAMINERS NOTE: There is no way to remotely open PORV V1474 if pulling RPS bistables did not open valve.
COMMENTS:
STEP 16 (4.6.1.I.1): WHEN at least ONE HPSI pump is RUNNING with a cold leg flowpath, CRITICAL and at least ONE PORV block valve is OPEN, Then PERFORM the STEP following:
D. CONTINUE efforts to OPEN the second PORV and PORV Block _____ SAT Valve.
STANDARD: OPEN PORV block valve V1477 when breaker 2-42001 is reset. _____ UNSAT EXAMINERS CUE:
COMMENTS:
NRC S-6 Simulator Page 10 of 17
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 17 (4.6.1.J): When once through cooling has been established, Then: CRITICAL STEP
- 1. Close Atmosphere Dump Valves (ADVs).
STANDARD: POSITION both ADVs to CLOSE. If controller is AUTO / MANUAL, use _____ SAT pushbutton on controller and set to 0. If manual switches used hold switch to closed position until red light off and green light on.
_____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 18 (4.6.1.J): When once through cooling has been established, Then: CRITICAL STEP
- 2. Close Main Steam Isolation Valves.
STANDARD: POSITION both MSIVs to CLOSE. _____ SAT EXAMINERS CUE: _____ UNSAT EVALUATORS NOTE:
COMMENTS:
NRC S-6 Simulator Page 11 of 17
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 19 (4.6.1.J): When once through cooling has been established, Then:
- 3. Close Main Steam Isolation Bypass Valves.
_____ SAT STANDARD: DETERMINE that both MSIV Bypass Valves are CLOSED.
_____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 20 (4.6.1.J): When once through cooling has been established, Then:
- 4. Close Steam Generator Blowdown Isolation Valves.
_____ SAT STANDARD: DETERMINE that all 4 Blowdown Isolation Valves are CLOSED.
_____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 21 (4.6.1.J): When once through cooling has been established, Then:
- 5. Verify Steam Generator Safety Valves are CLOSED.
_____ SAT STANDARD: DETERMINE from NPO report that all Steam Generator Safety Valves are CLOSED.
_____ UNSAT EXAMINERS CUE: When contacted, the NPO reports that NO Steam Generator Safety Valves are open.
COMMENTS:
NRC S-6 Simulator Page 12 of 17
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 22 (4.6.1.K); If Steam Generator pressure approaches 985 psig (1000 psia),
Then OPERATE ADVs as necessary to maintain S/G pressure between 835 and 915 psig (850 and 930 psia).
_____ SAT STANDARD: DETERMINE that both Steam Generator pressures are below 985 psig and are STABLE.
_____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 23 (4.6.2): Maximize SI Flow PERFORM ALL of the following:
_____ SAT A. ENSURE ALL available SI Pumps are RUNNING.
STANDARD: DETERMINE that SI pumps are RUNNING. _____ UNSAT EXAMINERS CUE:
COMMENTS:
NRC S-6 Simulator Page 13 of 17
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 24 (4.6.2): Maximize SI Flow PERFORM ALL of the following: _____ SAT B. VERIFY adequate SI flow. REFER TO Figure 2, Safety Injection Flow vs. RCS Pressure. _____ UNSAT STANDARD: SUM safety injection flows and VERIFY total flow is to RIGHT of 2 Full Trains in Operation curve on Figure 2 in 2-EOP-99.
EXAMINERS CUE:
COMMENTS:
STEP 25 (4.6.2): Maximize SI Flow PERFORM ALL of the following: _____ SAT C. ENSURE ALL available Charging Pumps are RUNNING.
_____ UNSAT STANDARD: VERIFY all available charging pumps are RUNNING.
EXAMINERS CUE:
COMMENTS:
NRC S-6 Simulator Page 14 of 17
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP (done): NOTIFY the US that the task is COMPLETE.
STANDARD: NOTIFY the US that once-through-cooling has been ESTABLISHED IAW EOP-15, RCS and Core Heat Removal - HR-3, Success Path 3. _____ SAT Through PORV V1475 only.
EXAMINERS CUE: US ACKNOWLEDGES. _____ UNSAT COMMENTS:
END OF TASK STOP TIME: __________
NRC S-6 Simulator Page 15 of 17
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP
- 2. DO NOT UNFREEZE the Simulator.
- 3. SELECT JPM Lesson File Folder.
- 4. SELECT Lesson S-6, OTC.Lsn and EXECUTE the Lesson.
- 5. UNFREEZE the Simulator
- 6. Make a Temporary STOREPOINT if more than one student will perform the JPM.
- 7. The lesson does NOT need to be stopped and re-executed for subsequent students.
- 8. UNFREEZE the Simulator when the student is ready.
NRC S-6 Page 16 of 17
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 2 is experiencing a total loss of feedwater event. All attempts to restore main and auxiliary feedwater have been unsuccessful, and both steam generator levels indicate less than 15% wide range. The US has determined that once-through cooling will be established.
INITIATING CUES:
You are the Desk RCO. The US has directed you to establish once-through-cooling IAW 2-EOP-15, RCS and Core Heat Removal - HR-3, Success Path 3 - Once-Through-Cooling, and verify SI flow IAW 2-EOP-99, Figure 2.
NRC S-6
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE PERFORM EMERGENCY BORATION NRC S-7 Applicant Examiner JPM S-7 SIMULATOR Page 1 of 12
JOB PERFORMANCE MEASURE ST LUCIE NUCLEAR PLANT Task: Emergency Borate Faulted JPM? Yes Facility JPM #:
K/A: 004 A2.14 / 3.8 Ability to (a) predict the impacts of the following malfunctions or operations on the CVCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Emergency boration Duty Area(s): N/A Task Information: N/A Task Standard:
Evaluation Location: Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
Validation Time: 10 minutes Time Critical: No Tools/Equipment/Procedures Needed:
2-EOP-01 Standard Post Trip Actions 2-AOP-02.2 Emergency Boration Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM S-7 SIMULATOR Page 2 of 12
Read to Candidate Directions to candidate for In-Plant or Control Room JPMs:
I will explain the initial conditions and state the task to be performed. All in-plant or control room JPM steps, including any communications, shall be simulated for this JPM. Under no circumstances, unless directed by the examiner, are you to operate any plant equipment. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you finish your assigned task by returning the handout sheet I provided you.
