ML19241A943

From kanterella
Revision as of 22:42, 23 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LERs 78-059/03L-0 & 78-060/03L-0
Date released: 09/12/2019 Download: ML19241A943


LER 78-060/03L-0 on 780827:diesel Generator 2c Would Not Respond to Governor Motor Switch or Voltage Regulator Switch.Caused by Instrument Noise & Failure of Motor Pot.Pot & Fuses Replaced
ML19241A953
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/26/1978
From:
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19241A953 (1)
LER 78-059/03L-0 on 780830:during Rapid Load Reduction from 100% Power,Tavg Exceeded Tech Spec Limits.Caused by Attempt to Maintain Axial Flux Differential within Target Band. Control Rods Driven in
ML19241A949
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/26/1978
From:
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19241A949 (1)
Forwards LERs 78-059/03L-0 & 78-060/03L-0
ML19241A942
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/26/1978
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19241A942 (1)