MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-042, Periodic Update of Population Data within 10 and 50 Miles of the Plant2023-03-27027 March 2023 Periodic Update of Population Data within 10 and 50 Miles of the Plant L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-039, Cycle 27 Core Operating Limits Report2023-03-0707 March 2023 Cycle 27 Core Operating Limits Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2023-038, 2022 Annual Operating Report2023-02-28028 February 2023 2022 Annual Operating Report L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan L-2023-019, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20222023-02-15015 February 2023 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2022 L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-08
[Table view] |
Text
VMarch 23, 2015 FPL. L-2015-089 10 CFR 50.4 10 CFR 50.55a U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Re: St. Lucie Unit 2 Docket No. 50-3 89 Response to Request for Additional Information Regarding the Spring 2014 Steam Generator Tube Inspections
References:
- 1. FPL letter L-2014-291 dated September 18, 2014: Steam Generator Tube Inspection Report (NRC ADAMS Ascension # ML14279A237)
- 2. NRC Email Letter dated January 27, 2015: St. Lucie Plant, Unit 2 - Request for Additional Information (RAI) Regarding the Spring 2014 Steam Generator Tube Inspections. (NRC ADAMS Ascension # ML15028A007)
Per Reference 1 above, Florida Power and Light Company (FPL) submitted information summarizing the results of the spring 2014 steam generator tube inspections performed at St.
Lucie, Unit 2. These inspections were performed during refueling outage 21.
By email dated January 27, 2015 (Reference 2), the NRC Staff requested additional information regarding the spring 2014 steam generator tube inspections. The attachment to this letter provides the detailed response to the requests for additional information.
Please contact Richard Sciscente at (772) 467-7156 if there are any questions about this submittal.
Sincerely, Eric Katzman Licensing Manager St. Lucie Plant ESK/rcs Attachment cc: USNRC Regional Administrator, Region II USNRC Senior Resident Inspector, St. Lucie Units 1 and 2 Florida Power & Light Company 6501 S. Ocean Drive, Jensen Beach, FL 34957
L-2015-089 Attachment Page 1 of 6 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING THE SPRING 2014 STEAM GENERATOR TUBE INSPECTIONS By letter dated September 18, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14279A237), Florida Power & Light Company submitted information summarizing the results of the Spring 2014 steam generator tube inspections performed at St. Lucie, Unit 2. These inspections were performed during refueling outage 21.
The NRC staff has reviewed the information the licensee provided and determined that the following additional information is needed in order to complete the review.
RAI-1
Clarify whether the U-bends of rows 1 and 2 were inspected with the bobbin probe.
RESPONSE
Yes, all Row 1 and 2 tubes were inspected full length with the bobbin probe.
RAI-2
Discuss the results of the Plug Visual Inspections. Were all plugs confinned to be present and free of degradation?
RESPONSE
Prior to starting the eddy current examination at the End-of-Cycle 20 (EOC-20) refueling outage in 2014, all of the previously installed hot-leg and cold-leg plugs in Steam Generator 2A and Steam Generator 2B were confirmed to be present in their correct locations. In addition, all of the hot-leg and cold-leg plugs were confirmed to be free from degradation and visible signs of leakage based on the visual examination.
L-2015-089 Attachment Page 2 of 6
RAI-3
Discuss the results of the Supplemental Primary Side Inspections to address Westinghouse NSAL 12-01. Was any degradation of the channel head cladding detected?
RESPONSE
Visual inspection of the steam generators (SGs) at a Westinghouse designed plant showed indications of degradation in the cladding and/or divider plate-io-channel head weld, with exposure and wastage of the channel head base. Westinghouse issued NSAL 12-01 "Steam Generator Channel Head Degradation" on January 5, 2012 and included recommended actions for the visual inspection at other plants. Although the degradation described in NSAL 12-01 is not directly applicable to St. Lucie Unit 2 (per Table 1 of NSAL 12-01), a visual inspection of the primary side channel head bowl (in both SGs) was performed in accordance with the requirements presented in Westinghouse NSAL 12-01. No channel head degradation related to NSAL 12-01 was detected.
RAI-4
Discuss the results of the following Secondary Side Inspection and cleaning activities:
- a. Upper Bundle Flush
- b. Sludge Lance
- c. Foreign object search and retrieval
- d. Upper internals visual inspection
RESPONSE
Upper Bundle Flush and Sludge Lancing were performed in both SGs. A total of 89.5 lbs of sludge was removed from the SGs; 36 lbs. from SG 2A and 53.5 lbs. from SG 2B.
Foreign Object Search and Retrieval (FOSAR) was performed on both SGs at the top-of-tubesheet location. One small piece of foreign material was removed from SGA H/L top-of-tubesheet; no tube wear was associated with the foreign object. The lens and cover from an indexing camera were discovered to be missing during dis-mounting of the water lancing equipment used in SG 2B. A search was performed within and outside of the steam generator but the lens and cover were not found. These parts collectively weigh 4.05 grams and were conservatively assumed to be inside the SG; their impact on SG tube integrity has been evaluated within the corrective action program.