Directions to candidate for Simulator JPMs:
I will explain the initial conditions and state the task to be performed. All simulator JPM steps, including any communications, shall be performed for this JPM. You are to operate any plant equipment that is necessary for the completion of this JPM. The simulator will provide the cues as you perform this JPM.
Ensure you indicate to me when you finish your assigned task by returning the handout sheet I provided you.
Initial Conditions:
A reactor trip on Unit 2 has just occurred following a 45-day run at 100% power.
Initiating Cues:
You are the Board RCO. The US has directed you to perform the actions of 2-EOP-01, Standard Post Trip Actions Reactivity Control Safety Function.
JPM S-7 SIMULATOR Page 3 of 12
START TIME: __________
- 1. DETERMINE Reactivity Control acceptance criteria are met:
STEP 1 (1A): Reactor power is lowering STANDARD: VERIFY reactor power LOWERING using redundant Nuclear Instrumentation _____ SAT EXAMINERS CUE:
_____ UNSAT EVALUATOR NOTE: During this scenario, an instructor should play the part of the Desk RCO and keep the annunciators acknowledged to allow the candidate to focus on the task at hand COMMENTS:
STEP 2 (1B): Verify Startup Rate is negative.
STANDARD: VERIFY Startup Rate is NEGATIVE using redundant Nuclear Instrumentation indications _____ SAT EXAMINERS CUE:
_____ UNSAT COMMENTS:
STEP 3 (1C): VERIFY ALL CEAs are fully inserted..
STANDARD: Using Core Mimic, ADS CRT, and CEDS Control Panel, DETERMINE that CEAs 37, and 45 are FULLY WITHDRAWN _____ SAT EXAMINERS CUE: _____ UNSAT COMMENTS:
JPM S-7 SIMULATOR Page 4 of 12
STEP 4.1(1.C.1): Contingency Actions INITIATE Emergency Boration to achieve adequate SDM.
_____ SAT STANDARD: ENTER 2-AOP-02.02, Emergency Boration
_____ UNSAT EXAMINERS CUE:
EXAMINERS NOTE: Applicant may elect to perform steps from memory. If so, when lineup is complete he should refer to the procedure to verify proper lineup.
COMMENTS:
2-AOP-02.02 EMERGENCY BORATION STEP 5 (4.2.1): VERIFY at least one charging pump is running with control switch in START
_____ SAT STANDARD: OBSERVES at least one charging pump running with 44 gpm flow and switch position in RUN.
_____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 6 (4.2.2): VERIFY the MAKEUP MODE SELECTOR switch is in MANUAL.
STANDARD: OBSERVES Makeup Mode Selector Switch to MANUAL
_____ SAT EXAMINERS CUE:
COMMENTS: _____ UNSAT STEP 7 (4.2.3): VERIFY V2525, BORON LOAD CONTROL VALVE is CLOSED.
STANDARD: OBSERVES V2525 is CLOSED
_____ SAT EXAMINERS CUE:
COMMENTS: _____ UNSAT JPM S-7 SIMULATOR Page 5 of 12
STEP 8 (4.2.4): PERFORM the following to Emergency Borate using V2514, EMERGENCY BORATE:
A. Start at least one of the following: _____ SAT
- 2A (BORIC ACID PUMP)
- 2B (BORIC ACID PUMP) _____ UNSAT STANDARD: POSITION 2A or 2B BAM Pump control switch to RUN EXAMINERS CUE:
EVALUATOR NOTE: Since the procedure doesnt specify which pump to run, either one is acceptable. Optimally, however, the candidate should start the pump associated with the Tech Spec designated BAM tank COMMENTS:
STEP 9 (4.2.4): PERFORM the following to Emergency Borate using V2514, EMERGENCY BORATE:
B. IF 2A BORIC ACID PUMP was started, THEN CLOSE V2650, TANK 2A _____ SAT RECIRC VALVE.
STANDARD: POSITION V2650 control switch to CLOSE if 2A BORIC ACID PUMP was _____ UNSAT started.
EXAMINERS CUE:
COMMENTS:
STEP 10 (4.2.4): PERFORM the following to Emergency Borate using V2514, EMERGENCY BORATE:
_____ SAT C. IF 2B BORIC ACID PUMP was started, THEN CLOSE V2651, TANK 2B RECIRC VALVE.
_____ UNSAT STANDARD: POSITION V2651 control switch to CLOSE if 2B BORIC ACID PUMP was started EXAMINERS CUE:
COMMENTS:
JPM S-7 SIMULATOR Page 6 of 12
STEP 11 (4.2.4): PERFORM the following to Emergency Borate using V2514, EMERGENCY FAULTED BORATE: STEP D. OPEN V2514 EMERGENCY BORATE.
_____ SAT STANDARD: POSITION V2514 control switch to OPEN and OBSERVE that valve does NOT open.
_____ UNSAT EXAMINERS CUE:
EVALUATOR NOTE:
COMMENTS:
STEP 12 (4.1): Contingency Actions
_____ SAT STANDARD: GO TO Section 4.2 Step 5 EXAMINERS CUE: _____ UNSAT COMMENTS:
STEP 13 (4.2.5): IF unable to Emergency Borate using V2514, THEN PERFORM the following:
A. STOP the running BORIC ACID PUMPS _____ SAT STANDARD: POSITIONS the control switch for the 2A and 2B BORIC ACID PUMPS to the STOP position
_____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 14 (4.2.5): IF unable to Emergency Borate using V2514, THEN PERFORM the following: FAULTED STEP B. OPEN V2508 VALVE (BA Gravity Feed B)
STANDARD: POSITION V2508 VALVE (BA Gravity Feed B) to OPEN and observes the _____ SAT valve does not open.
EXAMINERS CUE: _____ UNSAT COMMENTS:
JPM S-7 SIMULATOR Page 7 of 12
STEP 15 (4.2.5): IF unable to Emergency Borate using V2514, THEN PERFORM the following FAULTED STEP C. OPEN V2509 VALVE (BA Gravity Feed A)
_____ SAT STANDARD: POSITION V2509 VALVE (BA Gravity Feed A) to OPEN and observes the valve does not open.
_____ UNSAT EXAMINERS CUE:
COMMENTS:
STEP 15 (4.2.5): IF unable to Emergency Borate using V2514, THEN PERFORM the following D. CLOSE V2501, VCT OUTLET VALVE. _____ SAT STANDARD: GO TO Section 4.2 Step 6 prior to closing V2501 EXAMINERS CUE: _____ UNSAT EXAMINERS NOTE: If applicant closes V2501 at this time the Charging pumps will trip within a few seconds due to low suction pressure. Applicant should NOT close V2501 at this time.
