ML17157C275

From kanterella
Revision as of 13:50, 8 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Revs to Util 930612 Power Uprate W/Increased Flow Submittal.Lhgr Reduction of 0.70 Will Be Imposed During Single Loop Operation,Based on Discussions W/Ge.Proprietary Sections of NEDC-32071P Encl.Encl Withheld
Date released: 09/18/2017 Download: ML17157C275


Forwards Revs to Util 930612 Power Uprate W/Increased Flow Submittal.Lhgr Reduction of 0.70 Will Be Imposed During Single Loop Operation,Based on Discussions W/Ge.Proprietary Sections of NEDC-32071P Encl.Encl Withheld
ML18030A382
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 04/02/1993
From: Byram R
PENNSYLVANIA POWER & LIGHT CO.
To: MILLER C L
Office of Nuclear Reactor Regulation
References
Download: ML18030A382 (6)
Proposed TS 3.4.1.1.2 Re LCO for Recirculation Loops,Single Loop Operation
ML17157C274
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 04/02/1993
From:
PENNSYLVANIA POWER & LIGHT CO.
To:
References
Download: ML17157C274 (8)