05000237/FIN-2009005-06
From kanterella
Revision as of 19:38, 20 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Finding | |
---|---|
Title | Mispositioning of a Unit 3 Control Rod at Power |
Description | Mispositioning of a Unit 3 Control Rod at Powe
A finding of very low safety significance and associated NCV of 10 CFR Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, was self-revealed for the mispositioning of a Unit 3 control rod at power. Control rod G-11 was withdrawn one notch contrary to TS SR 3.1.3.3 requirements to insert each withdrawn control rod at least one notch. This was a performance deficiency. The violation was entered into the licensees CAP as IR 993634. Corrective actions included inserting control rod G-11 one notch back to the original position and suspending control rod movement while all rods were verified to be in their correct position. The operator was removed from shift duties and the oncoming shift was briefed of the event. The finding was determined to be more than minor because the finding was associated with the Barrier Integrity Cornerstone attributes of human performance and configuration control of a control rod, and affected the cornerstone objective of providing reasonable assurance that physical design barriers protect the public from radionuclide releases caused by accidents or events. Specifically, the operator withdrew a control rod contrary to expected operation. This added positive reactivity and caused an unanticipated power increase. The inspectors evaluated the finding using the SDP in accordance with IMC 0609, Significance Determination Process, Attachment 0609.04, Phase 1 - Initial Screening and Characterization of Findings, Table 4a for the Fuel Barrier Cornerstone. Per Table 4a, any issue that involves the fuel barrier is screened as Green. This finding had no cross-cutting aspect. |
Site: | Dresden |
---|---|
Report | IR 05000237/2009005 Section 1R22 |
Date counted | Dec 31, 2009 (2009Q4) |
Type: | NCV: |
cornerstone | Barrier Integrity |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.22 |
Inspectors (proximate) | R Jickling C Moore C Phillips D Melendez Colon D Sand F Ramirez J Benjamin J Draper J Mcghee L Kozak M Holmberg M Mitchell M Ring |
INPO aspect | |
' | |
Finding - Dresden - IR 05000237/2009005 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Dresden) @ 2009Q4
Self-Identified List (Dresden)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||