COMMENTS:
STEP 16 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves CRITICAL STEP failed to OPEN, Then PERFORM the following:
A. OPEN V2504, REFUEL WATER TO CHARGING PUMPS _____ SAT STANDARD: POSITION V2504 to OPEN
_____ UNSAT EXAMINERS CUE:
COMMENTS:
JPM S-7 SIMULATOR Page 8 of 12
STEP 17 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves CRITICAL STEP failed to OPEN, Then PERFORM the following:
B. ENSURE V2501, VCT Outlet Valve Closed
_____ SAT STANDARD: POSITION V2501 to CLOSE.
EXAMINERS CUE: _____ UNSAT COMMENTS:
STEP 18 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following:
C. CLOSE V2508, BA GRAVITY FEED B _____ SAT STANDARD: POSITION V2508 to CLOSE or determines valve did not open from previous _____ UNSAT step.
EXAMINERS CUE:
COMMENTS:
STEP 18 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following:
D. CLOSE V2509 BA GRAVITY FEED A _____ SAT STANDARD: POSITION V2509 to CLOSE or determines valve did not open from previous _____ UNSAT step.
EXAMINERS CUE:
COMMENTS:
JPM S-7 SIMULATOR Page 9 of 12
STEP 20 (4.2.6): IF the Boric Acid Makeup Tanks are unavailable OR both Gravity Feed valves failed to OPEN, Then PERFORM the following:
E. CLOSE V2514 EMERGENCY BORATE _____ SAT STANDARD: POSITION V2514 to CLOSE or determines valve did not open from previous _____ UNSAT step.
EXAMINERS CUE:
COMMENTS:
STEP (done): Notify US that task is complete.
STANDARD: NOTIFY ANPS that Reactivity Control has been verified and is being met with contingencies, emergency boration is in progress via RWT to suction of _____ SAT charging pumps.
EXAMINERS CUE: US ACKNOWLEDGES. THIS JPM IS COMPLETE. _____ UNSAT COMMENTS:
END OF TASK STOP TIME: __________
JPM S-7 SIMULATOR Page 10 of 12
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
Initial Conditions:
A reactor trip on Unit 2 has just occurred following a 45-day run at 100% power.
Initiating Cues:
You are the Board RCO. The US has directed you to perform the actions of 2-EOP-01, Standard Post Trip Actions Reactivity Control Safety Function.
S-7 Page 11 of 12
SIMULATOR JPM SETUP
- 1. RESTORE IC-1, 100% power, MOL.
- 2. UNFREEZE simulator.
- 3. SELECT CONFIGURE and CHANGE to JPM.
- 4. SELECT Lesson S-7 EB Lesson and START the lesson.
- 5. TRIGGER the step to stick out 2CEAs and fail V2514, V2509 and V2508 fail closed.
- 6. TRIGGER the step for reactor trip. The simulator will automatically freeze after 10 seconds.
- 7. MAKE a SNAPSHOT if more than one student will be performing the JPM.
- 8. FREEZE simulator until student is ready. The audible alarms will be reinstated when the simulator is placed in RUN.
S-7 Page 12 of 12
Reminder to the TPE Evaluator Refer to the OJT/TPE Procedure and follow the instructions.
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE PUMP ECCS AREA SUMPS TO RDT POST LOCA -
UNIT 1 NRC C-1 Unit 1 Control Room Applicant Examiner NRC C-1 Unit 1 Control Room Page 1 of 6
JOB PERFORMANCE MEASURE Task: 07006020, Pump ECCS Area Sumps to the Containment (Pump ECCS Area Sumps to the Reactor Drain Tank post LOCA - Unit 1).
Faulted JPM? No Facility JPM #: 0821089 K/A Rating(s): A.04.02, (4.1) ECCS: Ability to manually operate and/or monitor in the control room:
Valves Duty Area(s): N/A Task Information: N/A Task Standard:
This JPM is complete when the US is notified that the ECCS Area Sumps are aligned to the Reactor Drain Tank.
Evaluation Location: Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
1-EOP-03, Loss of Coolant Accident Validation Time: 5 minutes Time Critical: No Tools/Equipment/Procedures Needed:
1-EOP-03, Loss of Coolant Accident, (Step 40)
Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None NRC C-1 Unit 1 Control Room Page 2 of 6
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is:
Align ECCS Area Sumps to the Reactor Drain Tank post LOCA - Unit 1.
The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 1 has experienced a LOCA. RAS has occurred and all normal post-trip power is available.
INITIATING CUES:
You are the Desk RCO. The Unit Supervisor has directed you to align the ECCS Sumps to the Reactor Drain Tank in accordance with 1-EOP-03, Loss of Coolant Accident.
NRC C-1 Unit 1 Control Room Page 3 of 6
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
1-EOP-03, Loss of Coolant Accident Step 40 Align ECCS Sumps to RDT If RAS is present, Then ALIGN the ECCS sumps to the reactor drain tank by performing ALL of the following:
STEP 1 (40.A): PLACE the ECCS Area Leakage System control switch, located on CRAC CRITICAL panel, to the RDT POSITION. STEP STANDARD: POSITION the ECCS Area Leakage System control switch to RDT. _____ SAT EXAMINERS CUE: ECCS Area Leakage System control switch indicates RDT _____ UNSAT COMMENTS:
STEP 2 (40.B): VERIFY ALL of the following:
- 1. HCV-06-9, RDT Pump Suction, CLOSES
_____ SAT
- 2. HCV-06-7, Sump Pump to EDT, CLOSES
- 3. HCV-06-8, Sump Pump to RDT, OPENS _____ UNSAT STANDARD: VERIFY HCV-06-9 and HCV-06-7 are CLOSED and HCV-06-8 is OPEN.
