ML18227B064
| ML18227B064 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point |
| Issue date: | 02/14/1978 |
| From: | Schmidt A Florida Power & Light Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227B064 (9) | |
Text
REGULATORY INFOR~ION DISTRIBUTION SYSTEM S)
,DISTRIBUTION FOR INCOMIWG MATERIAL 0-250 51/335 REC: ORG: SCHMIDT A D DOCDATE: 02/14/78 NRC FL PWR Cc LIGHT DATE RCVD: 02/21/78 DOCTYPE: LETTER NOTAR I ZED: NO COPIES RECEIVED
SUBJECT:
LTR 1 ENCL 1 MONTHLY OPERATING REPT FOR SUBJECT UNITS 3 5 4 AND UNIT i. FOR JANUARY'978.
PLANT NAME: TURKEY PT 03 REVIEWER INITIAL: X JM TURKEY PT 83 DISTRIBUTER INITIAL:
ST LUCIE i>i DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS 44++4~%o+<++<+oo<o MONTHLY OPERATING REPORT FOR GRAY BOOK PREPARATION.
(DI STRI BUT ION CODE A003 >
FOR ACTION: BR CHIEF SC75t CER++W/2 ENCL INTERNAL: G FILE+4W F NRC PDR++W/ENCL MIPC FOR ACTION++W/2 ENCL EXTERNAL: LPDR'S MIAMIi FL++W/ENCL TI C~~W/ENCL NSIC++W/ENCL BNL<NATLAB)4+W/ENCL ACRS CAT B++W/0 ENCL DISTRIBUTION: LTR 10 ENCL 10 CONTROL NBR: 780530005 SIZE: iP+iP+2P
%4%4 4 4 %%%%%%%%4%%%%% k%%%4%%8M+%4%%% THF END
1 "el
%If
FLORIDA POWER & LIGHT COMPANY February 14, -1978 Office of Management Xnformation and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the January, 1978, Operating Summary Repro ts for Turkey Point Unit Noe. 3 and 4 and St. Lucie Un'P No. 1.
f Very truly yours, Cc,a 1 D. Schmidt Vice President Power Resources VTC/bab i, +/
cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire
'e4 "l]
4ae I 'hc'~
780530005 PEOPLE... SERVING PEOPLE
HOHVHG S30IA83S l<0li.llHIHlSi0
SAG"WRY OF OPERATING EXPERIFNCE DOCKET NO. 50-250 Turkey Point UNIT n 978 BY V. T. Chilson
'O'i1PLETED TELEPHONE (305) 552-3830 REPORT MONTH Januar 1978 Turkey Point Unit No. 3 scheduled refueling, maintenance, and inspections continued.
Major Safety-related maintenance performed during the month will be included in a separate Refueling Outage Report to be submitted after the unit is returned to service.
0 SV~in.'IARY OF 'OPERATING EXPERIENCE DOCKET NO. 50-251 Turkey Point UNIT Unit No. 4 DATE Pebruar 14 1978 COMPLETED BY V. T. Chilson TELEPElOiVE (305) 552-3824 REPORT i~mONTH Januar 1978 Turkey Point Unit No. 4 operated at approximately 100% R.P.
except for outage of January 25, 1978. Refer to Unit Shutdowns and Power Reduction Sections of the Operating Status Report, for details of this outage.
Major Safety-related Maintenance performed during the month included the corrective actions taken to ensure operability of the flow path from the, Boric Acid Storage Tank to the charging pump suction line. Refer to Licensee Event Report No. 251-78-1 for additional details.
II
~ ~
'F SL'~21ARY OF OPERATING EXPERIENCE DOCKET NO 50-335 UNIT St. Lucie Unit No. 1 DATE Februar 14, 1978 COMPLETED BY V. T. Chilson TELEPHONE (305)552-3824 REPORT HONTH Januar 1978 St. Lucie Unit No. 1 operated at approximately 100$ R. P.
except for outages of January 13, 23 25; 28, 29, and 31, 1978.
Refer to Unit Shutdowns and Power Reduction Section of the Operating Status Report for additional details of these outages. /
Major Safety-related maintenance performed during the month included the replacement of a failed gasket on the pressur-izer,manway closure head and the replacement of five (5) pressurizer manway clpsure head retaining studs., Refer to Licensee Event Report. No. 335-78-5 for additional details of the inspection and replacement of the pressurizer manway closure head retaining studs.
'4 r~
r ~