L-2015-089 Attachment Page 3 of 6 The upper steam drum components listed below were visually examined (in both SGs):
- Stabilizers and Water Level Taps
" Recirculation Pipe Flange Assembly
- Feedring inspection port covers
" Manway Hatch to Top of Dryers
- SG-B Lower Separator Support Stuck Studs
- SG-A Lower Separator Support Stuck Studs
- Loose Parts Trapping System Additional inspections included a sample of primary separators, secondary separator perforated plates, drain pipes, the feedring nozzles, other access hatches and inspection ports, and support structures.
The loose part trapping system screens were examined for foreign objects in both SGs. The Loose Parts Trapping Systems remain structurally sound with no signs of structural damage.
Three foreign objects were retrieved from the screens. One retrieved foreign object (in SG 2B) was a piece of gasket material of unknown origin. The other two retrieved foreign objects (one in each SG) were determined to be part of the support system for the feedrings. Additional inspections identified that the feedring supports for both SGs had been damaged due to a water hammer event caused by a steam void in the feedring system. Denting to a j-tube stiffener and some j-tubes was also identified. The damaged supports were repaired during the outage. The function of the feedring was not impacted. The St. Lucie Unit 2 feedrings have a split design (not a full donut) and had bolted inspection ports installed at the ends of each pipe section. The four feedring inspection port covers were found to be loose. All four inspection port covers were replaced with welded end caps during SL2-2 1 to prevent loosening during future operation. No other abnormalities were observed during the Upper Internals visual inspection.
L-2015-089 Attachment Page 4 of 6
RAI-5
Summarize the number of tubes and the number of indications associated with the tube support structures (anti-vibration bars, tube support plates, V-shaped pads, apex of anti-vibration bars).
RESPONSE
EOC-20 Number of Affected Tubes at associated Tube Support Structures Location Mechanism SIG 2A SIG 25 Total Anti-Vibration Bars Wear 2523 1788 4311 U-Bend Apex (AV4/5) Wear 16 6 22 AVB - Transition Tube WearNolumetric 1 0 1 V-Shaped Support Pads Wear 1 1 2 V-Shaped Support Bar Wear 1 0 1 Tube Support Plates Wear 97 107 204 Foreign Objects Volumetric 0 0 0 EOC-20 Number of Indications at associated Tube Support Structures Location Mechanism SIG 2A SIG 2B Total Anti-Vibration Bars Wear 8734 5061 13795 U-Bend Apex (AV4/5) Wear 16 6 22 AVB - Transition Tube WearNolumetric 1 0 1 V-Shaped Support Pads Wear 1 1 2 V-Shaped Support Bar Wear 1 0 1 Tube Support Plates Wear 127 122 249 Foreign Objects Volumetric 0 0 0 SIG Total: 8880 5190 14070 Note: In the above tables,
" The Location listed as "AVB - Transition Tube" refers to the wear indication in SG-A, in Row 41 Column 154, which is discussed in RAI # 7.
- The Location listed as "V-Shaped Support Bar" refers to the wear indication in SG-A, in Row 91 Column 24, which is discussed in RAI # 6.
L-2015-089 Attachment Page 5 of 6
RAI-6
One tube was plugged since it had wear associated with a neighboring tube's V-shaped support pad. Has this phenomenon been observed in the past? Are the V-shaped support pads in close proximity to the neighboring tubes? Would this occurrence be expected given the design (rigidity) of the anti-vibration bar support structure and the spacing between the tubes?
RESPONSE
The tube discussed in the RAI is in Row 91 Column 24 (R91C24) in SG-A of the St. Lucie 2 RSGs and had a wear indication created by contact with the side of the adjacent (neighboring) V-shaped support pad at AV7+18.38, which is in close proximity to the AV8 location. The tube that is supported by the V-shaped support pad is Row 90 Column 23 (R90C23).
This indication (R91C24) is the first reported occurrence of this type of wear. The V-shaped support pads are designed to be in very close proximity to the adjacent tubes (i.e. neighboring tubes). The AVB bars and V-shaped support pads are located at different axial elevations.
Contact between a V-shaped support pad and the adjacent tubes is not expected by design. The contact between the V-shaped support pad and the neighboring tube is most likely due to a misalignment of the V-shaped support pad during manufacturing. With this misalignment, it is then possible that the V-shaped pad that is supporting tube R90C23 to induce wear on the adjacent tube (R91C24).
L-2015-089 Attachment Page 6 of 6
RAI-7
One tube was plugged since the length of the indication associated with the anti-vibration bar was shorter than most anti-vibration bar wear indications. Discuss any insights on this occurrence.
RESPONSE
The indication referred to in RAI-7 is located in the St Lucie Unit-2, steam generator A (SG-A),
tube Row 41 Column 154. To clarify, note that the tube was plugged because the indicated depth measurement using the +Point probe was 41% TW, as discussed in Note 4 of Section "e" of the SL2-21 SG Tube Inspection Report (ML14279A237), not because it had a short axial length. The indication was reported as a single volumetric indication (SVI) at location AV3
+2.02".
This indication is at a location where the top of the U-bend is in close proximity to the bottom of the AVB bar. This location is referred to as the "crossover region" as shown in the sketch below.
AVB Support
, Crossover Region The SVI is due to mechanically-induced wear occurring between the tube and AVB support.
Normally, this indication would be reported and sized as a wear indication, but it was conservatively reported as an "SVI" to give it a unique reporting code in the database. The short axial length of the indication (0.15") is most likely attributed to tube-to-AVB contact over a short span in the "crossover region" as shown in the sketch above.