EXAMINERS CUE: HCV-06-9 indicates Green light ON, Red light OFF, HCV-06-7 indicates Green light ON, Red light OFF, HCV-06-8 indicates Green light OFF, Red light ON COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC C-1 Unit 1 Control Room Page 4 of 6
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3 (40.C): PERFORM BOTH of the following on RTGB 105: CRITICAL STEP
- 1. PLACE V6301, Rx Drn Tk Cntmt Isol, to RESET and then to OPEN.
_____ SAT STANDARD: POSITION V6301 control switch to RESET, then to OPEN.
EXAMINERS CUE: V6301 indicates Green light OFF, Red light ON _____ UNSAT COMMENTS:
STEP 4 (40.C): PERFORM BOTH of the following on RTGB 105: CRITICAL STEP
- 2. PLACE V6302, Rx Drain Tank Cntmt Isolation, to RESET and THEN to OPEN. _____ SAT STANDARD: POSITION V6302 control switch to RESET, then to OPEN.
_____ UNSAT EXAMINERS CUE: V6302 indicates Green light OFF, Red light ON COMMENTS:
STEP 5: VERIFY Annunciator Y-19, ECCS Pump Room Leakage Valves Misaligned, is LIT.
STANDARD: VERIFY Annunciator Y-19 is LIT. _____ SAT EXAMINERS CUE: Annunciator Y-19 is LIT
_____ UNSAT COMMENTS:
STEP (done): NOTIFY the US that the ECCS Sumps have been ALIGNED to the RDT.
STANDARD: NOTIFY the US that the ECCS Sumps have been ALIGNED to the RDT.
_____ SAT EXAMINERS CUE: Unit Supervisor ACKNOWLEDGES COMMENTS: _____ UNSAT END OF TASK STOP TIME: __________
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC C-1 Unit 1 Control Room Page 5 of 6
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 1 has experienced a LOCA. RAS has occurred and all normal post-trip power is available.
INITIATING CUES:
You are the Desk RCO. The Unit Supervisor has directed you to align the ECCS Sumps to the Reactor Drain Tank in accordance with 1-EOP-03, Loss of Coolant Accident.
Page 6 of 6 NRC C-1
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE ALIGN UNIT 2 CST TO SUPPLY 1C AFW PUMP NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Applicant Examiner NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 1 of 9
Job Performance Measure NRC P-1 Task Number: 03105050 and 07009055 Task
Title:
Align AFW System in Response to Component Malfunction/Failure Faulted JPM: Yes No Facility JPM # N/A K/A Knowledge of AFW design feature(s) and/or interlock(s) which provide for the following: K4.01 Water sources and priority of use 4.1 Duty Areas: N/A Task Information: N/A Task Standard: N/A Evaluation Location Performance Level Simulator In Plant Perform Simulate Discuss Lab Other
References:
- 1-AOP-09.02, Auxiliary Feedwater Validation Time: 15 Minutes Time Critical Yes No Tools/Equipment/Procedures Needed:
- Standard Personal Protective Equipment
- Flashlight
- Radio
- Watch Stander Key Ring for Locked Valves
- 1-AOP-09.02, Auxiliary Feedwater Specific Safety Concerns, PPE and Hazards associated with the task:
- None.
Radiological Protection and RWP Requirements:
Job Performance Measure NRC P-1 Specific Directions:
- The performance level to be used for this JPM is Perform or Simulate.
(Circle the performance level being used for this implementation of the JPM.)
- This Is Not a time critical JPM.
- During the performance of the task, I will tell you which steps to simulate or discuss.
- I will provide you with the appropriate cues for steps that are simulated or discussed.
- You may use any approved reference materials normally available in the execution of this task, including logs.
- Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
Initial Conditions:
Unit 1 is experiencing a Total Loss of Feedwater event. Unit 1 CST in unavailable, Unit 2 CST level is 43 Feet.
Initiating Cues:
You are the Unit 1 NPO. The Unit 1 Unit Supervisor has directed you to line up the Unit 2 CST to supply the 1C AFW Pump IAW 1-AOP-09.02, Auxiliary Feedwater, Attachment 5, Steps 1.A through 1.D, and 1.F.1 through 1.F.4.
NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 3 of 9
Job Performance Measure NRC P-1 PERFORMANCE CHECKLIST Start Time:
1-AOP-09.02, Auxiliary Feedwater, Attachment 5 Notify Unit 2 Control Room.
STEP 1(1.A).
NOTIFY Unit 2 Control Room that Unit 2 CST will be Standard:
ALIGNED to supply the 1C AFW Pump. _____ Sat
_____ Unsat Examiners Unit 2 Control Room ACKNOWLEDGES Cue:
NOTE Comments:
In the event Unit 2 CST is utilized to supply condensate to Unit 1, a minimum of 182,000 gallons (196) must be maintained in the Unit 2 CST unless Unit 2 is in Modes 4, 5, or 6. This is to ensure that Unit 2 has the capability to cool the RCS to less than 350 degrees.
CAUTION
- During the performance of this attachment, close communications with the Unit 2 Control Room must be maintained to ensure administrative requirements and safety issues are considered in regards to both units.
- In the event the Unit 1 AFW Pump suction pressure decreases to 3 psig during the performance of this attachment, the AFW Pump discharge valves must be throttled to maintain suction pressure.
- Performance of this attachment will require Unit 1 to enter action statement for Tech. Spec. 3.7.1.2 and 3.7.1.3. Unit 2 will be in action statement for Tech.
Spec. 3.7.1.3 and possibly 3.7.1.2 depending on valve selection in Attachment 5 Step 1.C.
NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 4 of 9
Job Performance Measure NRC P-1 STEP 2 (1.B). ENSURE all Unit 1 Auxiliary Feedwater pumps are OFF.
Standard: ENSURE all Unit 1 Auxiliary Feedwater pumps are OFF. _____ Sat All Unit 1 Auxiliary Feedwater pumps are OFF. _____ Unsat Examiners Cue:
Comments:
At the Unit 2 CST, PERFORM one of the following to Critical Step STEP 3 (1.C) establish a flowpath from the Unit 2 CST to Unit 1 AFW pumps:
- 1. IF the Unit 2 CST level is greater than 40 feet, THEN _____ Sat OPEN V12803, CST INLET TO / FROM UNIT 1 ISOL.
(CST/23/N-6/E-21) _____ Unsat Standard: UNLOCK and POSITION V12803 to OPEN (counterclockwise) and then RELOCK.
Examiners V12803 is fully counter clockwise and LOCKED.
Cue:
Initiating Cue gives Unit 2 CST level as 43 Feet. Valve Comments:
does not have to be re-locked to meet the Critical Step.
At the Unit 2 CST, PERFORM one of the following to STEP 4 (1.C) establish a flowpath from the Unit 2 CST to Unit 1 AFW pumps: _____ Sat
- 2. IF the Unit 2 CST level is less than or equal to 40 feet, THEN PERFORM one of the following: _____ Unsat
- OPEN V12801, 2C AFW PUMP SUCT TO / FROM UNIT 1 ISOL. (CST/23/N-14/E-20)
- OPEN V12802, 2A/2B AFW PUMP SUCT TO / FROM UNIT 1 ISOL. (CST/23/N-14/E-20)
Determined to be NA, due to initiating cue.
Standard:
Examiners Initiating Cue gives Unit 2 CST level as 43 Feet.
Cue:
Comments:
NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 5 of 9
Job Performance Measure NRC P-1 OPEN V12805, CST CROSSTIE TO UNIT 1 ISOL. Critical Step STEP 5. (1.D)
(CST/24/N-685/E-1191)
Standard: UNLOCK and POSITION V12805 fully counter _____ Sat clockwise.
_____ Unsat V12805 is Fully counter clockwise Examiners Cue:
Comments: Valve does not have to be re-locked to meet the Critical Step.
To supply 1C AFW pump, PERFORM the following: Critical Step STEP 6. (1.F)
(1) CLOSE V12506, CST OUTLET TO 1C AFW PUMP SUCT ISOL at the Unit 1 CST. (CST/23/N-9/E-19)
_____ Sat Standard: UNLOCK and POSITION V12506 fully clockwise. _____ Unsat Examiners V12506 is fully clockwise.
Cue:
Comments: Valve does not have to be re-locked to meet the Critical Step.
To supply 1C AFW pump, PERFORM the following: Critical Step STEP 7 (1.F).
(2) OPEN V12175, TO/FROM UNIT 2 FROM 1C AFW PUMP SUCT LINE ISOL, at the Unit 1 CST. (CST/21/N-13/E-24)
_____ Sat Standard: UNLOCK and POSITION V12175 fully counter clockwise. _____ Unsat Examiners V12175 is fully counter clockwise.
Cue:
Comments: Valve does not have to be re-locked to meet the Critical Step.
NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 6 of 9
Job Performance Measure NRC P-1 Tosupply 1C AFW pump, PERFORM the following:
STEP 8 (1.F).
_____ Sat (3) ENSURE PI-12-18C, 1C AFW PUMP SUCT PRESS, instrument isolation valve is OPEN. (TRSL/27/N-T3/W-
_____ Unsat TA)
Standard: POSITION Pl-12-18C instrument isolation to fully counter clockwise.
Examiners PI-12-18C instrument isolation valve is fully counter Cue: clockwise.
Comments:
To supply 1C AFW pump, PERFORM the following:
STEP 9 (1.F).
(4) VERIFY greater than 3 psig suction pressure on PI _____ Sat 18C, 1C AFW PUMP SUCTION PRESSURE.
_____ Unsat Standard: VERIFY GREATER THAN 3 psig on PI-12-18C.
Examiners PI-12-18C INDICATES 15 psig.
Cue:
Comments:
NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 7 of 9
Job Performance Measure NRC P-1 STEP 10 (1.F). IF feeding S/Gs with 1C Auxiliary Feedwater Pump, THEN PERFORM the following Critical Step (5) CLOSE V09399, 1C AFW PUMP RECIRC ISOL _____ Sat (TRSL/23/N-T3/W-TA)
_____ Unsat Standard: POSITION V09399 to the fully clockwise position.
Examiners V09399 is fully clockwise.
Cue:
Comments:
STEP 6. Notify Unit 1 Unit Supervisor that the task is complete.
_____ Sat Standard: NOTIFY Unit 1 Unit Supervisor that 1C AFW Pump is lined up to take a suction on the Unit 2 CST IAW 1-AOP- _____ Unsat 09.02, Auxiliary Feedwater.
Examiners Unit 1 Unit Supervisor ACKNOWLEDGES.
Cue:
Comments: If candidate continues onward, then inform him This JPM is complete.
END OF TASK Stop Time:
NRC P-1 Unit 1 and Unit 2 CST, 1C AFW Pump Page 8 of 9
Job Performance Measure NRC P-1 CANDIDATE CUE SHEET Initial Conditions:
Unit 1 is experiencing a Total Loss of Feedwater event. Unit 1 CST in unavailable, Unit 2 CST level is 43 Feet.
Initiating Cues:
You are the Unit 1 NPO. The Unit 1 Unit Supervisor has directed you to line up the Unit 2 CST to supply the 1C AFW Pump IAW 1-AOP-09.02, Auxiliary Feedwater, Attachment 5, Steps 1.A through 1.D, and 1.F.1 through 1.F.5.
NRC P-1 Page 9 of 9
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE HYDROGEN PURGE SYSTEM OPERATION - UNIT 1 Unit 1 RAB 43' FAN ROOM NRC P-2 Applicant Examiner NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 1 of 11
Task: Hydrogen Purge System Operation - Unit 1 Faulted JPM? No Facility JPM #: 0821098 K/A Rating(s): 028 A2.02 / 3.5 Malfunctions or operations on the HRPS; and (b) based on those predictions, use procedures to correct, control or mitigate the consequences of those malfunctions or operations: LOCA condition and related concern over hydrogen Duty Area(s): N/A Task Information: N/A Task Standard:
This JPM is complete when the Hydrogen Purge System is in operation with a 100 CFM flowrate established.
Evaluation Location: Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
- 1-EOP-99, Appendix N, Hydrogen Purge System Operation Validation Time: 20 minutes Time Critical: No Tools/Equipment/Procedures Needed:
- 1-EOP-99, Appendix N, Hydrogen Purge System Operation Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
RWP Required NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 2 of 11
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is: Hydrogen Purge System Operation - Unit 1 The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
The unit is engaged in mitigating a LOCA. SIAS has been reset and RAB Main Exhaust Fan, HVE-10B is running. The TSC and Chemistry have given permission to place the Hydrogen Purge System in operation to ventilate the Containment.
INITIATING CUES:
You are the SNPO. You have been directed by the Unit Supervisor to locally operate the Hydrogen Purge system IAW 1-EOP-99, Appendix N. Establish a 100CFM flowrate using HVE-7B.
NOTE TO EXAMINER:
Initiating cue identifies student as SNPO. No key will be required due to cues provided in steps 9 and 10.
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 3 of 11
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
Operate the Containment Hydrogen Purge System as follows:
STEP 1 (1): ENSURE ONE RAB Main Exhaust Fan, HVE-10A (B), is RUNNING, if available.
_____ SAT STANDARD: ENSURE HVE-10A or HVE-10B is RUNNING
_____ UNSAT EXAMINERS CUE: HVE-10B is RUNNING (from initiating cue)
COMMENTS:
STEP 2 (2) : VERIFY the following valves are LOCKED CLOSED:
V25015, Pen.58 to HVE-7A / 7B Gate - Filter Bypass _____ SAT STANDARD: VERIFY V25015 is LOCKED CLOSED _____ UNSAT EXAMINERS CUE: V25015 handwheel ROTATED CLOCKWISE until hard stop REACHED and LOCKED.
EVALUATORS NOTE: Penetration 58 is between filter train and containment wall COMMENTS:
STEP 3 (2) : VERIFY the following valves are LOCKED CLOSED:
_____ SAT V-25-16, Pen. 58 to HVE-7A / 7B Gate - Filter Bypass STANDARD: VERIFY V-25-16 is LOCKED CLOSED _____ UNSAT EXAMINERS CUE: V-25-16 handwheel ROTATED CLOCKWISE until hard stop REACHED and LOCKED EVALUATORS NOTE: Penetration 58 is between filter train and containment wall COMMENTS:
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 4 of 11
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4 (3) : CLOSE FCV-25-9, Pen-57 to HVE-7 Intake CRITICAL STEP STANDARD: DEPRESS the CLOSE pushbutton for FCV-25-9 until FCV-25-9 indicates CLOSED. _____ SAT EXAMINERS CUE: FCV-25-9 MECHANICAL POINTER INDICATES 0.
Light indication is GREEN _____ UNSAT EVALUATORS NOTE: The pushbutton for FCV-25-9 is located inside Junction Box B1117 on the column south west of FCV-25-9.
The valve position indicator is located on the outside cover of Junction Box B1117. Position indication can also be verified by using the dial indicator and mechanical pointer located on FCV-25-9.
COMMENTS:
STEP 5 (4) : UNLOCK and OPEN the following valves: CRITICAL STEP V25013, Pen. 57 to HVE-7A / 7B Gate Suction
_____ SAT STANDARD: UNLOCK and OPEN V25013
_____ UNSAT EXAMINERS CUE: V25013 handwheel UNLOCKED and ROTATED COUNTER CLOCKWISE until hard stop REACHED EVALUATORS NOTE: Penetration 57 is between filter train and containment wall COMMENTS:
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 5 of 11
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6 (4) : UNLOCK and OPEN the following valves: CRITICAL STEP V-25-14, Pen. 57 to HVE-7A / 7B Gate Suction
_____ SAT STANDARD: UNLOCK and OPEN V-25-14 EXAMINERS CUE: V-25-14 handwheel UNLOCKED and ROTATED _____ UNSAT COUNTER CLOCKWISE until hard stop REACHED EVALUATORS NOTE: Penetration 57 is between filter train and containment wall COMMENTS:
STEP 7 (5): VERIFY V-25-18, HVE-7A / 7B Disch. Gate to SBVS, is CLOSED.
STANDARD: VERIFY V-25-18 is CLOSED _____ SAT EXAMINERS CUE: V-25-18 handwheel ROTATED CLOCKWISE until hard stop REACHED _____ UNSAT EVALUATORS NOTE: V-25-18 is located next to V-25-17 in overhead COMMENTS:
STEP 8 (6): OPEN V-25-17, HVE-7A/7B Disch. Gate to Vent Stack. CRITICAL STEP STANDARD: POSITION V-25-17 to OPEN
_____ SAT EXAMINERS CUE: V-25-17 handwheel ROTATED COUNTER CLOCKWISE until hard stop REACHED
_____ UNSAT EVALUATORS NOTE: Valve is above HVE-6B COMMENTS:
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 6 of 11
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 9 (7): UNLOCK and OPEN the following valves: CRITICAL STEP (location V25011, Makeup Air Before Pen. 56 Gate (19.5 Elev.) of valve)
STANDARD: UNLOCK and OPEN V25011 _____ SAT EXAMINERS CUE: When candidate reaches this step state that V25011 handwheel has been UNLOCKED and OPENED by an other _____ UNSAT operator.
EVALUATORS NOTE: Question the Applicant where the valve is located.
(Located in the Purge valve room, 19.5 between the RAB and Fuel Handling Bldg) When location identified, the above cue may be given.
COMMENTS:
STEP 10 (7) : UNLOCK and OPEN the following valves: CRITICAL STEP (location V-25-12, Makeup Air Before Pen. 56 Gate (19.5 Elev.) of valve)
STANDARD: UNLOCK and OPEN V-25-12 _____ SAT EXAMINERS CUE: When candidate reaches this step state that V-25-12 handwheel has been UNLOCKED and OPENED by an _____ UNSAT other operator.
EVALUATORS NOTE: Question the Applicant where the valve is located.
(Located in the Purge valve room, 19.5 between the RAB and Fuel Handling Bldg) When location identified, the above cue may be given.
COMMENTS:
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 7 of 11
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NOTE CRITICAL Hydrogen Purge Fans will not operate if FCV-25-10 position is between full closed STEP and approximately 10% open.
_____ SAT STEP 11 (8): ENSURE FCV-25-10, HVS-4 Plenum to HVE-7 Intake, is THROTTLED OPEN. _____ UNSAT STANDARD: POSITION FCV-25-10 to THROTTLED OPEN.
EXAMINERS CUE: FCV-25-10 IS ROTATED COUNTER CLOCKWISE, currently at 50%.
EVALUATORS NOTE: Control panel is located on column near north end of the 6A filter train COMMENTS:
STEP 12 (9): START ONE Hydrogen Purge Fan. CRITICAL STEP HVE-7A OR _____ SAT HVE-7B STANDARD: DEPRESS START pushbutton for HVE-7B, (from initiating cue) _____ UNSAT EXAMINERS CUE: HVE-7B RED light ON, GREEN light OFF.
EVALUATORS NOTE: Control panel is located on column next to fans COMMENTS:
STEP 13 (10): THROTTLE OPEN FCV-25-9, Pen-57 to HVE-7 Intake, to obtain between CRITICAL 90 and 100 CFM on FR-25-1, Local Flow Recorder STEP STANDARD: DEPRESS (and hold) THE OPEN PUSHBUTTON until the desired _____ SAT flowrate of between 90 and 100cfm is obtained.
EXAMINERS CUE: FCV-25-9 rotating COUNTER CLOCKWISE, FR-25-1 _____ UNSAT INDICATES approximately 95cfm COMMENTS:
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 8 of 11
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NOTE
- High charcoal temperatures are postulated to occur only as a result of restricted air _____ SAT flows rates less than 55 cfm.
- Iodine desorption occurs at approximately 300°F and charcoal ignition at _____ UNSAT approximately 640°F STEP 14 (11): MONITOR the following on TR-25-2 in the Control Room
- Channel 1, Before Hydrogen Purge Charcoal Absorber (TE-25-18)
- Channel 2, Hydrogen Purge Charcoal Absorber (TE-25-19)
- Channel 3, Hydrogen Purge Charcoal Absorber (TE-25-20)
- Channel 4, After Hydrogen Purge Charcoal Absorber (TE-25-21)
STANDARD: REQUEST Control Room Monitor the above points on TR-25-2 EXAMINERS CUE: Control Room is MONITORING Channels 1, 2, 3 & 4.
COMMENTS:
NOTE CRITICAL Hydrogen Purge Fans will not operate if FCV-25-10 position is between full closed and STEP approximately 10% open.
_____ SAT STEP 15 (12): ADJUST FCV-25-10 to maintain charcoal absorber temperature below alarm set point on TR-25-2 (RTGB-106). _____ UNSAT STANDARD: OPEN FCV-25-10 as necessary to MAINTAIN temperature <190°F EXAMINERS CUE: Control Room informs you that TR-25-2 is Indicating 190°F and Increasing. RCO DIRECTS you to ADJUST flow to MAINTAIN temperature at <190°F.
If asked, Alarm Setpoint is 190°F.
EXAMINERS CUE: Open Pushbutton DEPRESSED momentarily, Control Informs you that TR-25-2 is INDICATING 175°F and Stable EVALUATORS NOTE: Located on the east side of the filter train, Indications by local TE: TI-25-HVE-7-1 and TI-25-HVE-7-2 COMMENTS:
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 9 of 11
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 16 (13): Monitor Plant Stack radiation levels and Containment hydrogen concentration during purge operation.
_____ SAT STANDARD: REQUEST Control Room to MONITOR radiation and hydrogen levels EXAMINERS CUE: Control Room Informs you that they will Monitor Plant _____ UNSAT Vent Radiation levels, and containment hydrogen concentration.
COMMENTS:
END OF TASK STOP TIME: __________
NRC JPM P-2 Rev 0 Unit 1 RAB 43' FAN ROOM Page 10 of 11
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
The unit is engaged in mitigating a LOCA. SIAS has been reset and RAB Main Exhaust Fan, HVE-10B is running. The TSC and Chemistry have given permission to place the Hydrogen Purge System in operation to ventilate the Containment.
INITIATING CUES:
You are the SNPO. You have been directed by the Unit Supervisor to locally operate the Hydrogen Purge system IAW 1-EOP-99, Appendix N. Establish a 100CFM flowrate using HVE-7B.
NRC P-2 Page 11 of 11
St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE DROPPED OR MISALIGNED CEA ABNORMAL OPERATIONS, PERFORM MANIPULATIONS OUTSIDE THE CONTROL ROOM
- UNIT 1 NRC P-3 Cable Spreading Room Unit 1 Applicant Examiner NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 1 of 9
JOB PERFORMANCE MEASURE Task: CEA AOP, Perform Manipulations Outside the Control Room - Unit 1 Faulted JPM? Yes Facility JPM #: 0821111 K/A: 001 K6.11 / 2.9 Knowledge of the effect of a loss or malfunction on the following CRDS components: Location and operation of CRDS fault detection (trouble alarms) and reset system, including rod control annunciator.
Duty Area(s): N/A Task Information: N/A Task Standard:
JPM is complete when IC/OPS notified CEA 62 power has been restored.
Evaluation Location: Performance Level:
Simulator In Plant Lab Other Perform Simulate Discuss X X
References:
1-AOP-66.01 Dropped or Misaligned CEA Abnormal Operations.
Validation Time: 20 minutes Time Critical: No Tools/Equipment/Procedures Needed:
1-AOP-66.01 Dropped or Misaligned CEA Abnormal Operations, Attachment 5.
Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 2 of 9
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is:
CEA ONOP, Perform Manipulations Outside the Control Room - Unit 1 The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 1 was at 100% power late in core life.
The operator was inserting CEAs for ASI control when CEA 62 dropped to the bottom of the core.
Reactor and turbine power were matched.
All attempts from the control room to operate CEA 62 have failed.
INITIATING CUES:
The US has directed the operator to check the status of CEDM coil power supply panels IAW 1-AOP-66.01, Dropped or Misaligned CEA Abnormal Operations, Attachment 5, Section 3.0, Troubleshooting Actions for Inoperable CEA(S).
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 3 of 9
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: __________
ATTACHMENT 5 Section 3.0 STEP 1: (3.0.1) INSPECT affected CEDM power supplies as follows: FAULTED (CPP cabinets, cable spreading room) STEP A. VERIFY red CIRCUIT BREAKER CLOSED light is ON.
_____ SAT STANDARD: VERIFY the RED CIRCUIT BREAKER CLOSED light is ILLUMINATED.
_____ UNSAT EXAMINERS CUE: RED CIRCUIT BREAKER CLOSED LIGHT IS EXTINGUISHED, NOT ILLUMINATED.
COMMENTS:
STEP 2: (3.0.1) INSPECT affected CEDM power supplies as follows: CRITICAL (CPP cabinets, cable spreading room) STEP B. IF red CIRCUIT BREAKER CLOSED light is OFF AND affected _____ SAT CEA has been dropped, THEN OPEN and CLOSE affected CEA CIRCUIT BREAKER. (behind the affected CEAs control panel door) _____ UNSAT STANDARD: OPEN CEA 62s control panel door, and POSITION the circuit breaker to OFF, then POSITION the breaker to ON.
VERIFY the RED CIRCUIT BREAKER CLOSED light is ILLUMINATED.
EXAMINERS CUE: When positioned, the breaker is OFF.
When positioned, the breaker is ON.
If asked, the red CIRCUIT BREAKER CLOSED light is ILLUMINATED.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 4 of 9
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3: (3.0.1) INSPECT affected CEDM power supplies as follows:
(CPP cabinets, cable spreading room)
_____ SAT C. VERIFY white CIRCUIT BREAKER OPEN light is OFF.
_____ UNSAT STANDARD: VERIFY the white CIRCUIT BREAKER OPEN light is NOT ILLUMINATED.
EXAMINERS CUE: WHITE CIRCUIT BREAKER OPEN LIGHT IS NOT ILLUMINATED.
COMMENTS:
STEP 4:(3.0.1) INSPECT affected CEDM power supplies as follows:
(CPP cabinets, cable spreading room)
D. On the affected ACTM, VERIFY green POWER LED is ON. _____ SAT STANDARD: OBSERVE GREEN Power On LED on the Coil Power Programmer timer module ILLUMINATED. _____ UNSAT EXAMINERS CUE: GREEN POWER ON LED IS ILLUMINATED.
COMMENTS:
STEP 5:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on FAULTED rear of CPP cabinets for alarms as follows: STEP A. VERIFY red power supply alarm lights are OFF. (two lights per CEA on rear of CPP cabinets) _____ SAT STANDARD: VERIFY the two red power supply lights for CEA 62 are EXTINGUISHED
_____ UNSAT EXAMINERS CUE: THE TWO POWER SUPPLY LIGHTS FOR CEA 62 ARE ILLUMINATED, ON.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 5 of 9
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:
_____ SAT B. IF any power supply alarm lights are ON, THEN RESET them as follows:
- 1) RECORD lights that are ON. _____ UNSAT STANDARD: RECORDS the two red power supply lights for CEA 62 are ON EXAMINERS CUE: NONE.
COMMENTS:
STEP 7:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on CRITICAL rear of CPP cabinets for alarms as follows: STEP B. IF any power supply alarm lights are ON, THEN RESET them as _____ SAT follows:
- 2) PRESS lights that are ON to reset them to OFF condition.
_____ UNSAT STANDARD: DEPRESS the two red power supply lights for CEA 62.
EXAMINERS CUE: BOTH RED POWER SUPPLY LIGHTS ARE EXTINGUISHED.
COMMENTS:
STEP 8:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:
_____ SAT C. TEST power supply alarm light bulbs on affected CEA as follows:
- 1) PRESS pushbutton for affected CEA on side of CEDM 15 V TRANSIENT MONITOR SYSTEM assembly to latch _____ UNSAT alarm lights ON for bulb-check.
STANDARD: DEPRESS the button on the side of the Transient Monitor System that corresponds to CEA 62, and VERIFY the two red power supply alarm lights are ILLUMINATED.
EXAMINERS CUE: THE TWO RED LIGHTS FOR CEA 62 ARE ILLUMINATED.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 6 of 9
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 9:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:
_____ SAT C. TEST power supply alarm light bulbs on affected CEA as follows:
- 2) RESET alarm lights to OFF condition by pressing them.
_____ UNSAT STANDARD: DEPRESS the two red alarm lights for CEA 62, and VERIFY the two red power supply alarm lights are EXTINGUISHED.
EXAMINERS CUE: THE TWO RED LIGHTS FOR CEA 62 ARE EXTINGUISHED.
COMMENTS:
STEP 10:(3.0.2) INSPECT CEDM 15 V TRANSIENT MONITOR SYSTEM assemblies on rear of CPP cabinets for alarms as follows:
_____ SAT C. TEST power supply alarm light bulbs on affected CEA as follows:
- 3) IF alarm lights are still ON after being reset, THEN NOTIFY I&C. _____ UNSAT STANDARD: DETERMINE step is N/A.
EXAMINERS CUE: NONE.
COMMENTS:
STEP 11:(3.0.3) ENSURE HVA-4 and HVA-5 Cable Spreading Room A/C units are running.
STANDARD: VERIFY HVA-4 and HVA-5 Cable Spreading Room A/C units are running. _____ SAT EXAMINERS CUE: HVA-4 and HVA-5 Cable Spreading Room A/C units are running. _____ UNSAT COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 7 of 9
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 12:(3.0.4) VERIFY cooling fans for CPP cabinet sections 3 through 18 are RUNNING.
STANDARD: VERIFY either visually or by presence of air flow that the fans in sections 3 _____ SAT through 18 are running.
EXAMINERS CUE: FANS IN SECTION 3 THROUGH 18 ARE RUNNING. _____ UNSAT COMMENTS:
STEP 13:(3.0.5) EXAMINE CEAPDS and CEDS and CPP cabinets for abnormal conditions.
STANDARD: VERIFY no abnormal conditions on the cabinets by visual observations and _____ SAT comparing known normal indications to possible abnormal indications.
EXAMINERS CUE: NO ABNORMAL CONDITIONS APPEAR TO EXIST. _____ UNSAT COMMENTS:
STEP 14(3.0.6) NOTIFY I&C of any problems found.
STANDARD: REPORT red CIRCUIT BREAKER ON light and power supply alarm light problems to I&C via telephone. _____ SAT EXAMINERS CUE: I&C ACKNOWLEDGES.
_____ UNSAT COMMENTS:
END OF TASK STOP TIME: __________
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC P-3 CABLE SPREADING ROOM UNIT 1 Page 8 of 9
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 1 was at 100% power late in core life.
The operator was inserting CEAs for ASI control when CEA 62 dropped to the bottom of the core.
Reactor and turbine power were matched.
All attempts from the control room to operate CEA 62 have failed.
INITIATING CUES:
The US has directed the operator to check the status of CEDM coil power supply panels IAW 1-AOP-66.01, Dropped or Misaligned CEA Abnormal Operations, Attachment 5, Section 3.0, Troubleshooting Actions for Inoperable CEA(S).
.
NRC P-3 Page 9 of 9